90 FR 94 pg. 21108 - Proposed Agency Information Collection Activities; Comment Request
Type: NOTICEVolume: 90Number: 94Page: 21108
Page: 21108Docket number: [Docket No. FRA-2025-0013]
FR document: [FR Doc. 2025-08792 Filed 5-15-25; 8:45 am]
Agency: Transportation Department
Sub Agency: Federal Railroad Administration
Official PDF Version: PDF Version
[top]
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA-2025-0013]
Proposed Agency Information Collection Activities; Comment Request
AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of information collection; request for comment.
SUMMARY:
Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, this notice announces that FRA is forwarding the Information Collection Request (ICR) summarized below to the Office of Management and Budget (OMB) for review and comment. The ICR describes the information collection and its expected burden. On March 12, 2025, FRA published a notice providing a 60-day period for public comment on the ICR. FRA received no comments in response to the notice.
DATES:
Interested persons are invited to submit comments on or before June 16, 2025.
ADDRESSES:
Written comments and recommendations for the proposed ICR should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/PRAMain. Find the particular ICR by selecting "Currently under Review-Open for Public Comments" or by using the search function.
FOR FURTHER INFORMATION CONTACT:
Ms. Arlette Mussington, Information Collection Clearance Officer, at email: arlette.mussington@dot.gov or telephone: (571) 609-1285 or Ms. Joanne Swafford, Information Collection Clearance Officer, at email: joanne.swafford@dot.gov or telephone: (757) 897-9908.
SUPPLEMENTARY INFORMATION:
The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to issue two notices seeking public comment on information collection activities before OMB may approve paperwork packages. See 44 U.S.C. 3506, 3507; 5 CFR 1320.8 through 1320.12. On March 12, 2025, FRA published a 60-day notice in the Federal Register soliciting public comment on the ICR for which it is now seeking OMB approval. See 90 FR 11872. FRA has received no comments related to the proposed collection of information.
Before OMB decides whether to approve this proposed collection of information, it must provide 30 days' notice for public comment. Federal law requires OMB to approve or disapprove paperwork packages between 30 and 60 days after the 30-day notice is published. 44 U.S.C. 3507(b)-(c); 5 CFR 1320.12(d); see also 60 FR 44978, 44983 (Aug. 29, 1995). The 30-day notice informs the regulated community of their opportunity to file relevant comments and affords the agency adequate time to consider public comments before it renders a decision. 60 FR 44983 (Aug. 29, 1995). Therefore, respondents should submit their respective comments to OMB within 30 days of publication to best ensure having their full effect.
Comments are invited on the following ICR regarding: (1) whether the information collection activities are necessary for FRA to properly execute its functions, including whether the information will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology.
The summary below describes the ICR that FRA will submit for OMB clearance as the PRA requires:
Title: Railroad Signal System Requirements.
OMB Control Number: 2130-0006.
Abstract: The information collected under 49 CFR parts 233, 235, and 236 is used by FRA to monitor railroad compliance with FRA's inspection and testing requirements for signal systems, as well as to review and approve railroad requests to discontinue or materially modify existing signal systems. The information collected is also used by FRA to monitor signal failures ( e.g., failure of a signal appliance, device, method, or system to function or display an indication as required by 49 CFR part 236 that results in a more favorable aspect than intended or other condition hazardous to the movement of a train).
Type of Request: Extension without change (with changes in estimates) of a currently approved collection.
Affected Public: Businesses.
Form(s): FRA F 6180.14.
Respondent Universe: 150? 1 railroads.
Footnotes:
1 ?In this submission, a recent FRA data collection shows approximately 150 railroads, with wayside signaling systems, that must comply with 49 CFR 233.5 and 233.7. When FRA last published a notice in connection with its submission of this ICR (OMB control number 2130-0006), on October 22, 2021, at 86 FR 58722, that notice was based on a Respondent Universe of 754 railroads.
Total Estimated Annual Responses: 943,444.
Total Estimated Annual Burden: 221,312 hours.
Total Estimated Annual Dollar Cost Equivalent: $15,467,984.
FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.
Authority: 44 U.S.C. 3501-3520.
Christopher S. Van Nostrand,
Deputy Chief Counsel.
[FR Doc. 2025-08792 Filed 5-15-25; 8:45 am]
BILLING CODE 4910-06-P