89 FR 240 pgs. 101358-101400 - Establishing a 5G Fund for Rural America

Type: RULEVolume: 89Number: 240Pages: 101358 - 101400
Docket number: [GN Docket No. 20-32; FCC 24-89; FRS 247283]
FR document: [FR Doc. 2024-23404 Filed 12-12-24; 8:45 am]
Agency: Federal Communications Commission
Official PDF Version:  PDF Version
Pages: 101358, 101359, 101360, 101361, 101362, 101363, 101364, 101365, 101366, 101367, 101368, 101369, 101370, 101371, 101372, 101373, 101374, 101375, 101376, 101377, 101378, 101379, 101380, 101381, 101382, 101383, 101384, 101385, 101386, 101387, 101388, 101389, 101390, 101391, 101392, 101393, 101394, 101395, 101396, 101397, 101398, 101399, 101400

[top] page 101358

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 54

[GN Docket No. 20-32; FCC 24-89; FRS 247283]

Establishing a 5G Fund for Rural America

AGENCY:

Federal Communications Commission.

ACTION:

Final rule.

SUMMARY:

In this document, the Federal Communications Commission (Commission or FCC) takes important and necessary steps to implement the 5G Fund for Rural America (5G Fund) to support the build out of advanced, 5G mobile wireless broadband networks for those who live, work, and travel in rural areas. The Commission also in this document resolves the issues raised in the five pending petitions for reconsideration of its 2020 5G Fund Report and Order.

DATES:

Effective January 13, 2025. Compliance with §§?54.322(b), 54.322(g), 54.322(h), 54.322(i), 54.322(j), 54.1014(a), 54.1014(b)(2), 54.1018(a), 54.1018(b), 54.1018(c), 54.1018(d), 54.1019(a)(1), 54.1019(a)(2), 54.1019(a)(3), 54.1019(b), 54.1022(b), and 54.1022(f) is not required until the Commission publishes a document in the Federal Register announcing the compliance date. As of December 13, 2024, instruction 10.b., amending §??54.313, and published November 25, 2020, at 85 FR 75770, is withdrawn.

ADDRESSES:

Federal Communications Commission, 45 L Street NE, Washington, DC 20554.

FOR FURTHER INFORMATION CONTACT:

For additional information on this proceeding, contact Kelly Quinn, Office of Economics and Analytics, Auctions Division, (202) 418-0660 or Kelly.Quinn@fcc.gov, Valerie M. Barrish, Office of Economics and Analytics, Auctions Division, (202) 418-0660 or Valerie.Barrish@fcc.gov. For information regarding the Paperwork Reduction Act of 1995 (PRA) information collection requirements contained in this PRA, contact Cathy Williams, Office of Managing Director, at (202) 418-2918 or Cathy.Williams@fcc.gov.

SUPPLEMENTARY INFORMATION:

This is a summary of the Commission's 5G Fund Second Report and Order and Order on Reconsideration in GN Docket No. 20-32, FCC 24-89, adopted on August 14, 2024 and released on August 29, 2024. The full text of this document is available on the Commission's website at https://www.fcc.gov/document/fcc-reignite-5g-fund-target-investments-rural-communities. To request materials in accessible formats for people with disabilities, send an email to FCC504@fcc.gov or call the Consumer & Governmental Affairs Bureau at 202-418-0530 (voice).

Synopsis

I. Introduction

1. The Commission takes important and necessary steps in the 5G Fund Second Report and

Order and Order on Reconsideration to implement the framework for the 5G Fund for Rural America (5G Fund) to support the build out of advanced, 5G mobile wireless broadband networks for those who live, work, and travel in rural areas. After over a decade of hard work to reach this pivotal moment, the 5G Fund reflects the Commission's persistent efforts to reform and redirect universal service funds for mobile broadband to areas of the country that need them the most. As it finalizes the details for the 5G Fund, the Commission is confident that its conclusions are solidly grounded in the improved mobile coverage data obtained in the Broadband Data Collection (BDC), which is reflected on its new National Broadband Map and provides the Commission with the most comprehensive picture to date about where mobile broadband service is and is not across the entire country. Unquestionably, the Commission's decision to wait to proceed with the 5G Fund Phase I auction until the Commission had these data to rely on has dramatically improved its understanding of where high-speed mobile broadband service is being provided and has significantly enhanced its ability to hold a successful 5G Fund auction. The Commission is now far better informed regarding which communities lack mobile broadband service.

2. As the Commission noted when it adopted the 5G Fund Further Notice of Proposed Rulemaking ( 5G Fund FNPRM ), 88 FR 66781 (Sept. 28, 2023), the National Broadband Map reflects the stark reality that over 14 million homes and businesses nationwide continue to lack access to 5G mobile wireless broadband service. The Commission therefore undertook a tailored effort to refresh the record and reignite the 5G Fund's plan to expand the deployment of 5G service to those rural communities that remain trapped on the wrong side of the digital divide. After careful consideration of the record gathered in this proceeding, the Commission concludes that the determinations it reaches herein will best incentivize the deployment of networks providing advanced, 5G mobile wireless broadband in areas of the country where, absent subsidies, such service will continue to be lacking.

3. Specifically, in this 5G Fund Second Report and Order and Order on Reconsideration, the Commission: (1) modifies the definition of the areas that will be eligible for support in the 5G Fund Phase I auction and include areas in Puerto Rico and the U.S. Virgin Islands that meet this eligible area definition in the 5G Fund Phase I auction; (2) increases the budget for Phase I of the 5G Fund and the Tribal reserve budget; (3) modifies the metric for accepting and identifying winning bids and adopt a service-based weighting factor for bidding in the 5G Fund Phase I auction; (4) explains how it will aggregate areas eligible for 5G Fund support to minimum geographic areas for bidding; (5) explains its approach to generally align the methodologies for demonstrating compliance with the 5G Fund public interest obligations and performance requirements with those used in the BDC; (6) modifies the schedule for transitioning from mobile legacy high-cost support to 5G Fund support consistent with recent legislative amendments; (7) requires each 5G Fund Phase I auction applicant to certify, under penalty of perjury, that it has read the public notice adopting procedures for the auction, and that it has familiarized itself with those procedures and any requirements related to the support made available for bidding in the auction; (8) requires 5G Fund support recipients to implement cybersecurity and supply chain risk management plans as a condition of receiving support; and (9) encourages 5G Fund support recipients to incorporate Open Radio Access Network (Open RAN) technologies in networks funded through the 5G Fund through the use of incentive funding and an opportunity to seek additional time to meet their 5G Fund public interest obligations and performance requirements by the established service deployment milestones.


[top] 4. The Commission also resolves the issues raised in the pending petitions for reconsideration of the 5G Fund Report and Order filed by The Rural Wireless Association, Inc. (RWA) and NTCA-The Rural Broadband Association (NTCA), The Coalition of Rural Wireless Carriers (CRWC), CTIA, Smith Bagley, Inc. (SBI), and 5G Fund Supporters. See 86 FR 6611 (Jan. 22, 2021). With the decisions the page 101359 Commission reaches herein, the Commission advances its extensive efforts that began with the USF/ICC Transformation Order, 76 FR 73830 (Nov. 29, 2011), to modernize high-cost support for mobile broadband services and proceeds with confidence that it is stretching its limited universal service fund dollars to support advanced, 5G mobile wireless broadband service to as many areas where Americans live, work and travel as possible.

II. Background

5. In its October 2020 5G Fund Report and Order, 85 FR 75770 (Nov. 25, 2020), the Commission established the 5G Fund and determined that it would use multi-round reverse auctions to distribute up to $9 billion, in two phases, to retarget mobile universal service in the high-cost program to bring voice and 5G mobile broadband service to rural areas of the country unlikely to otherwise see unsubsidized deployment of 5G-capable networks. In adopting a budget of up to $9 billion for the 5G Fund, the Commission explained that support would be awarded in two phases, with up to $8 billion for Phase I, of which it would reserve $680 million of support for service to Tribal lands, and at least $1 billion in Phase II, as well as any unawarded funds from Phase I. The Commission decided that it would use new, more precise, verified mobile coverage data gathered through the BDC to determine the areas eligible for support in a 5G Fund auction. The Commission defined the areas eligible for support in the 5G Fund Phase I auction as those that lack unsubsidized 4G LTE and 5G broadband service by at least one service provider based on BDC data. The Commission also decided that it would accept bids and identify winning bids in a 5G Fund auction using a support price per adjusted square kilometer. Under this approach, each eligible area would have an associated number of square kilometers that would be subject to an adjustment factor that would assign a weight to each geographic area and apply that adjustment factor to bidding for support amounts, and support amounts for an area would be determined by multiplying an area's associated adjusted square kilometers by the relevant price per square kilometer.

6. The Commission also concluded in the 5G Fund Report and Order that "[r]ural Americans deserve timely deployment of service by legacy recipients of high-cost support that is comparable to what is being offered in urban areas, and [that its] stewardship of the Universal Service Fund demands that [it] specify and clarify the obligations of legacy support recipients." Consistent with this conclusion, the Commission adopted additional 5G public interest obligations and performance requirements, as well as associated reporting requirements, for competitive eligible telecommunications carriers (ETCs) to continue to receive mobile legacy high-cost support. The Commission also adopted a requirement that competitive ETCs receiving mobile legacy high-cost support use an increasing percentage of their support toward the deployment, maintenance, and operation of voice and broadband networks that support 5G service in their subsidized areas. Furthermore, the Commission noted that it would terminate support payments to competitive ETCs receiving mobile legacy high-cost support that fail to comply with their public interest obligations and performance requirements. The Commission explained that such rules would help to ensure that the areas served by legacy support providers enjoyed the benefits that 5G promises.

7. Pursuant to the rules adopted in the 5G Fund Report and Order, both recipients of mobile legacy high-cost support and recipients of 5G Fund auction support are required to meet minimum baseline performance requirements for data speed, latency, and data allowance, including: (1) deploying 5G networks that meet at least the 5G-NR (New Radio) technology standards developed by the 3rd Generation Partnership Project with Release 15 (or any successor release that may be adopted by the Office of Economics and Analytics (OEA) and Wireline Competition Bureau (WCB) after appropriate notice and comment) with median download and upload speeds of at least 35 Mbps and 3 Mbps and with minimum cell edge download and upload speeds of 7 Mbps and 1 Mbps; (2) meeting end-to-end round trip data latency measurements of 100 milliseconds or below; and (3) offering at least one service plan that includes a minimum monthly data allowance that is equivalent to the average United States subscriber data usage. The Commission explained that these performance requirements, along with public interest obligations for reasonably comparable rates, collocation, and voice and data roaming, will ensure that rural areas receive service reasonably comparable to high-speed mobile broadband service available in urban areas from both mobile legacy support recipients and 5G Fund support recipients.

8. To ensure that 5G Fund support recipients meet their public interest obligations and performance requirements in areas where they receive support, the Commission adopted interim and final service deployment milestones along with reporting requirements to monitor their progress. Specifically, the Commission adopted milestones requiring a 5G Fund support recipient to offer 5G service meeting established performance requirements to at least 40% of the total square kilometers associated with the eligible areas for which it is authorized to receive 5G Fund support in a state by the end of the third full calendar year following authorization of support, to at least 60% of the total square kilometers by the end of the fourth full calendar year, and to at least 80% of the total square kilometers by the end of the fifth full calendar year. Moreover, the Commission adopted a final service deployment milestone that would require a 5G Fund support recipient to offer 5G service that meets the established 5G Fund performance requirements to at least 85% of the total square kilometers associated with the eligible areas for which it is authorized to receive 5G Fund support in a state by the end of the sixth full calendar year following authorization of support. Additionally, a 5G Fund support recipient is required to demonstrate by the end of the sixth full calendar year following authorization of support that it provides service that meets the established 5G performance requirements to at least 75% of the total square kilometers within each of its individual biddable areas.


[top] 9. Figure 1 in the 5G Fund Second Report and Order and Order on Reconsideration, titled "USAC Mobile CETC Service Area Boundaries Map," depicts USAC's online map delineating the boundaries of the subsidized service areas of each competitive ETC receiving mobile legacy high-cost support used in determining which areas are subsidized for this purpose. The Commission stated in the 5G Fund Report and Order that it will use Geographic Information Systems (GIS) data from the Universal Service Administrative Company (USAC) delineating the boundaries of the subsidized service areas of each competitive ETC receiving mobile legacy high-cost support in determining which areas are subsidized for this purpose. The 5G Fund Second Report and Order and Order on Reconsideration notes that California, Connecticut, Delaware, Florida, Hawaii, Indiana, Maryland, Massachusetts, Minnesota, New Jersey, Ohio, Pennsylvania, Rhode Island, Vermont, and Washington, DC do not have any page 101360 mobile legacy high-cost support service areas. The charts in Figure 2 in the 5G Fund Second Report and Order and Order on Reconsideration, titled "Percent of a State's Total Area Within a Subsidized CETC Area and the Percent of Total High-Cost Subsidy Directed to That State," and Figure 3 in the 5G Fund Second Report and Order and Order on Reconsideration, titled "Percent of a State's Total Area Within the Subsidized Area of 1, 2, 3, or 4 CETCs," provide more detail about the distribution of mobile legacy high-cost support by state.

10. The Commission decided in the 5G Fund Report and Order that it would wait to hold an auction to award 5G Fund support until it had new, more precise, verified mobile coverage data obtained through the BDC, and explained that waiting for the development of a National Broadband Map was critical to the 5G Fund's success. The Commission's National Broadband Map, which reflects the most recently available data submitted in the BDC concerning mobile broadband service availability, provides us with a substantially improved understanding about where such service is-and is not-available. Moreover, in areas where mobile broadband service is available, this map provides an improved picture of the type(s) of service available, the speeds at which service is available, and the environment(s) in which service is available.

11. Armed with this data, the Commission adopted the 5G Fund FNPRM on September 21, 2023, to refresh the record and help inform the decisions the Commission makes below about how Phase I of the 5G Fund should operate. The 5G Fund FNPRM therefore sought comment on a limited set of issues that are critical to the 5G Fund's success, namely: (1) defining the areas that will be eligible for 5G Fund support; (2) reassessing the budget for the 5G Fund; (3) potentially reconsidering the use of adjusted square kilometers as the metric for accepting bids and identifying winning bids in a 5G Fund auction; (4) aggregating areas eligible for 5G Fund support to minimum geographic areas for bidding; (5) measuring a 5G Fund support recipient's compliance with its public interest obligations and performance requirements based on any modified metric for accepting bids and identifying winning bids; (6) modifying the schedule for transitioning from mobile legacy high-cost support to 5G Fund support, consistent with recent legislative amendments; (7) requiring each 5G Fund Phase I auction applicant to certify, under penalty of perjury, that it has read the public notice adopting procedures for the auction, and that it has familiarized itself with those procedures and any requirements, terms, and conditions related to the support made available for bidding in the auction; (8) requiring 5G Fund support recipients to implement cybersecurity and supply chain risk management plans; (9) determining whether and how this proceeding might create an opportunity to support further deployment of Open Radio Access Network (Open RAN) technologies; and (10) asking how its proposals may promote or inhibit advances in diversity, equity, inclusion, and accessibility, as well the scope of the Commission's relevant legal authority to address any such issues.

III. Identifying Areas Eligible for 5G Fund Support

A. Defining the Areas Eligible for 5G Fund Support

12. The Commission modifies the definition of areas eligible for support in the 5G Fund Phase I auction to be those areas that: (1) show a lack of unsubsidized 5G mobile wireless broadband service at speeds of at least 71 Mbps in an outdoor stationary environment by at least one service provider based on mobile coverage data submitted in the BDC, (2) are not in urban areas, as defined by the U.S. Census Bureau, and (3) contain at least one location or at least some portion of a road. In the 5G Fund Second Report and Order and Order on Reconsideration, the Commission noted that data submitted in the BDC does not include the subsidy status of a reported service or provider, and that to determine whether an area lacks unsubsidized service, it evaluates the subsidy status of a service provider by using information provided from USAC regarding the distribution of mobile legacy high-cost support from the universal service fund and competitive eligible telecommunications carrier (CETC) study boundaries. The Commission also noted that, consistent with the Commission's decision in the 5G Fund Report and Order prohibiting any provider with enforceable 5G deployment obligations to use 5G Fund support to fund such deployments, it expects to give providers with enforceable 5G deployment obligations an opportunity to make pre-auction, binding commitments to deploy 5G in certain areas, thereby removing those areas from the inventory of areas eligible for the auction.


[top] 13. As the Commission noted in the 5G Fund FNPRM, throughout this proceeding, several parties have taken issue with the previously adopted eligible areas definition- i.e., areas where mobile coverage data submitted in the BDC show a lack of both unsubsidized 4G LTE and unsubsidized 5G broadband service by at least one service provider-and have advocated that the Commission more broadly define as eligible for 5G Fund support any areas that lack unsubsidized 5G mobile broadband service. The Commission also received two petitions seeking reconsideration of the eligible areas definition adopted in the 5G Fund Report and Order, both of which ask the Commission to define as eligible for 5G Fund support any area that lacks unsubsidized 5G broadband service. See 86 FR 6611 (Jan. 22, 2021). The Commission is persuaded by the comments filed in response to the 5G Fund FNPRM that, for a variety of reasons, unsubsidized providers of 4G LTE service may lack motivation to upgrade their networks to 5G technology in rural areas and thus may be unlikely to do so without incentives. To provide such incentives, the Commission therefore modifies the definition of eligible areas adopted in the 5G Fund Report and Order. However, the Commission is also mindful that there are rural areas that lack unsubsidized 4G LTE service and thus lack access to any type of advanced high-speed mobile broadband service. Accordingly, as more fully explained in the 5G Fund Second Report and Order, the Commission will apply a service-based weighting factor in 5G Fund Phase I auction bidding to incentivize the deployment of 5G mobile broadband service in areas that lack unsubsidized 4G LTE service. The Commission will use a speed threshold of 5/1 Mbps for purposes of determining the areas that lack unsubsidized 4G LTE in connection with this weighting approach. As noted in the 5G Fund Second Report and Order and Order on Reconsideration, for 4G LTE, the BDC requires mobile broadband service providers to submit propagation maps and propagation model details that demonstrate where mobile wireless users should expect to receive minimum user speeds of 5/1 Mbps at the cell edge, with a cell edge probability of not less than 90% and a cell loading of not less than 50%, in accordance with the Broadband Deployment Accuracy and Technological Availability (Broadband DATA) Act. See 47 U.S.C. 642(b)(2)(B)(ii). page 101361

14. Consistent with the Commission's decision to modify the definition of areas eligible for support in the 5G Fund Phase I auction to be those areas where mobile coverage data submitted in the BDC show a lack of unsubsidized 5G mobile broadband service at speeds of at least 7/1 Mbps in an outdoor stationary environment by at least one service provider, the Commission also grants the Petitions for Reconsideration filed by CRWC, NTCA, and RWA to the extent they request that the Commission define the areas eligible for the 5G Fund Phase I auction as those where BDC data show a lack of unsubsidized 5G mobile broadband service.

1. Technology for Determining Eligible Areas

15. The record overwhelmingly supports modifying the definition of areas eligible for support in the 5G Fund Phase I auction to be those areas where BDC mobile coverage data show a lack of unsubsidized 5G mobile broadband service by at least one service provider, even if those areas are served by 4G LTE service. As the Competitive Carriers Association (CCA) emphasizes, "the 5G Fund should be truly focused on 5G," and "[t]he relevant question for 5G Fund eligibility is the presence or absence of currently-available 5G service in that area." CCA maintains that defining eligibility for 5G Fund support based on this baseline question will extend 5G service to both areas currently receiving only 4G service and those that do not receive 4G service. CCA notes that expanding eligibility to areas in which 4G LTE service is available but 5G service is not "appropriately focuses the 5G Fund on expanding access to 5G service . . . [and] also avoids the potentially harmful consequences of stranding 4G-served areas without the potential for 5G service for an extended period of time."

16. AT&T, Inc. (AT&T) and T-Mobile USA, Inc. (T-Mobile) are the only commenters that support continuing to define eligible areas as those that lack unsubsidized 4G LTE and 5G mobile broadband service. AT&T "supports prioritizing 5G Fund support for areas without 4G LTE or 5G service" and submits that "[t]his could be accomplished by conducting a more targeted 5G Fund Phase I auction based on areas without 4G LTE and 5G service . . . [and] then expand[ing] the eligible areas [for the 5G Fund Phase II auction] to also include those that have 4G LTE service if the BDC maps at the time support [such an expansion]." AT&T argues that "[5G Fund support] should only be expended for areas that will not receive 5G service without private investment" and asserts that "the Commission . . . should first direct [its limited funds] to [areas] most in need-[those] that do not have 4G LTE or 5G service[,] . . . [which] will allow more time for private investment to upgrade 4G LTE coverage areas to 5G without [5G Fund] support but will also eventually allow support in the event it is not economical for a 4G LTE area[?] to be [upgraded] without government support." T-Mobile argues that "[t]argeting unserved areas is consistent with the framework of previous universal service auctions . . . [and] will avoid waste and inefficient use of resources due to overbuilding." T-Mobile submits that retaining the existing eligible areas definition "will also help target funding to areas that lack mobile broadband service, as there are many places throughout the United States that lack even 4G LTE service," and maintains that "[p]rioritizing areas that lack 4G LTE or 5G will ensure that funding is targeted to areas that lack any service."

17. Several commenters address the questions posed by the Commission about what motivations there are for unsubsidized providers of 4G LTE service to upgrade their networks to 5G technology in rural areas. AST&Science LLC (AST&Science), CCA, CRWC, RWA, and Smith Bagley, Inc. (SBI) each submit that there is no reasonable basis to conclude that the provision of unsubsidized 4G LTE service in rural areas serves as an indicator that 5G mobile broadband service will be deployed in those areas absent subsidies. They argue that unsubsidized 4G LTE providers lack incentives and thus have limited motivation to upgrade their networks to support 5G service in rural areas, with AST&Science and CCA specifically noting the financial challenges of such rural upgrades as one of the main reasons. CCA contends that the record in this proceeding clearly demonstrates that the Commission's assumption in the 5G Fund Report and Order that areas with unsubsidized 4G service tend to show a likelihood of unsubsidized 5G deployments such that they should be excluded from 5G Fund eligibility is incorrect and risks widening the digital divide instead of closing it. CRWC, US Cellular, and SBI each cite CRWC's claim in its Petition for Reconsideration of the 5G Fund Report and Order that "it would be[?] premature in the extreme for the Commission to assume [in 2020] that, within the next several years, all rural areas that currently have 4G service will see [deployment of] 5G service [at levels meeting Commission's adopted performance requirements]" and each notes "that the facts appear to bear out [CRWC's earlier assertion]" because "[t]he BDC map [in Figure 1 of the 5G Fund FNPRM ] continues to show vast swaths of rural America lacking unsubsidized 4G LTE service at 5/1 Mbps as well as unsubsidized 5G service at 7/1 Mbps or better." CRWC, US Cellular, and SBI submit that notwithstanding record low interest rates in effect at the time of, and following, the adoption of the 5G Fund Report and Order and recent Commission auctions of spectrum suitable for 5G deployments, "unsubsidized carriers have not rushed in over the past three years to close the mobile service gap in rural America . . . [and] it appears there is a great deal of work to do" to upgrade areas that lack 4G LTE service, let alone upgrading to 5G service. According to US Cellular, another disincentive for providers to upgrade from 4G to 5G is that while upgrades from 3G to 4G LTE service have in the past served to deliver access to new services, such as internet access and streaming, that increased usage and in turn carrier revenues, "almost every American already has a mobile device of some sort, even if they live in an area without high-quality coverage and service [and] [a]s a result, investing to upgrade to 5G-level service does not deliver substantial new revenues to a carrier from non-business customers, at least not yet."


[top] 18. Verizon notes that "[w]hile many areas that have unsubsidized 4G LTE coverage will soon obtain 5G coverage through the operation of the competitive market, some areas with 4G LTE coverage will require universal service support to upgrade to 5G." Verizon submits that the risk of preempting near-term 5G deployments by subsidizing them in areas where unsubsidized 4G LTE networks have been deployed-which the Commission previously sought to avoid-has already been reduced by the extensive unsubsidized 5G deployment that has occurred during the three-year pause in implementation of the 5G Fund, and "will be further reduced by the time the Commission holds the [5G Fund] Phase I auction . . . as those unsubsidized deployments continue to expand. Verizon contends that as a result, "[b]y the time [the Commission] holds the [5G Fund] Phase I auction, it will be more reasonable for the Commission to assume that any remaining 4G LTE-only areas shown on the BDC maps require universal service support to upgrade to 5G." NTCA maintains that "in sparse page 101362 rural areas where the distance between buildings is significant, the population small, and often there is not a major highway passing through the area, there is little to justify or even absorb the cost of delivering 5G [mobile] broadband service" and thus "predicting that entities currently offering unsubsidized 4G LTE coverage in these areas might someday increase that coverage to 5G would miss the mark." NTCA further submits that "[s]uch a baseless predictive judgment would instead result in the very areas the Commission intends to support through the 5G Fund remaining on the wrong side of the digital divide."

19. T-Mobile is the only commenter that argues that the Commission's earlier assumption was correct because, "[a]s in 2020, 5G deployments are likely in areas where unsubsidized 4G LTE networks have already been deployed . . . [and] [t]he market forces that brought unsubsidized 4G LTE to an area are likely to result in a provider's decision to upgrade their service to 5G." T-Mobile submits that the Commission's approach in the 5G Fund Report and Order for defining eligible areas "will help to mitigate overbuilding as providers continue to deploy 5G service to meet market demands." However, RWA disagrees, arguing that "T-Mobile provide[s] no evidence to support the [Commission's] assumption [in the 5G Fund Report and Order ] that 5G deployments are likely in areas where unsubsidized 4G LTE networks have already been deployed . . . [and is] only able to point to `market forces' that it argues will drive 5G deployment in areas where there is unsubsidized 4G LTE deployment and a general concern [regarding] overbuilding." RWA notes that, to the contrary, BDC filing data show that "unsubsidized carriers have not [in fact] rushed to deploy 5G mobile service in rural America [during] the . . . three years since the 5G Fund [Report and] Order was adopted."? 1 RWA contends that "the record clearly shows that rural areas served only by 4G LTE should be funded by the 5G Fund due to the high risk of being left behind in 5G rural deployments."

Footnotes:

1 Id. at 2-3 (citing CRWC Comments at 9-14).

20. The Commission agrees with commenters that defining eligible areas based on a lack of unsubsidized 5G mobile service is more consistent with the 5G-centered approach envisioned for the 5G Fund. While the Commission is mindful of the need to avoid overbuilding, it concludes that retaining the eligible areas definition adopted in the 5G Fund Report and Order could exclude some areas where unsubsidized 4G LTE service is being provided that will not be upgraded to 5G service without 5G Fund support. Moreover, the Commission finds the risk of overbuilding such areas is outweighed by the benefit of ensuring that it does not inadvertently strand areas to lesser mobile broadband technology and speeds. The Commission recognized in 2020 in the 5G Fund Report and Order that at least two providers-T-Mobile and DISH-would be deploying 5G mobile broadband service in rural areas in the then-near term pursuant to their enforceable merger commitments. For this reason, the Commission decided in the 5G Fund Report and Order that it would first afford T-Mobile, and potentially others, an opportunity to make pre-auction, binding commitments to deploy 5G service in certain areas to allow the Commission to remove such areas from the inventory of areas eligible for the auction, and thereby avoid overbuilding in rural areas where it is known that a provider plans to deploy unsubsidized 5G mobile broadband service.

21. The Commission declines to adopt the approach proposed by AT&T that would stagger the implementation of the 5G Fund by first awarding support to "areas that do not have 4G LTE or 5G service [in order to] allow more time for private investment to upgrade 4G LTE coverage areas to 5G service without support from the 5G Fund." AT&T's proposal essentially asks the Commission to retain the definition of eligible areas that it adopted in 2020 for an indeterminate period of time while the Commission continues to evaluate if the market will bring advanced, 5G mobile broadband service to those areas absent subsidies. T-Mobile similarly suggests in support of retaining that definition that the Commission wait to "hold[?] the 5G Fund Phase I Auction [until] pending wireless industry developments have been resolved" in order to "maximize the impact of the 5G Fund and minimize inefficient overbuilding." In support of waiting to move forward toward the 5G Fund Phase I auction until unsubsidized 5G mobile broadband service deployments play out, T-Mobile notes the Commission's decision to wait to decide "'how and/or whether future planned processes, such as [Phase II of the Rural Digital Opportunity Fund], remain necessary after the Commission's creation of the Fabric and deployment commitments under BEAD and/or other Infrastructure Act programs are made.'" However, unlike the timing for the creation of the Broadband Serviceable Location Fabric (Fabric) created for the BDC and the deployment commitments under BEAD and/or other Infrastructure Act programs, which have more structured parameters and are largely within the control of the government, decisions about where unsubsidized 5G mobile broadband service will be deployed and on what timeline rest solely with the carriers deploying such service. Moreover, one of the underlying policy principles of the 5G Fund is to direct high-cost universal service support to areas of the country where, absent subsidies, they are unlikely to experience advanced, 5G mobile broadband service. The Commission therefore finds both AT&T's and T-Mobile's approaches are wholly inconsistent with its decision herein to target 5G Fund support to the greatest number of rural areas as possible where people live, work, and travel within the available budget. Although the Commission is not persuaded that it should delay the 5G Fund Phase I auction until after BEAD support has been awarded, as more fully explained in the 5G Fund Second Report and Order, the Commission will nonetheless assess eligible area determinations to ensure that 5G Fund support does not duplicate BEAD funding efforts.

2. Speed Thresholds for Determining Eligible Areas


[top] 22. Although virtually all commenters support basing the determination of eligible areas on where BDC mobile coverage data show a lack of unsubsidized 5G broadband service by at least one service provider, their positions about which speed thresholds to use in connection with applying this definition to determine eligible areas differ. Brian Dang (Dang), T-Mobile, and Verizon each express support for using 7/1 Mbps as the speed threshold for 5G service. Dang asserts that "setting the benchmark for 5/1 Mbps for 4G and 7/1 Mbps for 5G seems to strike a reasonable balance for considering the mobile user experience." T-Mobile notes that the Commission has expressed that "[a] speed threshold [of 7/1 Mbps] is likely to be attainable by mobile broadband service providers deploying 5G-NR service over smaller channel blocks of low-band spectrum." T-Mobile submits that defining eligible areas as those that lack 35/3 Mbps 5G coverage "would certainly result in overbuilding areas that have 5G from unsubsidized providers and would divert resources away from the areas that need it most-namely, areas that still lack any 5G or 4G LTE coverage at all." T-Mobile maintains "[t]he Commission can carry out its obligation to be `a fiscally responsible steward of page 101363 [the] limited universal service funds' and fulfill its `commitment to preventing overbuilding' by reaffirming its decision to use speed thresholds that mirror the mapping parameters adopted for the BDC." T-Mobile notes that "[t]he BDC uses 5/1 Mbps as the speed threshold for 4G LTE coverage and 7/1 Mbps as the speed threshold for 5G coverage," and contends that "those same thresholds should be used for identifying eligible areas for the 5G Fund."

23. Michael Ravnitzky recommends "us[ing] a minimum speed threshold of 25 Mbps/3 Mbps to define unsubsidized 5G service [for funding 5G service for Native American, Native Alaskan Native Hawaiian, Puerto Rican, and U.S. Virgin Island communities]" because it "is consistent with the Commission's current definition of fixed broadband service and reflects the minimum level of service quality that these communities deserve and need."

24. AST&Science, CCA, CRWC, RWA, SBI, and US Cellular each express support for using 35/3 Mbps as the speed threshold for 5G service. CRWC reiterates the request made in its pending Petition for Reconsideration that the Commission "`define as eligible any area that lacks unsubsidized 5G service meeting the performance requirements set forth for 5G Fund auction winners' . . . [ i.e., ] [a]ny area lacking mobile broadband at a median speed of [35/3 Mbps], with 90% cell edge reliability, with no more than 100 milliseconds . . . of latency." CCA, CRWC, and US Cellular acknowledge that making every area lacking 5G service at a speed threshold of 35/3 Mbps eligible for the 5G Fund Phase I auction could mean areas with median speeds that are close to 35/3 Mbps might receive support, but they each submit that this could be addressed by "giv[ing] a preference to areas that are unserved or underserved, weighting the 5G Fund auction so that these areas would be funded before any support is distributed in areas having median speeds close to 35/3 Mbps," or by "tak[ing] steps to coordinate or time [the] 5G Fund [Phase I] auction to more completely consider the impacts of a robust mobile BDC challenge process and/or the impacts of BEAD-funded projects on the mobility landscape." CRWC and US Cellular contend that using a speed threshold of 7/1 Mbps for 5G service does not go far enough to fulfill the statutory goal of "provid[ing] consumers in rural areas with access to service quality that is reasonably comparable to that which is available in urban areas," but submit that if the Commission does not adopt the eligible areas definition CRWC advocates for in its Petition for Reconsideration, "making eligible for 5G Fund support any area lacking 5G technology at a speed of 7/1 Mbps or better" represents "a significant and commendable improvement over the eligibility provisions [adopted] in the 5G Fund [Report and] Order." SBI likewise believes a speed threshold of 7/1 Mbps for 5G service does not go far enough, and supports adopting the eligible areas definition CRWC advocates in it Petition, but submits that if the Commission does not use a speed threshold of 35/3 Mbps for purposes of determining eligible areas, it should alternatively provide for a middle ground data collection by replacing the 7/1 Mbps collection in the BDC with 20/2 Mbps, so that all rural Americans receiving service at less than 20/2 Mbps can access 5G Fund support investments.

25. CCA compares the mobile speeds to fixed service speeds and argues that "[defining the speed threshold for] 5G connectivity as merely 7/1 Mbps is inconsistent with the Commission's role as a global leader in technological innovation and connectivity . . . [and] also falls short of the speed threshold expectations the Administration and the Commission have expressed in other programs-for example, [Broadband Equity Access and Deployment (BEAD)] Program connectivity requires a speed threshold of 100/20 Mbps, and Alternative-Connect America[?] Cost Model II (`A-CAM II') connectivity requires 25/3 Mbps." CCA also "disagrees with the [Commission's] assumption [in the 5G Fund FNPRM ] that download and upload speeds of at least 7/1 Mbps are the typical minimum desired mobile experience for 5G service," asserting that "[this speed threshold] myopically focuses on mobile phone 5G connectivity" even though 5G encompasses much more than that. CCA also argues that "us[ing] a 5/1 Mbps speed threshold for 4G connectivity and a 7/1 Mbps speed threshold for 5G connectivity minimizes the significant differences between 4G and 5G technology and user experience." CCA advocates using a speed threshold of 35/3 Mbps to define 5G service, contending that the 7/1 Mbps speed threshold the Commission proposes to set for 5G is "a fraction of the median nationwide speed" of over 83/8 Mbps and the speeds exceeding 4 Gbps that are enjoyed by Americans living in urban areas.

26. The Commission notes that for mobile services, it standardized the speed parameters that providers use in generating their BDC coverage areas, and for 5G mobile broadband service, those speed parameters are standardized at 7/1 Mbps and 35/5 Mbps. See BDC Second Report and Order, 85 FR 50886 (Aug. 18, 2020). The BDC therefore collects 5G coverage data based only on speed thresholds of 7/1 Mbps and 35/3 Mbps. As a result, the Commission does not have data on 5G mobile broadband coverage at speed thresholds of 25/3 Mbps, 83/8 Mbps, 100/20 Mbps-which are all associated with performance requirements through which fixed service is funded ( e.g., the BEAD Program, A-CAM II)-or any other speed threshold combinations, and therefore can use only the speed threshold of 7/1 Mbps or 35/3 Mbps for which mobile coverage data is available in the BDC for purposes of determining eligible areas.


[top] 27. The Commission concludes that using a speed threshold of 7/1 Mbps for 5G for purposes of determining eligible areas will promote the expansion of 5G mobile broadband coverage at a speed threshold of at least 35/3 Mbps while avoiding the potential for overbuilding in areas where a provider already offers some level of unsubsidized 5G service ( i.e., at 7/1 Mbps) and could upgrade to higher speeds in the future. Conversely, using a speed threshold of 35/3 Mbps to determine eligible areas would result in many more areas being eligible for support, which would unnecessarily tax the 5G Fund Phase I budget. Further, using a speed threshold of 35/3 Mbps would result in overbuilding in areas where providers will upgrade their 7/1 Mbps service to 35/3 Mbps service absent a subsidy. Moreover, the Commission expects that a speed threshold of 7/1 Mbps reflects the minimum desired typical mobile user experience across broad 5G coverage areas. The Commission continues to believe that it should not use the same 35/3 Mbps speed threshold for purposes of determining areas eligible for 5G Fund support that support recipients are required to achieve in meeting their 5G Fund performance requirements. The Commission notes that CCA's assertion that the Commission is "[defining] 5G connectivity as merely 7/1 Mbps" is incorrect and conflates its decision to use 7/1 Mbps as the speed threshold for purposes of determining eligible areas with the minimum speed threshold of 35/3 Mbps that a support recipient must achieve in order to meet its 5G Fund performance requirements. This performance requirement will ensure that areas currently lacking unsubsidized 7/1 Mbps will not be left behind in experiencing the higher speeds that areas with 7/1 Mbps service page 101364 are likely to experience as the result of provider network upgrades. For these reasons, the Commission also denies the Petitions for Reconsideration filed by CRWC, NTCA, and RWA to the extent they request that the Commission define areas eligible for the 5G Fund Phase I auctions as those that lack unsubsidized 5G mobile broadband service at speeds of at least 35/3 Mbps.

28. The Commission disagrees with commenters' assertion that, if a 35/3 Mbps threshold is used to determine an area's eligibility for 5G Fund support, issues with support funds being diverted from unserved or underserved areas to fund areas with service "close to 35/3 Mbps" can be addressed by distributing support first to areas with service speeds not "close to 35/3 Mbps." Such a process would be inconsistent with the mechanism the Commission adopted to assign support under the 5G Fund, namely a reverse auction that considers in a single auction all eligible areas and that aims to assign the full budget to those eligible areas. A second reverse auction for the "close to 35/3 Mbps" areas would be required, with a corresponding rulemaking and pre-auction process to determine the areas that would be held back from the initial auction, the portion of the budget that would be withheld for later assignment, the timing of the later assignment mechanism, and any of a number of additional details that would need to be resolved for such a process to be carried out. Therefore, for this reason and for the reasons the Commission adopts the 7/1 threshold more generally, the Commission declines to accept the commenters' proposal and, as explained herein, the Commission excludes from eligibility areas that already have some level of 5G service (at speeds faster than 7/1 Mbps). Instead, the Commission targets its limited universal service support funds to areas that do not already enjoy a provision of service that far exceeds areas that have service offerings no better than 4G LTE.

29. As noted herein, the Commission will use a speed threshold of 5/1 Mbps with respect to 4G LTE service in connection with identifying any areas within the universe of areas eligible for the 5G Fund Phase I auction that lack unsubsidized 4G LTE, for purposes of incentivizing the deployment of 5G service in areas that lack unsubsidized 4G LTE service. The Commission notes that the BDC collects 4G LTE coverage areas based on speed thresholds of 5/1 Mbps in accordance with the Broadband DATA Act, and concludes that using this speed threshold for this purpose is appropriate.

3. Environment for Determining Eligible Areas

30. The record is split on whether the Commission should use outdoor stationary or in-vehicle BDC coverage maps to determine eligible areas. AT&T, CTIA, T-Mobile, and Verizon each express support for using outdoor stationary BDC coverage maps to identify areas that are eligible for 5G Fund support. AT&T argues that the lack of standardized parameters for in-vehicle coverage maps "compromises the value of such maps and would only further complicate the distribution of 5G Fund support" and that "utilizing in-vehicle coverage maps instead of outdoor stationary maps will increase the eligible areas and allow support in areas that already have some amount of 5G coverage." CTIA asserts that "[w]hile the idea of using in-vehicle mobile coverage maps might have some facial appeal, [it] remains concerned that such maps fail to account for significant variables . . . [such as] the location of the device within the vehicle, the type of vehicle, whether the windows are up or down, and the vehicle speed." T-Mobile also notes that, because "[t]he Commission did not standardize any of the key parameters that affect the results of in-vehicle coverage, such as vehicle speed, the position of the phone inside the car, and the type of car, . . . in-vehicle data [will be] much more variable and therefore [provide a] less reliable basis for determining the actual coverage of an area." "Given the potential for inconsistency among in-vehicle mobile coverage maps, CTIA urges the Commission to use coverage maps produced to show outdoor stationary coverage . . . [in order to] use a more stable and reliable coverage dataset as the basis for the 5G Fund . . . [and] target 5G Fund subsidies to the areas most in need of support as the outdoor stationary maps provide a more targeted list of eligible areas."

31. T-Mobile submits that "outdoor stationary data is a far more reliable and realistic basis for determining where wireless coverage is available than in-vehicle coverage data for several reasons." T-Mobile argues that "[g]iven the number of variables, providers will inevitably use different parameters to model their in-vehicle coverage, making it practically impossible to make meaningful [apples-to-apples] comparisons between mobile providers' in-vehicle coverage maps." T-Mobile notes that "[t]he variability of in-vehicle mobile speed testing also introduces unnecessary complications in the challenge process . . . [because], for purposes of the BDC, speed tests taken on bicycles, motorcycles, snowmobiles, and all-terrain vehicles are all considered tests from in-vehicle mobile environments, as are tests conducted in soft-top convertibles, hard-top sedans, SUVs, pickup trucks, and any type of recreational vehicle, [which] entails a wide range of `in-vehicle testing scenarios.'?" Verizon supports "using the outdoor stationary 7/1 Mbps 5G coverage map . . . [to] ensure that the entire budget is used to expand high-speed 5G coverage in areas that have little or no 5G coverage at the time of the auction, i.e., [those] that do not even meet the 7/1 Mbps outdoor stationary standard." Verizon opposes "identifying eligible areas using the in-vehicle maps [because it] would allow part or all of the budget to be used to upgrade existing networks in those areas that meet the outdoor stationary 7/1 Mbps standard but fall short of the in-vehicle standard."


[top] 32. CCA, RWA, and US Cellular express support for using in-vehicle BDC coverage maps to identify areas that are eligible for 5G Fund support. CCA argues that coverage maps based on in-vehicle mobile environments "better reflects the purposes of the 5G Fund-achieving ubiquitous connectivity-by accounting for the mobile nature of 5G usage. RWA similarly asserts that "[g]iven the inherent mobility aspect of in-vehicle data, [using] such data will best represent where 5G Fund support is needed to provide 5G mobility coverage. RWA submits that "[w]hile there may be multiple variables related to in-vehicle mobile data collection, such data provides a more accurate picture of actual mobile coverage that consumers will experience in the relevant areas." RWA maintains that if the Commission's goal is "expand[ing] 5G to rural areas where consumers live, work, and travel, ensuring that such consumers have 5G connectivity on rural roads is critical to that goal" and that "[o]utdoor stationary mobile data does not depict actual mobile coverage and [thus] should not be used as a methodology for determining eligible areas for consumers traveling through rural areas on rural roads." RWA further notes that "using in-vehicle mobile data would ease the costs of the challenge process as drive testing is a much more cost-efficient and effective way to measure mobile coverage as opposed to conducting measurements in off-road areas, which are expensive and difficult to access in rural and remote areas." US Cellular likewise contends that "[a]n in-vehicle measurement standard aligns more closely with how mobile handsets page 101365 interact with cell towers and will result in improved service quality for voice calls and data sessions conducted in a mobile environment."

33. The Commission is concerned that the use of in-vehicle mobile coverage maps could result in significant overbuilding, as claimed by commenters that oppose using such coverage maps. The Commission concludes that relying on outdoor stationary coverage data will avoid potentially overbuilding in areas where a provider already offers some level of unsubsidized 5G service and could upgrade to better service in the future. The Commission notes that outdoor stationary coverage estimates as reflected on the its National Broadband Map are generally larger than those generated for in-vehicle mobile coverage, and therefore relying on them will reduce the likelihood of overbuilding. Looking at data from June 30, 2023, as updated on February 7, 2024, about 34% of the U.S. is covered by 5G service at 7/1 according to in-vehicle mobile coverage data, whereas the analogous outdoor stationary data show that about 46% of the U.S. is covered. Additionally, unlike in-vehicle mobile coverage data, outdoor stationary coverage data are unperturbed by the lack of standard assumptions about characteristics such as vehicle type and speed. In balancing the Commission's obligation to exercise fiscal responsibility to avoid excessive subsidization and the goal of deploying 5G services to where people live, work, and travel, the Commission finds the best approach is to use outdoor stationary BDC coverage maps in determining eligible areas.

4. Limiting Eligibility to Areas With Locations or Roads

34. Because the Commission intends to direct 5G Fund Phase I support to areas where people live, work, and travel, it will limit the areas eligible for the 5G Fund Phase I auction to areas that contain at least one location or at least some portion of a road. The Commission will determine the areas that contain locations using the BDC Fabric. The Fabric is a dataset of every location (building or structure) in the United States and its Territories identified as a single point or record defined by a set of geographic coordinates that fall within the footprint of a structure, with each point assigned a unique Commission-issued Location ID. Within the location records included in the Fabric are a subset of business, residential, or mixed-use locations at which mass-market fixed broadband internet access service are or could be installed, referred to as Broadband Serviceable Locations (BSLs). The Commission will use all locations included in the Fabric dataset, not just those that are identified as BSLs. This broader set of locations includes structures-such as community anchor institutions and large enterprises-that subscribe to, or would be expected to subscribe to, non-mass market broadband service. Including these locations, as well as BSLs, ensures that the Commission will capture more of the areas where people live, work, and travel.

35. The Commission will determine the areas that contain roads using road data from OpenStreetMap. OpenStreetMap is a free, editable map of the world that is updated and maintained by a community of volunteers via open collaboration. OpenStreetMap is published and freely licensed under an Open Database License, which allows anyone to access, use, and share the data. Contributors collect data from surveys, trace from permitted aerial photography and satellite imagery, and import other geographical data in the public domain (such as U.S. TIGER) and from freely licensed geodata sources. These contributions are immediately ingested by OpenStreetMap, resulting in a map made by local experts with data that can be as current as the time of access/download. The Commission will define "roads" for purposes of determining areas eligible for the 5G Fund Phase I auction as those that include the following categories of roads: primary roads; secondary roads; local neighborhood roads, rural roads, and city streets; vehicular trails; ramps; private roads; parking lot roads; and winter trails. These categories of roads are encompassed in the OpenStreetMap "highways" category, which includes motorways, trunks, primary roads, secondary roads, tertiary roads, residential roads, service roads, and tracks, and the associated links. Defining roads in this manner is consistent with how the Commission has defined roads for purpose of other mobile universal service auctions. Further, because this definition includes many different types of roads, it helps ensure that areas where people live, work, and travel will be eligible for 5G Fund Phase I support.

36. Given that the Commission is limiting the areas eligible for support in the 5G Fund Phase I auction to those that contain locations or roads, it does not believe it is necessary to also exclude water-only areas from eligibility. Further, excluding water-only areas from eligibility as part of the process of generating eligible areas could exclude portions of roads, such as bridges and causeways, that are located in water-only areas but which the Commission believes should be eligible for support.

37. Urban areas, as defined by the U.S. Census Bureau, will not be eligible for support in the 5G Fund Phase I auction, because the Commission concludes that making these areas eligible for support would be inconsistent with the objective of the 5G Fund program to fund the deployment of 5G service in rural areas. The limited comment the Commission received on this issue supports excluding urban areas from eligibility for support in support in the 5G Fund Phase I auction.

38. Commenters generally support the Commission's approach to limiting eligible areas to those areas that contain locations or roads in furtherance of its goal of directing 5G Fund Phase I support to areas where people live, work, and travel. AT&T "supports limiting eligible areas to those resolution 9 hexagons [(hex-9s)] that contain locations and/or certain roads," noting that if eligible areas were defined as "those areas where both locations and roads exist, it would overly limit the areas eligible for 5G Fund support, contrary to the Commission's goal of reaching all areas where people live, work, and travel." CCA "agrees with AT&T that defining eligible areas as those where `locations and roads exist" would be overly limiting and contrary to the Commission's goal of reaching all areas where people live, work, and travel, and advocates for "a definition of eligibility that includes both unserved roads and unserved locations" because it would "appropriately reflect the mobile nature of 5G service." Michael Ravnitzky submits that limiting eligible areas to those that contain BSLs and/or roads will help "direct 5G Fund support [in Native American, Native Alaskan Native Hawaiian, Puerto Rican, and U.S. Virgin Island communities] to areas where people live, work, and travel and avoid wasting resources on areas that are uninhabited or inaccessible."


[top] 39. In its initial comments, RWA advocates "limit[ing] eligible areas to roadways, rather than locations," and expresses concern that relying solely on locations would "disregard[?] the inherent mobility of 5G mobile services and could potentially be duplicating efforts made by the BEAD Program and other federal broadband programs which provide funding for both fiber and wireless projects, which focus on locations." RWA maintains in its reply comments that the Commission should limit eligible areas to roadways if the 5G Fund budget is limited to $9 billion, but page 101366 submits that "if additional funding is available, locations should also be included." While acknowledging that serving both roads and locations is important, RWA expresses concern that "[if] locations [are included] in eligible areas, the funding may not go as far and the [Commission] could duplicate efforts of the [BEAD] Program and other federal broadband funding programs that [fund] . . . projects to serve locations."

40. Other commenters ask the Commission to expand the eligibility criteria to specifically include agricultural lands. Verizon supports expanding the eligibility criteria to include "rural hex-9s with roads, BSLs, or agricultural lands," and urges the Commission to "focus[?] support on unserved areas that would have the most significant demand for mobile broadband service and require relatively smaller subsidies, rather than on areas that would have little demand for mobile broadband service and require larger subsidies." Verizon submits that "including agricultural lands in the definition of eligible areas . . . will ensure that more of the nation's farmland gains the benefits of precision agriculture," which it notes is one of the goals articulated in the 5G Fund Report and Order. WIA similarly advocates for including agricultural areas within the geographic areas determined to be eligible for 5G Fund support, and asks the Commission to specifically include such areas as eligible for 5G Fund support. WIA acknowledges the importance of mobile service on roadways, but submits that there are areas that extend well beyond the reach of roads that need mobile connectivity as well ( e.g., agricultural communities cultivating land). WIA argues that support areas must include those that are crucial to economic activity, tourism, and public safety in which competitive solutions do not exist, noting that farmers now use a host of precision technologies to manage their operations that cannot be used without mobile connectivity. John Deere Corporation (Deere) agrees with WIA, and urges the Commission to both include agricultural areas and farmlands within the areas that are eligible to receive 5G Fund support and make them the focus of the $1 billion in 5G Fund support that was set aside for precision agriculture in the 5G Fund Report and Order.

41. The Commission declines either to narrow or expand the eligibility-limiting criteria used to determine areas eligible for the 5G Fund Phase I auction in response to these comments. Although BEAD and other programs fund the deployment of fixed broadband services to fixed locations, these locations also indicate where people use mobile devices and where they live, work, and travel. Thus, the Commission disagrees with RWA that it should limit the eligibility criteria for determining eligible areas to those areas with roads only. With respect to expanding the eligibility criteria to specifically include agricultural areas, as requested by Verizon, WIA, and Deere, the Commission notes that the Commission explained in the 5G Fund Report and Order that "Phase II [of the 5G Fund] . . . will focus support to specifically target the deployment of technologically innovative 5G networks that facilitate precision agriculture." Specifically, including agricultural areas would therefore be outside the scope of the 5G Fund Phase I auction. The Commission further notes that any agricultural areas located within an area determined to be eligible for the 5G Fund Phase I auction will indeed be eligible for support in that auction; the criteria the Commission adopts today for determining the eligible areas will not categorically remove agricultural lands. Additionally, the Commission believes the broad definition of "roads" it will use for purposes of determining the areas eligible for support in the 5G Fund Phase I auction may result in coverage reaching agricultural areas and farmlands because providers, when engineering their networks to cover the roads, are likely to cover such areas if they are in close proximity. Accordingly, the Commission does not take any additional steps here to ensure that support under Phase I of the 5G Fund reaches agricultural lands specifically.

42. Several commenters address both the categories of roads and the data source(s) that the Commission should use for purposes of determining the eligible areas that contain roads. RWA and CCA advocate using the following roadways, as defined by the U.S. Census Bureau: primary roads; secondary roads; local neighborhood roads, rural roads, and city streets; vehicular trails; ramps; private roads; parking lot roads; and winter trails. CCA asks the Commission to consider including other types of unserved roadways in determining an area eligible for support, "even if they are not captured in U.S. Census Bureau [road] data or are located close to a served roadway." CCA submits that "the Commission cannot and should not assume a local road, alleyway, or agricultural road in a rural area receives or will receive unsubsidized 5G service simply because a highway in that same area receives 5G service," and urges the Commission to "consider data at a granular level to avoid leaving behind unserved roadways in areas where another roadway in that area is receiving 5G service." CCA also expresses support for looking beyond roadways and including other unserved areas-such as waterways, agricultural lands, farmland and other cultivable land, parks, and trails-for purposes of determining an area's eligibility for support. NYPSC asks the Commission to consider including waterways and other frequented areas, such as state parks, as well as remote areas, in making eligible area determinations, noting that "wired services may be unreliable or unavailable [in these rural and remote areas]." SBI advocates making all active roads used on remote Tribal lands eligible for support if the Commission decides to limit eligible areas to those that contain locations or roads because "[t]housands of Tribal locations in SBI's service area are beyond the reach of the U.S. Postal Service as they receive no home delivery and they have no Postal Service address." SBI notes that "[t]hese remote locations often are connected to primary roads by very small unpaved dirt roads through the high desert," many of which SBI states "are considered to be service and private roads[?] categorized as S.1740" under the U.S. Census Bureau's feature class codes. SBI submits that "[t]hese roads, which likely fall into the 1.6, 1.7, or 1.8 category in the OpenStreetMap hierarchy, must be included as eligible areas" if the Commission chooses to use OpenStreetMap. SBI notes that that "there are substantial road areas in between homes and major roads that could be excluded if the Commission limits eligibility to only [hex-9s] with developed roads or locations." SBI states that unlike much of the rest of the nation, this undeveloped network of roads comprise a substantial area within which Tribal residents will travel, and notes that the health and safety benefits of access to mobile services (especially 911 service) compel the Commission to ensure that all of these minor roads are considered when making eligible area determinations.


[top] 43. CCA, Deere, RWA, and WIA each support using U.S. Census Bureau TIGER data when making road-based eligible area determinations. WIA and Deere note that agricultural communities may fall outside of the maps for roads, and therefore caution against using a single data source, such as OpenStreetMap, to determine eligible areas that contain roads. WIA and Deere therefore urge the Commission to page 101367 instead rely on multiple sources, including the TIGER road miles database, the U.S. Department of Agriculture's cultivated land layer, and other sources, to provide redundancy and help ensure that all agricultural communities are included within the areas eligible to receive 5G Fund support.

44. The Commission concludes that the definition of roads, and the source of road data, it adopts here is broadly consistent with the categories of roads commenters ask us to consider when identifying the eligible areas that contain roads. In addition, including areas with Fabric locations will ensure that the roads leading to those locations generally will receive 5G coverage even if such roads do not fall within the categories of roads the Commission adopts today. While the Commission appreciates commenters' interest in using more than one road data source for redundancy and completeness, the Commission believes that using multiple road data sources would be unwieldly and could cause confusion, and thus decline to do so. The Commission concludes that using OpenStreetMap as the single road data source is beneficial because it includes all the road categories in the definition the Commission adopts, it is updated more frequently than TIGER data, and it reflects input from the public.

5. Generating Areas Eligible for 5G Fund Support at the Hex-9 Level

45. In the 5G Fund FNPRM, the Commission noted that in order to limit the areas eligible for support in the 5G Fund Phase I auction to those that contain locations or roads, the Commission would need to designate the geographic areas that contain locations and/or roads. The Commission sought comment in the 5G Fund FNPRM on its approach to identifying specific geographic areas eligible for 5G Fund support, and the idea of expressing those eligible areas as hex-9s. The Commission explained in the 5G Fund FNPRM that under this approach, "areas eligible for 5G Fund support [would be converted] to, and [made] available in the form of, [hex-9s]," noting that "unlike `raw' coverage footprints based on propagation model output, which do not conform to any defined boundary, hex-9s are standardized and can be clearly identified and referenced." The Commission noted that "because hex-9s are relatively small, with an average area of approximately 0.1 square kilometer, any reduction in map resolution when converting from raw propagation model output (as filed by providers) to hex-9s is minimal," and that "the use of hex-9s can strike the appropriate balance between the benefits of their use and this loss in granularity, particularly given that the data as filed are based on models of coverage."

46. The H3 hexagonal geospatial indexing system (H3 system) is an open-source GIS dataset developed by Uber Technologies, Inc., that overlays the globe with hexagonal cells of different sizes at various resolutions, from zero to 15. The smallest hexagonal cells are at resolution 15, in which the average hexagonal cell has an area of approximately 0.9 square meters, and the largest are at resolution 0, in which the average hexagonal cell has an area of approximately 4.25 million square kilometers. The H3 system is designed with a nested structure wherein a lower resolution cell (the "parent" hexagon) contains approximately seven hexagonal cells at the next higher resolution (its "children" where each "child" is a smaller, nested hexagon), which fit approximately within the "parent" hexagon. The H3 system supports sixteen resolutions. Each finer resolution has cells with one seventh the area of the coarser resolution. Hexagons cannot be perfectly subdivided into seven hexagons, so the finer cells- i.e., the "children"-are approximately contained within a parent cell. The identifiers for these "child" cells can be easily truncated to find their ancestor cell at a coarser resolution, enabling efficient indexing.

47. In the 5G Fund Second Report and Order and Order on Reconsideration, the Commission adopts its proposal to express the specific geographic areas eligible for 5G Fund as hex-9s, with certain modifications, because it is persuaded that a more granular analysis of coverage is needed to address concerns raised by commenters. The Commission will therefore analyze mobile broadband coverage by first translating "raw" mobile coverage polygons to resolution 11 hexagons (hex-11s) and then evaluating the coverage of the hex-11s that compose a hex-9, using the process described herein, and directs OEA, WCB, and the Wireless Telecommunications Bureau (WTB) to make additional details regarding the methodology used to generate eligible areas available with the publication of the list of eligible areas.

48. A hex-9 will be eligible for 5G Fund support if it includes roads or locations and if a certain share of its component hex-11s lack unsubsidized 5G coverage and are in non-urban areas. Here, 5G coverage is based on the "raw" polygon coverage areas submitted by providers in their biannual BDC submission for 5G outdoor-stationary service at 7/1 Mbps. The Commission will determine whether coverage is subsidized or unsubsidized using information from USAC on legacy support and CETC study area boundaries. Hex-11s are two levels more granular than hex-9s in the H3 system hierarchy and are therefore the "grandchildren" hexagons of hex-9s. Hex-11s have an average area of 2,150 square meters (about half an acre), which is smaller than the maximum area of the bin sizes used by providers when generating raw coverage areas submitted in the BDC. The maximum resolution allowed when generating mobile broadband coverage areas under the BDC requirements is 100 meters. See 47 CFR 1.7004(c)(3)(iii). This resolution would result in a bin or pixel, the individual square generated by a propagation model to represent predicted coverage, with an area of 10,000 square meters.


[top] 49. To understand how the Commission will determine which hex-9s are eligible for support, it may be helpful to examine the inverse, i.e., how a hex-9 is defined as served. For each hex-9, the Commission will determine the number of served grandchild hex-11s relative to the total number of grandchild hex-11s. For both the numerator and the denominator, the centroid- i.e., the geographic center point-of the hex-11 must fall within the boundary of United States or its territories to be counted. To find the number of served hex-11s, the Commission will overlay hex-11 areas on a provider's unsubsidized 5G coverage polygon and urban areas. If any of those boundaries overlap the centroid, the geographic center point, of the hex-11, then the Commission will treat the entire hex-11 as being covered by that boundary. Any hex-11 covered by unsubsidized 5G coverage or in an urban area will be considered served and counted in the number of served hex-11s. The total number of grandchild hex-11s of a hex-9 is typically 7x7, or 49. However, it would not be 49 when a hex-9 straddles an international boundary or coastline, for instance, and some its component hex-11s fall outside the United States or in coastal waters. If a substantial majority of the grandchild hex-11s are served, then the grandparent hex-9 will be considered served. For hex-9s with both land and water grandchild hex-11s, only the land hex-11s are considered in this calculation. For purposes of making this determination, the Commission considers a "substantial majority" to be 70% or more. Any hex-9 that is not page 101368 served in this way is therefore considered unserved and will be eligible for 5G support, as long as it also contains at least one location or at least some portion of a road.

50. The Commission notes that although it has not formally defined what constitutes a "substantial majority," it has concluded that it is more than a simple majority. In the context of the Lifeline program, the Commission decided in its Lifeline Third Report and Order, 81 FR 33026 (May 24, 2016), to "establish minimum service standards for all Lifeline supported services based on services to which a `substantial majority' of consumers have already subscribed" and "conclude[d] that 70 percent of consumers constitutes a `substantial majority' as it relates to fixed broadband speeds." The Commission also concluded in its Lifeline Third Report and Order in the context of Lifeline program mobile services that "after the phase-in of mobile data usage allowance standards, [it would] update mobile broadband standards for data usage allowance in line with the principle of supporting services that a "substantial majority" of American consumers subscribe to," and that "given the types of data that are [publicly] and regularly available, the minimum service standard for mobile broadband data usage allowance will be 70 percent of the calculated average mobile data usage per household."

51. CCA supports converting the areas eligible for 5G Fund support into hex-9 standardized units and excluding from 5G Fund eligibility any hex-9 unit that overlaps with a relevant mobile coverage area, such that the entire hex-9 area is considered covered or served. Verizon also supports converting the areas eligible for 5G Fund support into hex-9s and notes that the Commission's BDC challenge and verification processes also use hex-9s. Verizon also advocates making bidding units with only a handful of eligible hex-9s ineligible for support, consistent with the Commission's decision in the 5G Fund Report and Order to exclude geographic areas with de minimis eligible areas. ARA PAWR submits that using the H3 system can be an efficient way to identify specific geographic areas but notes that one challenge with that approach is the need to have multiple resolution implementations based on the geographical location. AT&T expresses support for limiting the areas eligible for 5G Fund support to hex-9s in rural areas that are not 100% served.

52. While not opposing converting eligible areas to hex-9s, T-Mobile notes that there are some issues with doing so. T-Mobile submits that "translating providers' submitted BDC coverage data into hex-9 cell maps does not result in a perfect match." T-Mobile notes that "[t]he BDC rules require mobile wireless providers to report coverage using 100 meter by 100 meter square pixels, but [because] hex-9 cells are larger than these pixels[,] . . . providers' coverage data is more granular than the hex-9 cells used in the Commission's maps," and as a result, "translating providers' coverage data into hex-9 maps inevitably introduces some degree of inaccuracy and imprecision." In an ex parte presentation, T-Mobile submits that "[u]sing more granular hexagonal areas for the 5G Fund, such as hex-10 or hex-11 cells, may help mitigate [the hex-9 translation issue]." The Commission agrees. Overlaying hex-11 cells onto the raw coverage data submitted by mobile service providers and generating eligible hex-9s based on the percentage of unserved hex-11s will allow for a more granular assessment of coverage data in the geographic areas than the coverage data as rendered on the National Broadband Map. This approach also is more accurate and granular than the approach the Commission outlined in the 5G Fund FNPRM and will alleviate certain concerns raised by commenters about converting coverage to hex-9s. The Commission's approach in the 5G Fund Second Report and Order and Order on Reconsideration is also more granular than the methodology used to report and depict mobile broadband coverage on the National Broadband Map, which considers a hex-9 covered if its centroid is overlapped by a provider's raw mobile broadband coverage area. Because hex-11s are so small, there is little to no loss in granularity when converting from raw coverage areas to hex-11s, even when using the centroid method.

53. T-Mobile also argues that "smaller hexagonal cell[s] would require higher resolution terrain and clutter maps that are not readily available," "would require changes to the BDC submission processes," and "would . . . dramatically increase the size of the data files and computer processing requirements in a way that is unachievable." The Commission disagrees with these arguments because the approach it adopts would not require mobile service providers to submit coverage data into the system based upon hex-11s, thus obviating the potential computer processing requirements and other logistical hurdles to gathering the data based on hex-11s.

54. T-Mobile notes that "[i]n the 5G Fund FNPRM, the Commission propose[d] to treat an entire hex-9 cell as served-and thus ineligible for 5G Fund support-if a provider's coverage data overlaps any portion of that hex-9 cell." "[T]o ensure complete, robust rural coverage," T-Mobile argues that "hex-9 cells that are only partially covered ( e.g., cells where BDC shows only 25%, 50%, or 75% coverage) should be included in the 5G Fund Phase I Auction to avoid denying support to unserved locations." T-Mobile submits that this will "ensure[?] that locations are not excluded because they are within a hex-9 cell [with less than 100% coverage] . . . [and] is consistent with the goal[?] of the BDC . . . to produce more granular results." In its reply comments, AT&T agrees with T-Mobile that eligible areas should include hex-9s that are not 100% served. CTIA likewise supports excluding hexagons that are 100% covered and including those that are partially covered, and submits that this approach will mitigate the risk highlighted by T-Mobile of skewing support away from areas where unsubsidized service is actually unavailable.


[top] 55. The Commission will exclude from eligibility any hex-9s that are 100% covered by unsubsidized 5G service. However, the Commission disagrees with CCA that a hex-9 with any 5G coverage should be excluded from 5G Fund eligibility, because doing so would leave behind too many areas from gaining 5G coverage. The Commission will therefore also make some hex-9s that are partially covered eligible for 5G Fund support, depending on the percentage of the hex-9 that is covered. To address commenters' concerns about excluding from eligibility hex-9s with only a small percentage of their area covered by unsubsidized 5G service, the Commission will determine the eligibility of a hex-9 based on whether the percentage of its nested, non-urban "grandchild" hex-11s with unsubsidized 5G mobile coverage represents a "substantial majority" of the hex-11s in that hex-9. As noted herein, the Commission concludes that unsubsidized 5G mobile coverage of 70% or more represents a substantial majority. Under this approach, a hex-9 will be ineligible if 70% or more of its nested, non-urban "grandchild" hex-11s show unsubsidized 5G coverage. The Commission believes that its methodology strikes the appropriate balance between not leaving too many areas and locations ineligible for page 101369 support and avoiding supporting areas that are largely covered by 5G service without a subsidy.

6. Source and Timing for Determining Final List of Eligible Areas

56. As the basis for determining the final list of areas eligible for support in the 5G Fund Phase I auction, the Commission will use the most recent vintage of BDC mobile availability data published on the National Broadband Map that the public have had the opportunity to challenge. The methodologies, processes, and timelines applicable to mobile challenges submitted under the BDC rules will apply. For example, a speed test conducted using a 5G-capable device in an area where a provider claims 4G LTE and 5G-NR service but the results show less than 5/1 Mbps would count as a negative test for both the 4G LTE and 5G-NR coverage. Alternatively, such a test would count as a positive test for 5G-NR if the test result is higher than 7/1 Mbps, even if the test is taken over a 4G LTE connection. The Commission directs OEA, WCB, and WTB to implement this approach and to release the final list of eligible areas for that auction at least 30 days prior to the start of bidding in the auction. The Commission intends to publish a "preview" map of the eligible areas based on the vintage (the "as-of date") of the BDC mobile availability data that the Commission plans to use as the basis for the final eligible areas. The Commission also anticipates publishing an updated preview of the eligible areas before the short-form application filing window for the auction opens. This updated preview would be based on the same vintage of BDC mobile availability data and reflect any mobile challenges to that vintage resolved at the time of release. The Commission concludes that providing both an initial and an updated preview of the eligible areas during the pre-auction process will afford potential auction applicants sufficient time to determine whether additional challenges to the data are needed, and to submit those challenges so that they can be processed and adjudicated sufficiently in advance of when the Commission expects to generate the final list of eligible areas. It will also enable them to make a more informed decision applying for, and bidding in, the auction.

57. The Commission recognizes that, depending on the timing for the 5G Fund Phase I auction, this approach means that it would not use the most recent vintage of published BDC mobile availability data as the basis for the eligible areas. If the Commission were to commit to using the most recent vintage of published BDC mobile availability data, there might be little or no time for the public to submit, and for the Commission to resolve, challenges to such coverage data; as a result, some areas that should be eligible for the auction might be excluded. The Commission therefore concludes that, on balance, using a prior vintage of BDC mobile availability data to determine the final list of eligible areas is preferable because it will afford greater opportunity for public review, challenge submissions, Commission adjudications, and for provider updates on the National Broadband Map to be considered.

58. Michael Ravnitzky supports the proposal to make the map of eligible areas available no later than 30 days in advance of bidding, submitting that "this approach will ensure that the eligible areas are based on the most recent and accurate data available." CCA expresses concern about the Commission's proposal "to use mobile availability data published no later than 30 days prior to the start of bidding as the basis for [determining] final eligible areas," arguing that "[p]articipating carriers will need to engage in considerable preparation for bidding and [that] 30 days is insufficient for small carriers with limited resources to review the data, make decisions regarding participating in the auction, and take the steps necessary to prepare for the auction." CCA asserts that "[t]he Commission should ensure that there is sufficient time between when the final [eligible areas] data is made available and the start of bidding, so that adequate preparation can occur." CCA also urges the Commission to "permit a robust mobility mapping challenge to run its course[?] to detect and resolve any significant concerns regarding the accuracy of the current coverage maps."

59. CTIA submits that "[the 5G Fund] program timelines should be aligned with the BDC timeline to enable the use of the most recent version of the [National Broadband Map] that has been verified by the challenge process." While CTIA does not specifically oppose the Commission's specific proposed timing, it asserts that "[d]epending on the timing of when the map is published, 30 days may not be sufficient to ensure that the map can be validated through the challenge process." "Since challenges are ordinarily accepted on a rolling basis, CTIA recommends that the Commission provide a target date for eligible parties to submit challenges for consideration in the map that will be used to determine eligible areas for the 5G Fund . . . [that is] sufficiently far in advance of the start of bidding to ensure that potential bidders in the auction have an adequate opportunity to evaluate the updated coverage data and its impact on their participation." While not specifically addressing the Commission's specific proposed timing, RWA asserts that the Commission should set a deadline for determining the final areas eligible for the 5G Fund Phase I auction prior to making this determination, in order to enable providers to determine the most opportune time to file challenges to the BDC maps that the Commission will rely on to determine the areas eligible for the auction, noting that "[i]f a provider files a challenge too early, such challenge may be moot by the time a later version of the BDC map is released due to continued 5G build out by nationwide carriers." RWA further notes that "[f]iling such challenges is also extremely costly for rural providers, making the timing of filing challenges even more difficult . . . [because] filing challenges to overstated coverage in perpetuity is economically infeasible for rural carriers." RWA submits that "[p]roviding a date when the final eligible areas will be determined will provide needed clarity and avoid wasteful spending by carriers filing premature challenges . . . [and ensure] that industry and the Commission are in a better position to understand the impact of the BEAD Program, [as contemplated by the Commission in the 5G Fund FNPRM ]."


[top] 60. The iterative nature of the National Broadband Map, which is published twice a year and updated on a bi-weekly basis to reflect provider updates and the results of challenges, addresses commenters concerns about the Map showing the most up-to-date coverage data. The Commission therefore strongly encourages the public to review and, to the extent appropriate, challenge these data as soon as possible so that any challenges can be resolved by Commission staff prior to its announcement of the final eligible areas. Challenges may take as long as 180 days to be reflected in corrections to the National Broadband Map. As outlined in the Commission's rules, speed tests submitted as part of the BDC mobile challenge process are valid for up to one year and are combined with other tests conducted in nearby geographic areas to create a cognizable challenge to the mobile data once the geographic, testing, and temporal thresholds outlined in the BDC mobile challenge process have been met. If a challenge is upheld, the challenged area will be page 101370 removed from the National Broadband Map, and the results of upheld challenges will continue to be reflected in future versions of the National Broadband Map, including future data vintages. The challenge outcome will remain until a mobile challenge restoration process has been implemented and a provider has successfully followed that process to demonstrate that coverage in the challenged area is available in a subsequent vintage after the loss or concession of a challenge. Once an area is successfully challenged and the challenge is upheld, the provider will not simply be able to add the area back to their availability filing in the next biannual filing period. Instead, to show that a provider can serve a previously challenged area in a future BDC filing, it will need to separately submit the same type of detailed infrastructure data for the successfully challenged area that the Commission can require in an audit or verification ( i.e., the type of data that would be sufficient to invalidate challenge speed tests through the challenge process).

B. Puerto Rico and the U.S. Virgin Islands

61. Consistent with the underlying policy objectives of the Commission's decisions in the Bringing Puerto Rico Together Fund and the Connect USVI Fund, the Commission concludes that areas in Puerto Rico and the U.S. Virgin Islands that meet the eligible areas definition for the 5G Fund will be included in the 5G Fund Phase I auction. The Commission considers this conclusion to be a natural progression from the Commission's decision to provide support to mobile carriers in Puerto Rico and the U.S. Virgin Islands to restore and harden their networks after the devastation caused by Hurricanes Irma and Maria to the Commission's gradual transition to allow carriers in these areas to use a portion of the support they receive toward deploying high-speed 5G mobile services. As the Commission anticipated in both the PR-USVI Stage 2 Order, 84 FR 59937 (Nov. 7, 2019), and more recently in the Transitional Support Report and Order, 88 FR 28993 (May 5, 2023), the time has come to establish a competitive funding mechanism for the long-term expansion of advanced telecommunications access and next generation wireless services for Puerto Rico and the U.S. Virgin Islands, and the Commission concludes that it is now appropriate to view the funding needs for support for mobile broadband services in Puerto Rico and the U.S. Virgin Islands through the same lens as other areas eligible for support under the 5G Fund. Accordingly, eligible areas in Puerto Rico and the U.S. Virgin Islands will be included in the 5G Fund Phase I auction, and winning bidders that are authorized to receive 5G Fund Phase I support in those areas will be subject to the same terms and conditions as winning bidders authorized to receive support in other eligible areas.

62. Over the past six years, the Commission has dedicated significant effort and financial support to accomplish the restoration of mobile communication networks in Puerto Rico and the U.S. Virgin Islands. In recognition of the advancements that have been made to achieve this goal, in its 2019 PR-USVI Stage 2 Order, the Commission began the process of transitioning from offering restorative support to a plan that would begin to offer support to mobile carriers to deploy high-speed 5G mobile services in areas that that would otherwise not see such services absent subsidies. Thus, in Stage 2 of the Bringing Puerto Rico Together Fund and the Connect USVI Fund, the Commission adopted a three-year funding period and budget pursuant to which carriers could elect to receive up to 75% of the support for which they are eligible to restore, harden, and expand their networks using 4G LTE or better technology capable of providing service at speeds of at least 10/1 Mbps, and up to 25% of the support for which they are eligible to deploy 5G mobile networks capable of providing service at speeds of at least 35/3 Mbps. In so doing, the Commission stated that it expected to establish a competitive funding mechanism for the long-term expansion of advanced telecommunications access and next-generation wireless services for Puerto Rico and the U.S. Virgin Islands by the conclusion of Stage 2. However, in June 2023, when Stage 2 mobile support under the Bringing Puerto Rico Together Fund and the Connect USVI Fund was scheduled to conclude, this next stage of the implementation of the 5G Fund had not yet begun. Without another option on the immediate horizon, and not wanting to lose the momentum that had been achieved in Puerto Rico and the U.S. Virgin Islands, the Commission adopted an additional transitional support period of up to 24 months to allow eligible mobile carriers currently receiving Stage 2 mobile support to continue receiving support at levels lower than in Stage 2 that is intended to harden and improve the resiliency and redundancy of facilities for 4G LTE or better technologies during natural disasters, but may be used for both 4G LTE and 5G-NR-capable networks in order to encourage the deployment of 5G-NR service while also ensuring resilient networks until the Commission could develop a long-term funding mechanism. The Commission nonetheless stated in the Transitional Support Report and Order that transitional support would end sooner than 24 months if a long-term funding mechanism were established before the transition period ends.

63. The Commission recognizes that its decision to use the 5G Fund as the long-term competitive funding mechanism to advance high-speed, mobile broadband for eligible areas in Puerto Rico and the U.S. Virgin Islands may raise concerns for certain commenters. Although some parties support the inclusion of eligible areas in Puerto Rico and the U.S. Virgin Islands in the 5G Fund because they maintain that the award of 5G Fund support has the potential to bring new services and service providers to these areas, other commenters contend there should be a separate, specific funding mechanism for Puerto Rico and the U.S. Virgin Islands that addresses the unique challenges that service providers face there. One commenter even argues that the Commission should continue offering support to providers through the Bringing Puerto Rico Together Fund and the Connect USVI Fund, and also include eligible areas in Puerto Rico in the 5G Fund.


[top] 64. In reaching today's decision, the Commission is mindful that, had it not been for the catastrophic damage caused by Hurricanes Irma and Maria, eligible areas in Puerto Rico and the U.S. Virgin Islands would have remained in Mobility Fund Phase II, which was later replaced by the 5G Fund. Moreover, after carefully reviewing the record on this issue, the Commission has determined that there is no reasonable basis for Puerto Rico and the U.S. Virgin Islands to continue to be treated differently than other U.S. islands and territories, which also face the same factors that challenge the deployment of mobile service as those cited by commenters, including the economy, the costs of shipping materials from the mainland, and the limited availability of trained workers. While the Commission acknowledges and are not unsympathetic to these obstacles, it concludes that Puerto Rico and the U.S. Virgin Islands no longer warrant continued separate, dedicated, mobile funding mechanisms. As stewards of universal service support, the Commission has an obligation to be fiscally responsible and to ensure that page 101371 its limited resources are used efficiently. Although the Commission stated in the Transitional Support Report and Order that transitional support would end sooner than 24 months if a long-term funding mechanism were established, the Commission finds that providing carriers in Puerto Rico and the U.S. Virgin Islands that are not winning bidders in the 5G Fund Phase I auction with a two-year phase down of the transitional support being provided under the Bringing Puerto Rico Together Fund, on the same terms and conditions as those being adopted for mobile legacy high-cost support recipients, will provide the continuity of support necessary to preserve the Commission's investment in restoring and hardening networks impacted by the hurricanes in these Territories. The Commission concludes that its decision today serves the public interest and reduces the administrative burdens of continuing to manage separate funding mechanisms. Accordingly, areas in Puerto Rico and the U.S. Virgin Islands that meet the eligible areas definition for the 5G Fund will be included in the 5G Fund Phase I auction, subject to the same terms and conditions as other eligible areas, and the transition from the transitional support being provided under the Bringing Puerto Rico Together Fund and the Connect USVI Fund to 5G Fund support in Puerto Rico and the U.S. Virgin Islands, or to a two-year phase down of transitional support, will occur on the same terms and schedule adopted below. For areas in Puerto Rico and the U.S. Virgin Islands, the transitional support being provided under the Transitional Support Order is the "mobile legacy high-cost support" that will transition to 5G Fund support or be subject to phase down (whichever is applicable).

IV. 5G Fund Budget

65. The Commission increases the budget for Phase I of the 5G Fund from up to $8 billion to up to $9 billion by including the $1 billion that previously had been allocated by the Commission in the 5G Fund Report and Order for Phase II, as suggested in the record. In so doing, the Commission affirms its prior commitment to reassess the appropriate amount needed for the 5G Fund Phase II budget, including support that will be necessary for carriers to commit to the deployment of technologically innovative 5G networks that facilitate precision agriculture, following Phase I. From this 5G Fund Phase I budget of up to $9 billion, the Commission also proportionately increases the amount it reserves for service to Tribal lands from up to $680 million to up to $765 million, and here too reaffirm the Commission's commitment to revisit the amount of this reserve after the conclusion of the 5G Fund Phase I auction.

66. The Commission's budget determinations today remain grounded in its effort to balance the policy objectives of the 5G Fund with its obligation to exercise fiscal responsibility to avoid excessive subsidization, recognizing that the cost of subsidies distributed through the 5G Fund will ultimately be borne by consumers and businesses. The Commission also heeds the concerns of many commenters that caution the Commission against raising the 5G Fund budget to the detriment of the Universal Service Fund (USF) contribution factor.

67. The Commission nonetheless recognizes the apprehension expressed by commenters that, particularly due to inflationary factors, an $8 billion budget for 5G Fund Phase I auction may be insufficient to achieve its policy goals. The Commission has long acknowledged that extending deployment of 5G networks in rural areas will require significant expenditures. The Commission is mindful that the magnitude of such expenditures may only continue to increase. While many commenters favor raising the 5G Fund Phase I auction budget, most did not propose any alternative budget amount other than suggesting that the Commission should employ a cost model approach. In reaching its decision today, the Commission is persuaded, however, by the argument suggested in the record to increase the Phase I auction budget to include up to the full $1 billion previously allocated to the Phase II budget, holding open a decision on the budget that will be necessary for Phase II of the 5G Fund. The Commission recognizes that Phase II will focus support on precision agriculture, and its decision to reallocate the budget does not diminish that intention. Furthermore, precision agriculture connectivity relies upon a wide variety of broadband deployment technologies, and the landscape of broadband infrastructure in rural areas continues to evolve. The Commission concludes that repurposing the budget amount previously allocated to Phase II of the 5G Fund strikes an appropriate balance in responding to commenters that advocate an increase in the Phase I budget, while also being conscious of its fiscal obligations to be good stewards of the Universal Service Fund.

68. According to the U.S. Bureau of Labor Statistics, the price of broadcast and wireless communications equipment manufacturing increased by 6.18% from May 2020 to August 2023, and the total compensation for private industry workers in the information industry increased by 13.32% from Q2 2020 to Q3 2023. Assuming the wireless telecommunications industry uses equipment and labor in approximately equal shares, costs in the industry have gone up by approximately 10% since May 2020. The Commission finds that a 12.5% increase in the 5G Fund Phase I auction budget will help compensate for the inflationary pressures cited by commenters that might otherwise reduce the potential for the deployment of 5G service relative to when the budget was adopted in 2020. Likewise, the Commission increases the amount of the budget it reserves for service to Tribal lands proportionally by that same 12.5%. The Commission nonetheless balances its decision to increase the 5G Fund Phase I auction budget with its obligation to ensure that the budget it establishes provides sufficient, but not excessive support. The Commission concludes that by distributing up to $9 billion in the 5G Fund Phase I auction, the Commission can make a significant impact on the provision of advanced, high-speed 5G mobile broadband in areas where Americans live, work, and travel, and the Commission will continue to monitor its progress as the Commission reviews information collected through the BDC, annually.


[top] 69. The Commission emphasizes that it is aware that this budget, even as modified, will not cover the costs of serving every eligible area that will be offered in the 5G Fund Phase I auction, and the Commission states again that it is not intended to do so. Commenters that continue to argue in favor of using a cost model to determine the 5G Fund budget disregard the Commission's repeated explanation that relying on cost studies would wholly conflict with its intent to award support in eligible areas in amounts that are competitive, but still acceptable to the providers, as a reverse auction does. In other situations in which the Commission has used a cost model to provide universal service support, the cost model generally served to establish the amount of support that would be offered to eligible legacy providers, and expenditures for those programs are determined by the total of the providers' acceptances of the modelled support offers. The 5G Fund auction operates in a fundamentally different way; a budget is established in advance and the competitive bidding process, not the Commission, determines which providers will receive support and the page 101372 amount of support they will be eligible to receive. Multiple entities-not only the legacy provider-may qualify to compete for support to an area and the auction will assign support to at most one entity in a fair and transparent process. Support amounts for a particular area will not be lower than an amount that the winning bidder (which knows its situation best) indicates that it is willing to accept in exchange for meeting the program requirements. A cost model may provide a generalized estimate of costs, but modelled costs will be overstated in many cases. Accordingly, the Commission does not base the budget that it adopts for Phase I of the 5G Fund on an estimate of total costs (however estimated, according to a model such as that submitted in the record or any other method), but on a careful balancing of its priorities to expand the deployment of 5G mobile broadband service to rural areas where Americans live, work, and travel with the Commission's obligation to be fiscally responsible as the steward of limited universal service funds.

70. Additionally, consistent with the Commission's conclusion in both the 5G Fund Report and Order and the Mobility Fund Phase II Report and Order, 82 FR 15422 (Mar. 28, 2017), the Commission declines to adopt any alternative mechanisms to distribute its limited budget, such as the plan requested by SBI in its Petition for Reconsideration filed in 2020, or as it recently revised and tailored in its reply comments concerning the 5G Fund FNPRM (collectively SBI's request for a "Remote Tribal Areas Fund"). Likewise, the Commission also declines to adopt the suggestion of NTCA to implement a Small Carrier Fund as part of its 5G Fund budget. NTCA renews a similar argument raised in 2020, proposing that the Commission should retain $1.5 billion of the 5G Fund budget and, in lieu of having small carriers participate in an auction, should instead distribute this reserved budget over a ten-year period to current recipients of frozen support that have 500,000 or fewer subscribers in the aggregate in the U.S. Department of Agriculture's Rural-Urban Commuting Area (RUCA) Codes 5-10.

71. The Commission emphasizes that it remains committed to reserving support for service to Tribal lands in the 5G Fund, and as the Commission has stated previously, it recognizes that "Tribal lands will be more expensive to serve than non-Tribal lands due to their lower population density, and income levels, as well as the lack of power or roads in some parts of Indian country and the need for federal approval (such as from the Bureau of Indian Affairs) before broadband can be deployed there." However, as the Commission explained in the 5G Fund Report and Order, and as the Commission affirms herein, it is not persuaded that adopting SBI's request for a Remote Tribal Areas Fund would result in an improved outcome for such areas over its decision to utilize a reverse auction to award a reserved portion of the budget for service to Tribal lands. The Commission therefore denies SBI's Petition for Reconsideration to the extent that it requests that the Commission adopt a special Remote Tribal Area Fund to distribute support rather than using an auction mechanism to distribute 5G Fund support reserved for Tribal areas.

72. The Commission also declines to adopt SBI's most recent version of its proposal to adopt a special case mechanism in lieu of making eligible areas on Tribal lands available in the 5G Fund Phase I auction or its suggestion that the Commission should provide special case treatment for mobile legacy high-cost support in remote Tribal lands not won at auction. While pointing to the rare decisions in which the Commission has awarded universal service support without the use of competitive bidding, SBI is unconvincing in arguing that the Commission should create another exception in this instance. The Commission has previously distinguished areas in Alaska from Tribal lands in the lower 48 states, and SBI has provided no new evidence that the Commission erred in its judgment, simply rearguing the same positions it has offered and the Commission has rejected twice before. As the Commission explained the first time it declined to adopt SBI's request to adopt a funding plan for Tribal areas that was similar to the Alaska plan, "the unique basis for the adoption of the Alaska plan was not the existence of Tribal lands in Alaska" but rather was based on the challenges facing the entire state. The Commission also disagrees with SBI that the amount it has reserved for Tribal support is inadequate. As explained herein, the Commission has proportionately increased the amount it reserves for service to Tribal lands in the 5G Fund Phase I auction to up to $765 million, which should lessen concerns that the budget reserved for providing support to Tribal lands is underfunded. The 5G Fund has insufficient resources to fund every area of the country that lacks unsubsidized 5G mobile service, and to do so at the level of support estimated to be needed by cost studies or other means, whether those areas are located in remote Tribal areas or otherwise. As stewards of the Universal Service Fund, the Commission has the obligation to adopt policies and procedures for the 5G Fund that benefit the public as a whole and that serve the public interest generally, within its abilities to do so.

73. Similarly, based on the Commission's decisions in the 5G Fund Report and Order, the current record, and its experience with competitive bidding mechanisms, the Commission is not convinced that NTCA's proposed approach for small carriers would be a more efficient or effective means of awarding support than through an auction. The Commission remains unpersuaded that reserving a portion of the budget to distribute through a Small Carrier Fund improves its ability to better target support or to significantly accelerate 5G deployment in rural areas; thus, the Commission affirms the Commission's decision in the 5G Fund Report and Order to distribute its entire budget through a reverse auction. Moreover, the Commission affirms its prior determination that such a proposal is inconsistent "with [its] decade-long efforts to reform universal service high-cost support." As the Commission previously explained, to the extent NTCA is correct that carriers receiving legacy high-cost support can deploy 5G networks in their service areas more efficiently, the Commission continues to anticipate they will have an advantage against bidders in the 5G Fund Phase I auction that do not already serve those eligible areas in the auction. In sum, the Commission continues to conclude that using a reverse auction to award 5G Fund support best achieves its policy goals and "that setting aside funds for a limited subset of providers would be an inefficient use of [its] scarce resources, and could limit [the Commission's] ability to expand 5G coverage to as many unserved areas as possible." As the Commission explained in the 5G Fund Report and Order, if the Commission were to implement a plan such as this, it "would risk overpaying for 5G networks in some areas that another provider (or even the same legacy support recipient) would be willing to serve for less support through an auction."


[top] 74. In contrast to reserving support and awarding it through a specialized fund of any sort, a reverse auction uses competition across areas and within areas to determine which areas will receive support, in what amounts, and which entities will receive that support, all within the available budget. This means the Commission will be able to distribute support across as many page 101373 square kilometers as possible within the available budget at amounts the winning bidders have agreed to accept, consistent with its fiscal responsibilities. Doing so serves the Commission's policy goals to reform and modernize the distribution of mobile high-cost support, a goal that it has repeatedly articulated since 2011. The Commission explained in the 5G Fund Report and Order that in contrast to the use of competitive bidding, in the existing mobile legacy high-cost support program, neither the areas for which legacy support is disbursed nor the amount of support carriers receive have a direct nexus to the areas most in need of support or the amount needed to provide service therein. Moreover, and as explained previously, the funds available to subsidize 5G mobile broadband service are not unlimited, and, as commenters warn, raising the budget does not come without an impact to the universal service contribution factor.

75. For similar reasons, the Commission also declines to increase the 5G Fund Phase I budget further to account for the inclusion of eligible areas in Puerto Rico and the U.S. Virgin Islands in the 5G Fund Phase I auction. The Commission disagrees with commenters that suggest that the inclusion of eligible areas from Puerto Rico and the U.S. Virgin Islands will further strain the budget. While increasing the budget might result in areas that have higher costs to serve receiving a winning bid, it is also possible that any additional increase in the budget could be split between supporting new areas and providing greater support to bidders that would have agreed to provide service at lower support amounts. Moreover, increasing the budget to account for the inclusion of additional eligible areas, regardless of where those areas are located, will not ensure any particular eligible area will ultimately receive support through the auction.

76. Lastly, many commenters also advocate that the Commission should continue to consider how other federal and state funding to deploy broadband will impact the provision of 5G mobile broadband service before establishing the budget for the 5G Fund Phase I auction. The majority of such comments focus on the funding stemming from the Infrastructure Investment and Jobs Act (Infrastructure Act), Public Law 117-58, 135 Stat. 429 (2021), which includes the largest-ever federal broadband investment. Section 60102 of the Infrastructure Act directs the National Telecommunications and Information Administration (NTIA) to establish the BEAD Program, through which NTIA will allocate $42.45 billion to states for grants "to bridge the digital divide."

77. On May 13, 2022, NTIA released the Notice of Funding Opportunity for the BEAD Program (BEAD Program NOFO), detailing the process for requesting BEAD Program funding for reliable broadband service. In it, BEAD defines "Reliable Broadband Service" as service that the Broadband DATA Maps show is accessible to a location via: (i) fiber-optic technology; (ii) Cable Modem/Hybrid fiber-coaxial technology; (iii) digital subscriber line (DSL) technology; or (iv) terrestrial fixed wireless technology utilizing entirely licensed spectrum or using a hybrid of licensed and unlicensed spectrum. Broadband networks funded by the BEAD Program must provide download speeds of at least 100 Mbps and upload speeds of at least 20 Mbps and "latency that is sufficiently low to allow reasonably foreseeable, real-time, interactive applications."

78. The BEAD Program NOFO set a July 18, 2022 deadline for NTIA to receive letters of intent from states and territories, as well as an August 15, 2022 deadline for any supplemental information. The BEAD Program NOFO also specifies a number of program requirements, including principles that states and territories must observe in their subgrantee selection, prioritization, and scoring processes. In particular, the BEAD Program NOFO prohibits states and territories from "treat[ing] as `unserved' or `underserved' any location that is already subject to an enforceable federal, state, or local commitment to deploy qualifying broadband" at the conclusion of the state's or territory's challenge process. States and territories must also ensure that subgrantees comply with obligations spelled out in the BEAD Program NOFO regarding network capabilities ( i.e., speed, latency, and uptime), deployment requirements, and service obligations. Finally, the BEAD Program NOFO requires states and territories to ensure that prospective subgrantees have the managerial and financial capacity to meet the commitments of the subgrant and any BEAD program requirements.

79. In recognition of the Infrastructure Act and the BEAD Program, in August 2022, the Commission released its Future of USF Report (FCC 22-67)-a report to Congress outlining the future of the Universal Service Fund. In that report, the Commission explained that "[f]unding for deployment under the Infrastructure Act focuses on fixed services, not mobile services. The Commission also noted that it "has a unique role to play in supporting the deployment of mobile broadband to maintain connectivity wherever people live, work, or travel." The Future of USF Report recommended that the Commission include, as part of its long-term plans, an evaluation of the impact of the BEAD Program and other federal and state broadband infrastructure investments discussed in this report on future mobile deployments.

80. The 5G Fund will support the deployment of advanced mobile broadband by requiring that support recipients deploy 5G-NR service at speeds of at least 35/3 Mbps. As the Commission explained in 2020, "the Commission believes support is best directed to modern 5G deployments rather than further deployments of 4G LTE technology." The 5G Fund therefore requires support recipients to meet public interest obligations to provide voice and 5G broadband service, and to satisfy distinct, measured performance requirements as a condition of receiving support. The 5G Fund and the BEAD Program therefore clearly serve very different purposes.

81. Moreover, most recently, in the 2024 Section 706 Report (FCC 24-27), the Commission concluded that "[b]ased on the separate use cases for fixed and mobile broadband as well as evidence that consumers tend to subscribe to both services when they can . . . fixed and mobile broadband services are not full substitutes." As the Commission explained in that report, "[b]oth services are necessary to ensure that all Americans have access to advanced telecommunications capability."


[top] 82. Similarly, in evaluating the impact of the BEAD Program on the Commission's implementation of the 5G Fund, the Commission finds that both programs are necessary to ensuring that all Americans have access to advanced telecommunications capability. The 5G Fund supports mobile broadband, BEAD supports fixed broadband, although some states may incorporate a provision among their prioritization selection criteria for subgrantees that favors a fixed broadband deployment that also supports mobile broadband. To date, however, the record does not indicate that any state has incorporated a mobile broadband service performance requirement on par with the 5G Fund's requirement for providing 5G-NR service at speeds of at least 35/3 Mbps. Likewise, although the Commission has seen at least one state (Louisiana) incorporate a commitment for a subgrantee to advance mobile broadband in order to receive BEAD funding, that commitment is to provide page 101374 only 4G LTE service. For this reason, the Commission is not persuaded by commenters that urge it to delay the 5G Fund Phase I auction until after BEAD support has been awarded because BEAD funding could be used to support mobile services as part of the BEAD recipients' broader deployment commitments. The Commission finds that moving ahead expeditiously with support for robust mobile broadband will best advance its shared goal of ensuring that all Americans have access to advanced telecommunications services.

83. The Commission is nonetheless mindful of its obligation to share information regarding its efforts to implement the 5G Fund with the U.S. Department of Agriculture (USDA) and NTIA, consistent with the Broadband Interagency Coordination Act (BICA), Public Law 116-260, 134 Stat. 3214, Div. FF, tit. IX, section 904 (2020) (codified at 47 U.S.C. 1308 et seq .). On June 25, 2021, the Commission, USDA, and NTIA announced they had entered into an agreement to share information about existing or planned projects that have received, or will receive, funding through the Commission's high-cost programs and programs administered by NTIA and the USDA, as required by BICA. Representatives of the agencies have been meeting regularly pursuant to the agreement. On February 17, 2023, the Commission released a report on the effectiveness of BICA, detailing the steps that the agencies were taking to ensure the most effective allocation of broadband funding. In addition, the Commission, the U.S. Department of Agriculture, the National Telecommunications and Information Administration of the U.S. Department of Commerce, and the U.S. Department of Treasury entered into a memorandum of understanding regarding information sharing in May 2022, which was renewed in May 2024.

84. Given the Commission's decision to make areas that lack unsubsidized 5G mobile broadband service at speeds of at least 7/1 Mbps eligible for support in the 5G Fund Phase I auction, areas that are being offered "unsubsidized" 4G LTE service, or even low levels of 5G service, will still be included in the auction. After carefully considering the issue of whether duplicative support for advanced, 5G mobile wireless service might result from BEAD funding being awarded in substantially the same geographic area as support being offered in the 5G Fund Phase I auction, the Commission concludes that, in the event that a BEAD subgrantee has made an enforceable commitment to a state, prior to the Commission's release of the final list of eligible areas, to deploy 5G-NR service at a speed of at least 35/3 Mbps in an in-vehicle environment, the Commission will consider that area to be ineligible for 5G Fund support, and it will not include such an area in the 5G Fund Phase I auction. In order for an area subject to an enforceable commitment to be considered ineligible for support in the 5G Fund Phase I auction, the commitment must require deployment of 5G-NR service at speeds of at least 35/3 Mbps to the entire area that would have otherwise been eligible for support in the 5G Fund Phase I auction. To the extent any provider has an enforceable commitment to a state or locality or instrumentality thereof outside of the BEAD Program, the Commission will treat such enforceable commitments the same as set forth herein. The Commission adopts this speed determination of at least 35/3 Mbps here for the purposes of evaluating whether an enforceable commitment to a state for the award of BEAD funding duplicates the policy goals and deployment requirements the Commission establishes for the 5G Fund such that the area should be considered to be ineligible for such support. The Commission directs OEA and WCB to determine during the pre-auction process, and after notice and comment, the procedures for removing areas from the final list of eligible areas for the 5G Fund Phase I auction.

85. Because any BEAD-related enforceable commitments to deploy advanced, 5G mobile networks would be new network deployments-just like those deployed with support from the 5G Fund-the Commission does not want to remove BEAD-funded areas summarily from the 5G Fund and risk the possibility that consumers in those areas might be left to accept a reduced level of service for an indeterminate period of time. For similar reasons, the Commission concludes that an enforceable commitment to a state must also require that the BEAD subgrantee deploy 5G-NR service at speeds of at least 35/3 Mbps in an in-vehicle environment within the same milestone deadlines that apply to 5G Fund support recipients, thereby meeting the Commission's performance requirements for the 5G Fund. To ensure that an enforceable commitment made with BEAD funding complies with the 5G Fund's 5G-NR service and at least 35/3 Mbps speed requirements for the purposes of determining whether to remove such an area from eligibility from the 5G Fund, the enforceable state commitment must also include verification processes that involve the submission of infrastructure data or on-the-ground test data to verify that the BEAD subgrantee has met these service and speed requirements. The Commission directs OEA and WCB to determine during the pre-auction process, and after notice and comment, a verification process that would demonstrate that a BEAD subgrantee has made an enforceable commitment to meet these service and speed requirements, prior to removing an area from the final list of eligible areas for the 5G Fund Phase I auction.

86. The Commission has previously taken aggressive measures post-auction to not award universal service support to areas where it has determined that there is an existing provision of service in an area or a significant concern regarding wasteful spending. Accordingly, the Commission directs OEA and WCB to seek comment in the pre-auction process on whether and how to establish a post-auction, pre-authorization procedure wherein an interested party could submit proof to the Commission prior to the award of 5G Fund support that demonstrates that there is a BEAD award that includes an enforceable state commitment for the deployment of verifiable mobile 5G-NR service at speeds of at least 35/3 Mbps that conflicts with a winning bid for an area offered in the 5G Fund Phase I auction. In the event such a process is implemented, consistent with its past practice, the Commission anticipates that it would take similar action here, up to and including declining to authorize support for that area. Thus, applicants in the 5G Fund Phase I auction are encouraged to perform due diligence, research, and analysis and factor into their bids and bidding strategies any state BEAD requirements that include a commitment from a subgrantee to deploy 5G-NR service at speeds of at least 35/3 Mbps as a condition to receiving BEAD funds.


[top] 87. The Commissions recognizes that offering support for advanced, 5G mobile broadband service that duplicates BEAD funding efforts would defeat the policy goals established for the 5G Fund. To that end, as explained above, the Commission is carefully coordinating its 5G Fund plans with other government agencies, including NTIA, as required by BICA. Moreover, the Commission agrees with commenters that advocate that BEAD funding can be leveraged to amplify the reach of 5G Fund support. The Commission further agrees that there are many benefits that can be derived from a 5G Fund support recipient's ability to capitalize on any advancements in fixed broadband service being offered in rural page 101375 America, particularly so that new BEAD-funded fiber can be used to connect towers built with 5G Fund support, and can increase capacity at existing towers currently using microwave backhaul. Insofar as it may cost a 5G support recipient less to provide 5G mobile broadband service in a rural area where a fixed broadband network has been, or will be, deployed with BEAD funding, the Commission expects that a bidder in the 5G Fund Phase I auction for such an area would be willing to bid to accept less support than if the area did not have a fixed service offering. Additionally, the Commission anticipates that even if the 5G Fund Phase I auction were to be held prior to all BEAD program support being awarded, applicants seeking to participate in a 5G Fund auction will have sufficient information about their own and others' current or future service offerings, including reasonably certain BEAD deployments, through basic due diligence to factor into their bids and bidding strategies the potential impact that BEAD funding may have on the market. The Commission notes that on June 28, 2023, NTIA issued the BEAD Challenge Process Policy Notice, providing guidance on several BEAD Program processes, such as the identification of existing broadband funding and the required challenge processes that states must conduct, that aim to avoid broadband funding overlaps.

88. For these reasons, the Commission disagrees with commenters that advocate that it should delay the implementation of the 5G Fund while the Commission determines the potential impact of BEAD funding on the deployment of mobile broadband services. Waiting to implement the 5G Fund until all BEAD funding is assigned and the success of that program is analyzed would do a disservice to Americans who live, work, and travel in rural areas, who should not be denied access to mobile services that are reasonably comparable to those provided in urban areas. As the Commission previously explained in its Future of USF Report, insofar as the BEAD Program serves to fund fixed wireless broadband deployment, the Commission has stated that pausing the process of preparing for a 5G Fund auction "would have detrimental impacts on consumers' access to advanced mobile wireless service." Delaying the 5G Fund would also require us to continue the current inefficient practice of providing legacy high-cost support in areas of the country where there is already unsubsidized mobile service and would thus be contrary to the policy initiatives the Commission has advocated since the adoption of the USF/ICC Transformation Order. Not only does the legacy high-cost support often reach areas where unsubsidized service exists, but also it is often duplicative- i.e., given to more than one mobile provider serving the same area. Continued delay of the transition away from legacy support is antithetical to the Commission's efforts in this proceeding to avoid providing support to the same area where another mobile service provider is receiving or will receive support to deploy 5G service. It would also undermine the underlying policy goal of the Commission's BICA obligations, which is to avoid duplicating government subsidies for the same service in the same area. Having undertaken a tailored effort to refresh the record and reignite the 5G Fund, the Commission is now well-positioned to make these determinations and ultimately begin the process to incentivize the deployment of networks providing advanced, 5G mobile broadband in areas where, absent subsidies, such service will continue to be lacking. Accordingly, the Commission concludes that the 5G Fund can enhance achievements of the BEAD program rather than conflict with them.

89. By adopting a budget of up to $9 billion for the 5G Fund Phase I auction, using a reverse auction to distribute support, and committing to reassess the amount that will be needed for Phase II of the 5G Fund in the future, the Commission will support the advancement of high-speed 5G mobile broadband in areas where Americans live, work, and travel. Moreover, the Commission continues to anticipate, as the Commission did in 2020 that many providers will use private capital in conjunction with 5G Fund support to build their 5G networks. The Commission therefore adopts a 5G Fund Phase I budget herein that again "seeks to balance the various competing objectives in section 254 of the Communications Act of 1934, as amended (the Act), including the objective of providing support that is sufficient, but not so excessive so as to impose an undue burden on consumers and businesses." The courts have held that the Commission enjoys broad discretion when conducting exactly this type of balancing. Accordingly, the Commission concludes that setting the 5G Fund Phase I budget at up to $9 billion establishes a significant start to support the build out of advanced, 5G mobile wireless broadband networks in unserved and underserved rural areas.

V. Accepting Bids and Identifying Winning Bids

A. Metric for Accepting Winning Bids and Identifying Winning Bids

90. The Commission adopts a bidding and support price metric based on dollars per square kilometer that, as described below, includes a weighting factor that weights bids and support prices based upon service availability within an eligible area. In the 5G Fund FNPRM, the Commission sought comment on using a bidding and support price metric based on dollars per square kilometer in the event that it decides to limit eligible areas to hex-9s that have locations and/or roads. The Commission also sought comment on whether to adjust the square kilometers associated with an eligible area using either the adjustment factor that was adopted in 2020 or another approach. Based on its policy goal to use the available budget most efficiently to provide 5G coverage to places where people live, work, and travel, the Commission declines to employ the adjustment factor that it adopted in the 5G Fund Report and Order as part of the metric for accepting and identifying winning bids in a 5G Fund auction, because doing so would prioritize sparsely populated areas over areas where people live, work and travel as indicated by available data. However, consistent with alternatives proposed in the current record, the Commission adopts an alternative adjustment approach to differentiate between eligible areas that lack 4G-LTE service by an unsubsidized provider and those that have such service, as addressed below.

1. Bidding and Support Metric


[top] 91. In the 5G Fund Report and Order, the Commission decided that it would accept bids and identify winning bids in the 5G Fund Phase I auction using a support price per adjusted square kilometer. Under this metric, each eligible area would be associated with a number of units equal to the square kilometers of the area multiplied by an adjustment factor that was also adopted in the 2020 proceeding. The corresponding support amount for an area would be the number of adjusted square kilometers multiplied by the price. The Commission retains a bidding and support metric based on dollars per adjusted square kilometer, but as explained further herein, modifies the factors upon which it will base the adjustment. page 101376

92. In the 5G Fund FNPRM, the Commission asked whether there were alternative bidding and support metrics that might target unserved locations and/or unserved road miles more specifically, if eligible areas were limited to those census tracts that include unserved locations and/or roads. The Commission further asked whether a single targeted metric would appropriately balance unserved road miles and unserved locations-for example, by using a weighted sum of unserved locations and unserved road miles-and how the balancing weights should be determined.

93. There are no objections in the record to basing the bidding and support metric on square kilometers. Verizon affirms the Commission's choice of square kilometers, noting that "[b]ecause hex-9s are small-with an area of just 0.1 square kilometers-a per-square kilometer bidding and support metric is likely sufficient to ensure that CCA urges us not to use a metric based on the number of locations in an eligible area, since "[s]uch an approach would inappropriately adopt a fixed-centric basis for support price calculation." The Commission agrees that an appropriate metric should target support for mobile service more broadly than solely based on locations. Accordingly, consistent with the goals of this proceeding to expand 5G coverage to areas where people live, work, and travel, the Commission will use a bidding and support metric based on dollars per square kilometer. roads or locations in the supported hex-9s have access to 5G service."

94. CCA urges us not to use a metric based on the number of locations in an eligible area, since "[s]uch an approach would inappropriately adopt a fixed-centric basis for support price calculation." The Commission agrees that an appropriate metric should target support for mobile service more broadly than solely based on locations. Accordingly, consistent with the goals of this proceeding to expand 5G coverage to areas where people live, work, and travel, the Commission will use a bidding and support metric based on dollars per square kilometer.

2. The Adjustment Factor as Adopted in 2020

95. The Commission will not use the adjustment factor that was adopted in the 5G Fund Report and Order for bidding in the 5G Fund Phase I auction. The Commission will, however, retain the adjustment factor for purposes of disaggregating legacy support. The Commission bases its decision not to use the adjustment factor in bidding on the inconsistency between its goal of ensuring that the available budget is used to benefit as many people as possible and the purpose of the adjustment factor, as adopted in the 5G Fund Report and Order. The Commission's goal in 2020 was to allow the more costly eligible areas (defined, in part, by low population density and difficult terrain) to compete on a more equal basis with the eligible areas that were less costly to serve. By applying such an adjustment factor, sparsely populated, particularly costly areas that would have a high adjustment factor and areas that could be served at lower cost per square kilometer, would have had approximately equal chances of winning support in the auction. Applying such an adjustment factor would have shifted funds away from more populated and traveled eligible areas, which is in conflict with the Commission's goal of targeting unserved and underserved residents, workers, and travelers. The Commission therefore sought comment on whether to use this adjustment factor, to adopt an alternative adjustment factor that would provide some advantage to particularly costly areas that nonetheless are areas with a considerable number of homes, businesses, and other locations and/or roads that are frequently traveled, or to abandon the use of any adjustment factor altogether. With respect to its decision to retain the adjustment factor adopted in the 5G Fund Report and Order for purposes of disaggregating legacy support, the Commission's rationale in 2020 for adopting the adjustment factor remains unchanged.

96. Relatively few parties commented on the continued use of the adjustment factor for bidding as adopted in the 5G Fund Report and Order. Of those that submitted comments or reply comments on the issue, four parties-CRWC, RWA, SBI, and US Cellular-indicate that the Commission should eliminate the adjustment factor only if it adopts a larger budget, with CRWC noting that "[i]f the budget comes up short, funds will exhaust before the higher-cost areas, which are the areas most in need of support, receive any support." T-Mobile recommends that the Commission "reaffirm [the Commission's] approach of using an adjustment factor to prioritize areas that are the most costly and least profitable to serve."

97. Verizon, on the other hand, urges us to eliminate the adjustment factor for bidding. It asserts that "[t]he Commission should maximize the impact of the limited 5G Fund budget by focusing support on those unserved areas that would have the most significant demand for mobile broadband service and require relatively smaller subsidies, rather than on areas that would have little demand for mobile broadband service and require larger subsidies."? 2 The Commission agrees with Verizon that it should discontinue use of the adjustment factor for bidding as adopted in the 5G Fund Report and Order, and with Verizon's reasoning that 5G Fund support dollars should instead be targeted to those currently unserved and underserved areas where more people are likely to live, work, and travel.

Footnotes:

2 Verizon Comments at 9.


[top] 98. With respect to commenters' arguments that the bidding adjustment factor should be eliminated only if the Commission significantly increases the budget, the Commission is not persuaded that it would be a cost-effective use of 5G Fund support to increase the budget for the purpose of extending support to areas that would have been given an advantage with the current adjustment factor. As a threshold matter, and as addressed above, the adjustment factor would shift funds away from more populated and travelled areas to more remote areas, which is in conflict with the Commission's goal of covering as many areas where people live, work, and travel as possible. Therefore, the Commission does not support the adjustment factor as originally designed, as suggested here. Second, under this reverse auction mechanism, a large increase in the budget would not translate into a similarly large increase in the total area that can be assigned 5G Fund support. Instead, the additional funds would be divided between support to some higher-cost areas that would not have been assigned support otherwise and support at unnecessarily high prices to the same areas that would win support under a lower budget. Under the descending price clock reverse auction mechanism, the budget clears and support assignment begins when total requested support at the current clock price is equal to or less than the budget. If the budget is increased significantly without a proportional increase in the number and cost distribution of eligible areas, the clearing round support price will be higher. Some of the more costly areas will likely be assigned at the higher support level, but the most costly areas will not receive support. Lower cost areas-those that would have won support under the original budget-will be funded, but at prices well above those they would have been willing to accept. Thus, the Commission believes page 101377 it would be an inefficient use of federal resources to increase the budget for the purpose of extending support to the most remote areas. Finally, even if the Commission were persuaded that that the original adjustment factor should be retained (which it is not) or that increasing the budget significantly would be an acceptable alternative to the adjustment factor (which it also is not), fiscal responsibility precludes us from increasing the 5G Fund budget by more than the $1 billion increase set forth above. Although $1 billion is a substantial increase, it is likely less of an increase than is envisioned by the commenters. Therefore, for all of these reasons, the Commission is unpersuaded that increasing the budget by significantly more than $1 billion for the purpose of reaching the hardest-to-serve areas is a fiscally responsible approach to spending its limited universal service funds.

99. Given the Commission's decision today to eliminate the use of the adjustment factor adopted in the 5G Fund Report and Order for bidding in the 5G Fund Phase I auction, the Commission also dismisses as moot the Petition for Reconsideration filed by the 5G Fund Supporters to the extent that it requests relief concerning the use of the adjustment factor adopted in the 5G Fund Report and Order for bidding in that auction.

3. An Adjustment That Weights Bids and Support Prices Based on Service Availability

100. In its discussion in the 5G Fund FNPRM of the bidding and support metric and the adjustment factor adopted in the 5G Fund Report and Order, the Commission asked "whether [it] should adopt an alternative approach that would provide some advantage to particularly costly areas that nonetheless are areas with a considerable number of homes, business[es], and other locations, and/or roads that are frequently travelled." Several commenters suggest prioritizing areas based upon the level of service that is available. To address these concerns, the Commission will implement a service-based weighting factor for those areas that lack 4G LTE service. To eliminate confusion with the adjustment factor adopted in the 5G Fund Report and Order, which the Commission will retain for purposes of disaggregating legacy support, the Commission refers to the service-based factor it adopts herein as a "weighting factor." While eligible areas will include both those that lack unsubsidized 5G broadband service but have access to unsubsidized 4G LTE and areas that lack both unsubsidized 5G service and any 4G LTE service, the Commission finds there are greater public benefits of providing 5G service to areas that lack 4G LTE than the benefits of 5G accruing to other eligible areas. As such, a weighting factor based on this distinction is warranted. The Commission is mindful, however, of its primary responsibility to use the budget cost-effectively to provide support to people where they live, work, and travel. Accordingly, unlike the adjustment factor that was calculated to allow a bid to compete on an equal basis with bids to provide service to a geographic area with several times the number of square kilometers for the same support amount, the weighting factor is intended to give bids for unserved areas an advantage, but not so great an advantage as to result in a significant reduction in the number of square kilometers that can be covered with 5G Fund support.

101. Therefore, the Commission adopts a service-based weighting factor. Consistent with their existing authority concerning the distribution of universal service support, the Commission directs OEA, WCB, and WTB to establish during the pre-auction process, after notice and comment, the size of this service-based weighting factor. The Commission directs OEA, WTB, and WCB to take into account the need to balance the Commission's fiscal responsibility to award 5G Fund support cost-effectively with a recognition that there may be additional challenges to and public benefits from providing service to areas that lack 4G LTE service.

B. Minimum Geographic Area for Bidding

102. The Commission will use census tracts as the minimum geographic unit for bidding in the 5G Fund Phase I auction and will aggregate all of the eligible hex-9s into a census tract for purposes of bidding. The Commission's goal in adopting census tracts rather than hexes as the minimum geographic area for bidding is to ensure that a wide variety of interested bidders, including small entities, have the flexibility to design a network that matches their business model and technical capabilities and that allows them to efficiently achieve their public interest obligations and performance requirements. After considering the record on this issue, we conclude that, on balance, using census geographies is preferable to using hex areas. Census geographies provide a more efficient and appropriate way to group areas eligible for the 5G Fund into larger geographic areas for purposes of bidding for areas along state boundaries, particularly in view of the Commission's decision herein to convert those areas to hex-9s.

103. Commenters are equally split on whether the Commission should use census geographies or the H3 hexagonal geospatial indexing system (H3 system) to group eligible hex-9s for bidding. CCA and Verizon each support aggregating eligible hex-9s into census geographies. Verizon advocates grouping eligible hex-9s into census tracts or larger for ease of auction administration, and contends that using hexes-whether at the resolution 5 hexagon (hex-5) or resolution 6 hexagon (hex-6) level-"would introduce unnecessary complexity into the auction, require considerable software development by potential bidders, and could reduce auction participation."

104. AT&T and Michael Ravnitzky, on the other hand, support using the H3 system to aggregate areas eligible for support to minimum geographic areas for bidding because, they assert, it is a logical approach and aligns areas eligible for 5G Fund support with the BDC mobile mapping and challenge processes, would be more efficient than trying to aggregate eligible hex-9s into census block groups (CBGs) or census tracts, and provides a consistent and flexible framework for defining and mapping eligible areas. AT&T contends that "[a]ggregation of [eligible] hex-9s at the hex-6 level, which covers on average 36 square kilometers, best reflects the design of wireless infrastructure in rural areas with various terrain and foliage that has not already attracted private investment . . . [and] is more manageable [for providers than] committing to cover locations or certain roads in a hex-5 area, [which cover] 252 square kilometers." Ravnitzky suggests "[u]s[ing] resolution 8 hexagons or higher for aggregating eligible areas . . . [to] provide sufficient granularity and accuracy for capturing the variations in cost and value of providing 5G service in different areas," and "group[ing] adjacent hexagons into larger geographic units based on their proximity, similarity, and contiguity . . . [to] create more coherent and efficient geographic units for bidding and support purposes."


[top] 105. The Commission concludes that, on balance, aggregating eligible hex-9s to census geographies is preferable, irrespective of the resolution of hexagon level used. Census geographies aggregate to the state level, and eligible telecommunications carriers (ETC) designations-which all winning bidders are required to obtain prior to page 101378 being authorized for support-are issued by state. In contrast, hex boundaries are not coterminous with state, county, and international boundaries. Additionally, due to the nature of the H3 system, in which not all higher resolution hexagons ( e.g., hex-9) are contained within the boundaries of their ancestor lower resolution hexagons ( e.g., hex-6 or hex-5), use of a lower resolution hexagon, such as hex-5 or hex-6, as the minimum geographic unit for bidding runs the risk that entire portions of the eligible areas, which will be converted to and expressed at the hex-9 level, may fall outside of the hex-5 or hex-6 boundary to which they are aggregated. Moreover, we note that the average hex-5 has an average area that is larger than the average areas of either of the two census geographies considered, and thus may not provide the best opportunity for bidders to target their bids to win support for the areas they are interested in serving. Because the Commission would have to use fairly large hex areas for bidding units, it would have to account for many hexagons covering multiple state and international boundaries, which would complicate an applicant's inventory selections and state ETC designations. For these reasons, the Commission does not agree that aggregating eligible hex-9s into larger hexagons would be more efficient than aggregating them to census tracts.

106. The Commission further concludes that aggregating to census tracts, as opposed to census block groups (CBGs), is preferable for several reasons. First, because the boundaries of a CBG are often defined by roads, using CBGs could have the unintentional effect of leaving the road that bounds a CBG not served by the bidder that wins support for the CBG. Using census tracts minimizes that problem. Second, wireless networks are often built to cover areas that are larger than a CBG with a single cell site. Third, because census tracts are larger than CBGs, using census tracts will also help mitigate the risk of funding duplicative, overlapping networks if two different bidders were to win support for adjacent CBGs. Finally, using census tracts, as opposed to CBGs, will result in a smaller number of biddable items, which will make bidding in the auction more manageable.

VI. Compliance WitH 5G Fund Public Interest Obligations and Performance Requirements

A. Metric for Measuring Compliance With 5G Fund Public Interest Obligations and Performance Requirements

107. In the 5G Fund FNPRM, the Commission sought comment on its approach to making any necessary corresponding modifications concerning the metric used to measure a 5G Fund support recipient's compliance with its public interest obligations and performance requirements if the Commission were to modify the bidding and support price metric that was adopted in the 5G Fund Report and Order. All commenters that address this issue support the Commission's approach for doing so, and no commenter opposes it. As discussed above, the Commission intends to use a bidding and support price metric for the 5G Fund Phase I auction that is based on dollars per adjusted square kilometer. Because the metric for measuring compliance with the 5G Fund public interest obligations and performance requirements adopted in the 5G Fund Report and Order is already based on square kilometers, no modifications to the previously adopted compliance metric are necessary as a result of the Commission's decision today regarding the bidding and support price metric that will be used for the 5G Fund Phase I auction.

108. A few commenters suggest other changes concerning the public interest obligations and performance requirements adopted in the 5G Fund Report and Order. RWA asks the Commission to update the 3GPP performance standard for eligible 5G services to at least 3GPP Release 17, given that the 3GPP Release 15 standard adopted in the 5G Fund Report and Order is now outdated. RWA notes that 3GPP Release 18 (5G-Advanced) is expected to be rolled out in the fourth quarter of 2023, and that development of 3GPP Release 19 is set to begin in December 2023. ARA PAWR suggests that the Commission consider bidder capability in setting deployment milestones by, for example, giving a rural carrier trying to cover a very remote area more time to meet deployment milestones, while SBI states that a better alternative to using adjustment factors is "changing the performance criteria for remote areas . . . [to] reduce the performance requirements commensurate with microwave backhaul capabilities." According to SBI, carriers serving very remote areas (as defined by the Commission) "could be much more competitive in an auction if they are required to deliver mobile 4G LTE service at a median speed of 71 Mbps, rather than a median speed of 35/3 with 5G." T-Mobile expresses support for the 5G Fund milestones, but suggests that the Commission create incentives to encourage 5G Fund support recipients to deploy service to more than 85% of an area by the final deployment milestone by reducing support proportionally to the percent of uncovered area between 85% and 100% and requiring recipients who deploy service to at least 85% but less than 100% of their winning geographic areas to return that support on a prorated basis. T-Mobile also notes that "[t]he Commission could consider giving [support recipients] an extra year to meet the higher [deployment] thresholds."


[top] 109. The Commission notes that when the Commission adopted the 5G Fund Report and Order, it stated that 5G Fund support recipients would be required to comply with "at least the 5G-NR . . . technology standards developed by [3GPP] with Release 15 or any successor release that may be adopted by [OEA and WCB] after notice and comment." The "Releases" page on 3GPP's website shows that work on 3GPP Releases 16 and 17 has been completed and they are now available, and that work on 3GPP Release 18 is expected to be completed later this year. Given that two successor releases have been completed since the 3GPP Release 15 standard was adopted for 5G Fund support recipients in the 5G Fund Report and Order, the Commission directs OEA and WCB to initiate a notice-and-comment rulemaking to determine whether and how to update the 3GPP standard. We also note that, in making its determination in the 5G Fund Report and Order that entities seeking to receive support from the 5G Fund must have access to spectrum and sufficient bandwidth (at a minimum, 10 megahertz x 10 megahertz using frequency division duplex (FDD) or 20 megahertz using time division duplex (TDD)) capable of supporting 5G services in the particular area(s) for which they intend to bid, the Commission observed that 3GPP Release 16 had finalized a list of various frequency bands for North America that appeared at that time to be capable of supporting 5G. Given the passage of time and 3GPP's ongoing work since the 5G Fund Report and Order was adopted, the Commission directs OEA, WCB, and WTB to determine in the pre-auction process, and after notice and comment, page 101379 whether there are 5G-capable spectrum bands other than those identified in 3GPP Release 16 that entities seeking to receive support from the 5G Fund could use to meet the 5G Fund public interest obligations and performance requirements.

110. The Commission declines to make any of the other changes suggested by commenters concerning the previously adopted performance requirements. The Commission finds that the suggestions offered by ARA PAWR and SBI that it adopt differing compliance deadlines and performance standards for support recipients serving remote areas to be inconsistent with the 5G Fund's policy goals of ensuring the rapid deployment of 5G mobile wireless broadband networks. T-Mobile's suggestions are similar to suggestions offered earlier in the 5G Fund proceeding, which the Commission declined to adopt as both unworkable and unrealistic. As the Commission observed in the 5G Fund Report and Order, "[t]here may be isolated areas that are particularly challenging to serve even in terrain that is otherwise not difficult to serve, and adopting a 100% coverage requirement could drastically increase costs in a 5G Fund auction if bidders reasonably conclude that certain areas they would otherwise be interested in serving are cost prohibitive due to an especially challenging terrain feature like a ravine or mountaintop," which "would [] potentially distort the 5G Fund auction with little gain." We note that the Commission also previously declined to adopt a 100% final deployment milestone percentage for Mobility Fund II based on commenters' arguments in that proceeding that a 100% buildout requirement is unrealistic in remote areas as well as most rural areas, and could discourage bids. The Commission concludes that the Commission struck an appropriate balance in adopting an 85% final coverage requirement in the 5G Fund Report and Order, and find that T-Mobile has not offered anything in its comments that persuades us to depart from the Commission's earlier conclusions.

B. Methodologies for Demonstrating Compliance With 5G Fund Performance Requirements

111. Consistent with the recommendations of many commenters, the Commission modifies the methodologies for demonstrating compliance with 5G Fund performance requirements adopted in the 5G Fund Report and Order to align largely with those adopted for the BDC verification process. In the 5G Fund Report and Order, the Commission decided it would generally align with the BDC the methodologies used by 5G Fund support recipients to demonstrate compliance with their interim and final performance requirement milestones. The Commission concluded that standardizing the data required for compliance reporting was likely to ease the burden on support recipients, while collecting sufficient data to confirm that the 5G Fund's requirements have been met. In the 5G Fund FNPRM, the Commission proposed and sought comment on requiring 5G Fund support recipients to use the methodologies adopted for the BDC mobile verification process-which allow mobile providers to choose to submit either on-the-ground test data or infrastructure data to verify coverage in response to a mobile verification request from the Commission-as the basis for substantiating coverage and demonstrating compliance with the 5G Fund interim and final deployment milestones. In addition, the Commission sought comment on whether 5G Fund support recipients should be required to submit on-the-ground test data for areas that are accessible and infrastructure data for areas that are inaccessible. The Commission also sought comment on whether 5G Fund support recipients should submit infrastructure data sufficient to generate a "core coverage area," as defined in the BDC mobile verification process, and on-the-ground test data for areas outside of that core coverage area, or should instead be allowed to submit either type of data regardless of the type of area in which they are deploying service. The Commission also described and sought comment on the specific on-the-ground test data and infrastructure data 5G Fund support recipients would need to submit.


[top] 112. In response to the 5G Fund FNPRM, many commenters express support generally for harmonizing the 5G Fund's compliance processes with the BDC's verification processes, and no commenters oppose this approach. The Commission agrees with commenters and adopts its proposal to largely align the methodologies for demonstrating compliance with the 5G Fund interim and final deployment milestones with those adopted for the BDC mobile verification process. The Commission finds this approach will give 5G Fund support recipients the same flexibilities afforded under the BDC rules to choose which type of verification data to submit. This approach also affords Commission staff the right to collect additional data as necessary. The Commission therefore amends the Commission's rules as necessary to accommodate such alignment, consistent with the specific needs of the 5G Fund. Based on supportive comments in the record, the Commission requires that, in its interim and final milestone reports, each 5G Fund support recipient (1) certify that the 5G mobile broadband coverage data filed in its BDC biannual submissions demonstrate that its deployments in the area(s) for which it receives 5G Fund support meet the 5G Fund coverage, speed, and latency requirements, and (2) substantiate its reported 5G mobile coverage data by submitting either on-the-ground test data or infrastructure information. A support recipient can submit either type of information (either on-the-ground test data or infrastructure data), regardless of whether it is deploying service in an accessible or inaccessible area, but it must submit at least one type of data for a whole state. A support recipient may submit different types of data for different states and may voluntarily submit the additional data type for part or all of a state. For example, a 5G Fund support recipient may submit only infrastructure information reflecting coverage their supported area in State A, and only on-the-ground data for the sampled area(s) in State B, but it may not submit only infrastructure information in a census tract in State A and only on-the-ground data in a different census tract in State A. This does not preclude a 5G Fund support recipient from submitting both infrastructure information and on-the-ground data, so long as it submits one type of data for all of its supported areas in a state. A 5G Fund support recipient shall submit its interim service and final service milestone reports, including on-the-ground measurement tests or infrastructure information, in the Broadband Data Collection portal. As discussed below, 5G Fund support recipients submitting on-the-ground data will do so for a sample of hex-9s within its supported area, whereas support recipients submitting infrastructure information are required to submit data for all cell sites and antennas that serve a 5G Fund recipient's supported area. This approach is consistent with the BDC verification process, in which providers submitting on-the-ground data do so for a statistically valid sample of areas within a targeted area, whereas providers submitting infrastructure information do so for the entire targeted area. The Commission directs 5G Fund support recipients to indicate which type of data they will submit for each page 101380 state. To ensure the accuracy of the data being submitted, the Commission requires 5G Fund support recipients to have their on-the-ground or infrastructure data certified by an engineer with the same qualifications as required for submitting the BDC biannual filings that apply under section 1.7004 of the Commission's rules.

113. On-the-Ground Test Data. In the 5G Fund Report and Order, the Commission required 5G Fund support recipients to conduct on-the-ground speed tests to substantiate 5G broadband coverage, and adopted specific methodologies for on-the-ground speed tests to substantiate 5G broadband data. Additionally, the Commission determined it would defer the adoption of additional requirements and parameters for such on-the-ground measurement tests until the pre-auction process. As discussed above, 5G Fund support recipients have the option of submitting either on-the-ground test data or infrastructure information, on a state-by-state basis. The Commission requires 5G Fund support recipients submitting on-the-ground data to do so in accordance with the parameters and specifications established in the BDC mobile verification process and the BDC Data Specifications for Mobile Speed Test Data. The Commission further requires that all such tests be taken in an in-vehicle mobile environment only because, as more fully explained herein, unlike for the BDC, 5G Fund support recipients must demonstrate their compliance with the 5G Fund performance requirements by submitting tests that are taken in an in-vehicle mobile environment only. A 5G Fund support recipient must submit on-the-ground test data for a sample of hex-9s within its supported area within a state. The sample will be statistically appropriate and selected by Commission staff. The use of hex-9s is a variation from the mobile verification process, which uses a sample of hex-8s. Because eligible and supported areas in the 5G Fund Phase I will be based on hex-9s, the Commission adopts a methodology that relies on hex-9s instead of hex-8s. If the number of supported hex-9s in a state is too small to sample a subset of them, all hexagons may be selected in that area, or the small area will be combined with other nearby area(s) where support has been awarded, to the extent they exist for the support recipient, to create a larger area that can be sampled.

114. The Commission also requires a 5G Fund support recipient's cumulative on-the-ground test data within a sampled area to show that at least 90% of its speed test measurements report 5G-NR service at minimum download and upload speeds of at least 35/3 Mbps in an in-vehicle environment, and that at least 90% of tests record latency of 100 milliseconds or less for each of the support recipient's interim and final deployment milestones. The Commission notes this is a change from the performance requirements adopted in the 5G Fund Report and Order, which require 5G Fund support recipients to meet baseline performance speed requirements of a median of 35 Mbps download and 3 Mbps upload, and with at least 90 percent of measurements recording data transmission rates of not less than 7 Mbps download and 1 Mbps upload. However, requiring 5G Fund support recipients to submit cumulative test data showing that at least 90% of its speed test measurements report 5G-NR service at minimum download and upload speeds of at least 35/3 Mbps in an in-vehicle environment more closely aligns with the requirements adopted for BDC reporting. The Commission therefore amends section 54.1015(c)(1) of its rules, 47 CFR 54.1015(c)(1), in connection with aligning the methodologies for demonstrating compliance with the 5G Fund interim and final deployment milestones with those adopted for the BDC mobile verification process to specify that 5G Fund support recipients must meet a minimum baseline performance speed requirement of 35 Mbps download and 3 Mbps upload in an in-vehicle environment, with at least 90 percent of measurements recording these data transmission speeds. When conducting tests to demonstrate compliance with its 5G Fund performance milestones, a 5G Fund support recipient must record and submit at least two tests within each of the selected hexagons where the time of the tests are at least four hours apart, irrespective of date. However, if the 5G Fund support recipient has, and submits with its speed tests, actual cell loading data for the cell(s) covering the sampled hexagon showing that the median loading, measured in 15-minute intervals, did not exceed the BDC-modeled loading factor for the one-week period prior to the speed test submission, then the 5G Fund support recipient must submit two speed tests for the sampled hexagon, but without the restriction of testing four hours apart. Further, the target of at least 35/3 Mbps speed must be taken in an in-vehicle mobile environment. The Commission emphasizes that 5G Fund support recipients must submit tests taken in an in-vehicle mobile environment only, and recognizes that this requirement differs from the BDC verification process, in which providers must conduct on-the-ground speed tests for the technology (4G and/or 5G) and environment (outdoor stationary or in-vehicle mobile) listed within hexagons that require verification. Given that the Commission is providing universal service support through the 5G Fund for the deployment of 5G-NR service in rural areas, the Commission concludes that requiring 5G Fund support recipients to submit tests taken in an in-vehicle mobile environment only is appropriate, because measuring 5G-NR service at speeds of at least 35/3 Mbps in an in-vehicle environment reflects the most stringent and robust measurement we are collecting from providers in the BDC and will help ensure that rural areas receive service that is reasonably comparable to the service offered in urban areas. For in-vehicle tests, 5G Fund support recipients must conduct tests with the antenna located inside the vehicle to replicate typical consumer behavior and ensure more equivalent comparisons between the on-the-ground test data submitted by support recipients and the typical consumer experience.


[top] 115. Identifying Areas for On-the-Ground Testing. In the 5G Fund FNPRM, the Commission proposed to use a methodology for demonstrating compliance with 5G Fund performance milestones that is similar to that adopted for the BDC mobile verification process, except that 5G Fund support recipients would be required to submit speed test data for all supported areas, rather than a sample of areas, and the area would be hex-9, rather than the hex-8 area used in BDC mobile verification process. As discussed herein, if a support recipient chooses to submit on-the-ground test data, it must do so for a sample of hex-9s. The Commission received limited feedback in response to its proposal to require on-the-ground testing in all supported areas. However, T-Mobile argued that mandatory on-the-ground testing for all supported areas could become "prohibitively expensive and time consuming." The Commission agrees and therefore require that tests conducted and submitted for a sample of hex-9s within the supported area of a state. However, the sampling methodology used in the BDC mobile verification process may not translate well to demonstrating compliance with 5G Fund performance milestones. In the BDC mobile verification process, a verification inquiry can be conducted only when there is a "credible basis" for believing the provider's coverage may page 101381 be inaccurate, while the basis for verifying coverage is different in the 5G Fund context. Therefore, the Commission declines to adopt a specific sampling methodology at this time and directs OEA, WTB, and WCB to both establish the methodology that will be used by all 5G Fund support recipients to demonstrate compliance with their 5G Fund performance requirements and generate the sample of hex-9s for which each 5G Fund recipient must submit on-the-ground data at the time of its interim and final deployment milestones.

116. Infrastructure Data. In the 5G Fund FNPRM, the Commission proposed to require 5G Fund support recipients to submit the same infrastructure data required in the BDC mobile verification process to substantiate coverage in the areas for which they receive 5G Fund support. In the context of BDC mobile verifications, a provider must submit additional information beyond what is submitted as part of its biannual BDC availability data (propagation modeling details, as well as link budget and clutter data), including cell-site and antenna data for the targeted area. The Commission adopts this proposal, and require 5G Fund support recipients electing to substantiate their 5G Fund milestones with infrastructure data to submit all of the infrastructure data that providers submit as part of the BDC mobile verification process for all cell sites and antennas that serve a 5G Fund recipient's supported area. In its comments, Verizon asks the Commission to specify how it will use infrastructure data to verify compliance with the deployment obligations. Similar to BDC mobile verifications, staff will use the infrastructure data to estimate a "core coverage area," in which coverage at the modeled throughput is highly likely to exist at or above the minimum values reported in the provider's submitted coverage data. For any areas that are outside of the "core coverage area" but within the required coverage area, Commission staff will consider additional information submitted by the 5G Fund support recipient, such as on-the-ground test data, and may request such data from the provider if not already submitted. If any areas outside the core coverage area but within the required coverage area are inaccessible, the Commission will consider whether alternatives to on-the-ground drive testing data are appropriate to validate coverage in such areas. To facilitate the process of Commission staff review of a 5G Fund support recipient's data, the Commission directs staff to notify the support recipient of any additional requests for information, and the Commission amends section 54.1019 of its rules, 54 CFR 1019, to account for such case-by-case information requests.

VII. Schedule for Transitioning From Mobile Legacy High-Cost Support to 5G Fund Support

117. Consistent with the strong consensus among commenters, the Commission concludes that the phase down of mobile legacy high-cost support will commence upon the release of a public notice announcing the authorization of 5G Fund support, as more fully explained below. In view of the provision in the Consolidated Appropriations Act of 2023, Public Law 117-328, Div. E, Title VI section 624, 136 Stat. 4459, 4702, requiring that any support mechanism that serves as an alternative to Mobility Fund Phase II "shall maintain existing high-cost support to competitive eligible telecommunications carriers until support under such mechanism commences," the Commission sought comment in the 5G Fund FNPRM on a proposal to treat the release of the public notice announcing the close of the 5G Fund Phase I auction to be the point at which support under the 5G Fund "commences."

118. Many commenters maintain that the proposal suggested by the Commission in the 5G Fund FNPRM is inconsistent with the language in the Consolidated Appropriations Act of 2023. The Commission is therefore persuaded that it should follow the recommendations of commenters to commence the phase down of mobile legacy high-cost support upon the release of a public notice announcing the authorization of 5G Fund support.


[top] 119. Under this approach, the Commission will commence the two-year phase down of mobile legacy high-cost support in all areas that are ineligible for inclusion in the 5G Fund Phase I auction upon the release of the first public notice announcing the authorization of support in any eligible area. Similarly, the five-year phase down of mobile legacy high-cost support for eligible areas that are not won in the 5G Fund Phase I auction, where the carrier is a legacy support recipient and receives the minimum level of sustainable support for the area for which it receives support, will also commence upon the release of the first public notice announcing the authorization of the award of support in any eligible area. For eligible areas won in the 5G Fund Phase I auction in which the winning bidder is also the legacy support recipient for the area won, legacy support will cease and 5G Fund support will commence after the release of the public notice announcing the authorization of the award of support for that area. The Commission recognizes that this may create an incentive for winning bidders to delay prosecuting their long-form applications to the extent that the legacy support they currently receive is greater than 5G Fund support. Nonetheless, the Commission expects long-form applicants to expeditiously complete their applications and respond in a timely manner to staff requests for additional or missing information. For eligible areas that are won in the 5G Fund Phase I auction in which the legacy support carrier is not the winning bidder in the area, a two-year phase down of mobile high-cost legacy support will "commence" after the release of the public notice announcing the authorization of the award of support for that eligible area. Likewise, for eligible areas not won in the 5G Fund Phase I auction where the carrier is a legacy support recipient but does not receive the minimum level of sustainable support for the area for which it receives support, a two-year phase down of mobile high-cost legacy support will "commence" after the release of the first public notice announcing the authorization of the award of support for any eligible area. As explained above, areas in Puerto Rico and the U.S. Virgin Islands will proceed on the same transition schedule to either 5G Fund support or a two-year phase down of transitional support from the Bringing Puerto Rico Together Fund and the Connect USVI Fund, whichever is applicable. The Commission concludes that this approach complies with the text of the Consolidated Appropriations Act of 2023. The following chart summarizes the schedule the Commission adopts for transitioning from mobile legacy high-cost support to 5G Fund support: page 101382

Area eligibility Auction result Bidder or recipient status Support type and timing
Ineligible Two-year phase down of legacy support for all ineligible areas commences on the first day of the month after the release of the first public notice announcing the authorization of 5G Fund support in any eligible area.
Eligible Won in auction Carrier is the winning bidder and is the legacy support recipient for the area it won Legacy support ceases and 5G Fund support commences in an area on the first day of the month after the release of the public notice announcing the authorization of 5G Fund support for that area.
Eligible Won in auction Carrier is a legacy support recipient but is not the winning bidder in the area for which it receives support Two-year phase down commences in an area on the first day of the month after the release of the public notice announcing the authorization of 5G Fund support in that area.
Eligible Not won in auction Carrier is a legacy support recipient but does not receive the minimum level of sustainable support for the area for which it receives support Two-year phase down of legacy support commences on the first day of the month after the release of the first public notice announcing the authorization of 5G Fund support in any eligible area won in the auction.
Eligible Not won in auction Carrier is a legacy support recipient and receives the minimum level of sustainable support for the area for which it receives support Legacy support continues for no more than five years and the phase down of such support commences on the first day of the month after the release of the first public notice announcing the authorization of 5G Fund support in any eligible area won in the auction.

120. Consistent with the Commission's decision to include areas in Puerto Rico and the U.S. Virgin Islands that meet the eligible areas definition in the 5G Fund, these Territories will be subject to this transition schedule. For areas in Puerto Rico and the U.S. Virgin Islands, the transitional support being provided under the Transitional Support Order is the "mobile legacy high-cost support" that will transition to 5G Fund support or be subject to a two-year phase down (whichever is applicable). Notwithstanding the schedule adopted in the Transitional Support Order, the Commission will extend transitional support beyond the 24-month period as needed to facilitate the phase down schedule adopted herein and comply with the Consolidated Appropriations Act of 2023. As noted herein, mobile wireless carriers receiving transitional support in areas in Puerto Rico and the U.S. Virgin Islands that are subject to phase down will receive support amounts as specified in section 54.307(e)(5)-(7) of the Commission's rules, 47 CFR 54.307(e)(5)-(7), and will be subject to the same public interest obligations, performance requirements, reporting requirements, and non-compliance mechanisms adopted for mobile legacy high-cost support recipients specified in section 54.322 of the Commission's rules, 47 CFR 54.322.

121. Other than the changes necessary to make its legacy support transition schedule consistent with the language in the Consolidated Appropriations Act of 2023, the Commission makes no other modifications to the decisions adopted in the 5G Fund Report and Order regarding the transition from mobile legacy high-cost support to 5G Fund support. The Commission was clear in the 5G Fund Report and Order that "the continuation of legacy support is an interim measure" as it implemented its plans for the 5G Fund. The Commission therefore declines to accept any of the alternatives to the Commission's long-standing plan to phase down mobile legacy high-cost support suggested by commenters. Those alternative approaches are contrary to the Commission's more than decade-old goal of reforming high-cost support and closing the digital divide, as well as the steps the Commission has taken to ensure the efficiency and good stewardship of its limited universal service fund dollars. As the Commission previously determined in the 5G Fund Report and Order, in an area where the legacy support provider becomes the winning bidder for 5G Fund support, if it "defaults on its bid prior to authorization, or otherwise fails to be authorized, [the Commission] will not award 5G Fund support for that area. However, to avoid perverse incentives, consistent with [the Commission's] decision to maintain support to preserve service only in areas that lack a winning bid, a carrier receiving legacy support in the area of its winning bid will not receive preservation-of-service support and will instead be subject to phase down if not authorized to receive 5G Fund support." As explained by the Commission in 2020, and as addressed herein in the Commission's discussion of the 5G Fund budget, "the Commission's experience awarding support via competitive bidding has shown it to be an effective use of ratepayer funds and none of these commenters has convinced us that departing from that approach is warranted."

122. Consistent with the Commission's decision that the phase down of mobile legacy high-cost support will commence upon the release of a public notice announcing the authorization of 5G Fund support, as well as Congress's language in the Consolidated Appropriations Act of 2023, the Commission dismisses CRWC's Petition for Reconsideration as moot to the extent that its arguments concern the transition schedule for mobile legacy high-cost support. Additionally, for the same reasons expressed herein, the Commission denies the Petition for Reconsideration filed by SBI to the extent that it requests that the Commission reconsider the five-year phase down of mobile legacy high cost support for a carrier receiving the minimum sustainable level of support in an area that is eligible for 5G Fund support, but is not the winning bidder for that area. This request for reconsideration conflicts with the Commission's plan to reform high-cost support and Congress's intention for the Commission to transition to a more modern support mechanism.

VIII. Certification of Notice of 5G Fund Phase I Auction Requirements and Procedures


[top] 123. Consistent with the approach taken in its recent spectrum auctions, the Commission requires any applicant seeking to participate in the 5G Fund Phase I auction to certify, under penalty of perjury, in its short-form application that the applicant has read the public notice adopting procedures for the auction and that it has familiarized itself both with the auction procedures and with the requirements, terms, and conditions associated with the receipt of 5G Fund support. This certification helps ensure that an applicant educates itself about the procedures for auction participation and that, prior to submitting a short-form application, the applicant understands its obligation to stay abreast of relevant, forthcoming information. While this certification page 101383 refers to information regarding auction procedures and the requirements, terms, and conditions associated with the receipt of 5G Fund support that is available at the time of certification, potential auction applicants are on notice from the time the auction procedures are adopted that their educational efforts must continue even after their short-form applications are filed. As with other certifications required in the short-form application, an applicant's failure to make this required certification in its short-form application by the applicable filing deadline will render its application unacceptable for filing, and its application will be dismissed with prejudice.

124. As noted in the 5G Fund FNPRM, the Commission has a longstanding policy that expressly places a burden upon each auction applicant to be thoroughly familiar with the procedures, terms, and conditions contained in the relevant auction procedures public notice and any future public notices that may be released in the auction proceeding. Both the Commission and OEA, in conjunction with WTB and the Media Bureau, have reinforced this policy in recent spectrum auctions by adopting a requirement that each auction participant certify, under penalty of perjury, that it has read the Procedures Public Notice for the applicable auction, and that it has familiarized itself with the auction procedures and with the requirements related to the licenses made available for bidding. In adopting this certification requirement for prior auctions, the Commission noted that it was intended to bolster applicants' efforts to educate themselves to the greatest extent possible about the procedures for auction participation and to ensure that, prior to submitting their short-form applications, applicants understood their obligation to stay abreast of relevant, forthcoming information. The Commission and OEA reasoned in the context of spectrum auctions that familiarity with the Commission's rules and procedures governing the auctions would help bidders avoid the consequences to them associated with defaults, which also cause harm to other applicants and the public by reducing the efficiency of the auction process and reducing the likelihood that the license or construction permit will be assigned to the bidder that values it the most. Moreover, the Commission has also previously expressed in the context of spectrum auctions that the certification requirement will help ensure that an "auction applicant . . . has investigated and evaluated those technical and marketplace factors that may have a bearing on its potential use of any licenses won at auction."

125. All commenters that address this certification requirement support it. The Commission concludes that applicants for universal service support in the 5G Fund Phase I auction will benefit from this certification because, as with spectrum auctions, familiarity with the rules and procedures governing the 5G Fund Phase I auction could help bidders avoid the consequences to them associated with defaults, which in turn harms other applicants and the public by reducing the efficiency of the auction process and potentially stranding areas without 5G mobile service. The Commission further concludes that such a certification will promote the integrity of, and public confidence in, the Commission's auction processes, as well as help ensure that recipients of 5G Fund Phase I support are aware of and better prepared to comply with their public interest obligations and performance requirements. For these reasons, the Commission will require each 5G Fund Phase I auction applicant to make the following certification, under penalty of perjury, in its short-form application:

that the applicant has read the public notice adopting procedures for the 5G Fund Phase I auction, and that it has familiarized itself with those procedures and any requirements, terms, and conditions associated with receipt of 5G Fund support.

IX. Cybersecurity and Supply Chain Risk Management

126. The Commission requires 5G Fund support recipients to implement both an operational cybersecurity risk management plan and a supply chain risk management plan as a condition of receiving 5G Fund support, as discussed in the 5G Fund FNPRM.

127. Cybersecurity Risk Management. Consistent with the Enhanced Alternative-Connect America Cost Model (Enhanced A-CAM) and BEAD programs, 5G Fund support recipients' cybersecurity risk management plans must reflect at least the National Institute of Standards and Technology's (NIST) Framework for Improving Critical Infrastructure Cybersecurity v.1.1 (2018) (NIST Framework), or any successor version of the NIST Framework, and must reflect established cybersecurity best practices that address each of the Core Functions described in the NIST Framework, such as the standards and controls set forth in the Cybersecurity & Infrastructure Security Agency (CISA) Cybersecurity Cross-sector Performance Goals and Objectives (CISA CPGs) or the Center for internet Security Critical Security Controls (CIS Controls). The Commission notes that the BEAD program specifically requires that a recipient's cybersecurity risk management plan reflect the standards and controls set forth in Executive Order 14028. However, the development of standards and controls pursuant to Executive Order 14028 are still ongoing. While the Commission recognizes these continuing efforts elsewhere in the federal government, it will not expressly require that a 5G Fund recipient implement the standards and controls developed pursuant to Executive Order 14028. Once those standards and controls are finalized, however, the Commission will consider them to be established cybersecurity best practices for purposes of the 5G Fund cybersecurity requirements that it adopts herein. The Commission delegates to the Public Safety and Homeland Security Bureau the authority to update these requirements, after notice and comment, to require that 5G Fund recipients' cybersecurity risk management plans reflect NIST Framework v.2.0 (2024) or any other successor versions that may be released.

128. Supply Chain Risk Management. Support recipients' supply chain risk management plans must incorporate the key practices discussed in NISTIR 8276, Key Practices in Cyber Supply Chain Risk Management: Observations from Industry, and related supply chain risk management guidance from NIST 800-161, Cybersecurity Supply Chain Risk Management Practices for Systems and Organizations (2022).


[top] 129. The Commission requires winning bidders to submit their cybersecurity risk management and supply chain risk management plans to USAC, and to certify that they have done so, by a date to be announced by Public Notice or within 30 days after approval under the Paperwork Reduction Act (PRA), whichever is later. Consistent with the penalties adopted for the Enhanced A-CAM program, failure to submit such plans and make the required certification will result in 25% of monthly support being withheld until the recipient comes into compliance. A 5G Fund support recipient may consider its "plans" for addressing cybersecurity and supply chain risks to be separate because they entail different kinds of actions, but they may satisfy this requirement by submitting to USAC a single document that contains both their cybersecurity risk management and supply chain risk management plans. Once the 5G Fund page 101384 support recipient comes into compliance, the Administrator will stop withholding support, and the support recipient will receive all of the support that had been withheld as a result of the recipient's failure to comply with the cybersecurity and supply chain risk management requirements the Commission adopts herein. These requirements will improve the cybersecurity and supply chain risk management of the nation's mobile broadband networks and protect consumers from online risks, such as fraud, theft, and ransomware, that can be mitigated or eliminated through the implementation of widely-accepted security measures.

130. Commenters generally support the requirement that 5G Fund support recipients implement cybersecurity and supply chain risk management plans. Only one commenter, US Cellular, opposes such a requirement on the grounds that it "may place undue burdens and costs on 5G Fund support recipients." Similarly, while generally supporting the requirements, the CCA urges us to "ensure that any such standards, while achieving cybersecurity and risk management goals, avoid imposing onerous or piecemeal burdens on carriers."

131. However, the cybersecurity and supply chain risk management requirements the Commission adopts for 5G Fund support recipients are designed to mitigate concerns that development and implementation of cybersecurity plans are expensive and time consuming. As US Cellular itself explains, the NIST Framework is not a one-size-fits-all approach to cybersecurity and represents a flexible approach that "promotes customization and prioritization, allowing organizations to tailor their approach according to specific needs." Other commenters agree that the NIST Framework provides an appropriate foundation for the required cybersecurity plans. The Commission therefore affords carriers the flexibility to develop plans that fit within their budgetary constraints, so long as they meet the baseline requirements. Moreover, the Commission declines to require 5G Fund support recipients to certify that they have implemented the NIST Framework at a particular implementation tier, as suggested by Verizon, as doing so would reduce flexibility and potentially impose unnecessary costs on providers. For the same reasons, the Commission also declines to adopt the additional requirements recommended by the Puerto Rico Telecommunications Regulatory Bureau.

132. The Commission's approach will also likely reduce compliance costs by allowing 5G Fund support recipients that have already implemented the NIST Framework to comply with this requirement without redoing their plans so long as such plans include already implemented established cybersecurity best practices. To further mitigate costs for small providers, as suggested by commenter Michael Ravnitzky, the Commission encourages 5G Fund support recipients to take advantage of existing federal government resources designed to share supply chain security risk information with trusted communications providers and suppliers and facilitate the creation of cybersecurity and supply-chain risk management plans.

133. In the 5G FNPRM, the Commission proposed to require a 5G Fund recipient's cybersecurity risk management plan to reflect "an established set of best practices, such as the [CISA CPGs] or the [CIS Controls]. Some commenters took issue with this proposal, expressing concerns about a prescriptive mandate that would require the use of either the CISA CPGs or the CISA Controls, without regard to the wider universe of established best practices that are currently available and that may be a better fit for their particular circumstances. The Commission emphasizes that the approach it adopts herein does not require the use of either of these best practices, and is instead intended to afford 5G Fund support recipients the flexibility to implement any established best practices, including those identified in the relevant NIST Framework v. 2.0 Informative References Spreadsheet, so long as they address each of the Core Functions of the NIST Framework, as the CISA CPGs and the CIS Controls do. To that end, the rule that the Commission adopts amends the language proposed in the 5G Fund FNPRM to make clear that, rather than requiring the use of a complete set of best practices compiled by a third party, a 5G Fund recipient may use best practices selected from a variety of sources, so long as they are established and, in aggregate, they address each of the NIST Framework's Core Functions.

134. AT&T is the only commenter that takes issue with the requirement that 5G Fund support recipients' supply chain risk management plans incorporate guidance from NIST 800-161. AT&T notes that NIST 800-161 itself states that it "is not one-size-fits-all" and that "the guidance . . . should be adopted and tailored to the unique size, [resources], and risk circumstances of each enterprise." As with the NIST Framework, the Commission believes that the flexibility provided within NIST 800-161 will benefit 5G Fund support recipients for the very reasons stated by AT&T. The Commission does not view the use of NIST 800-161 as imposing rigid requirements. Instead, it serves as a baseline for ensuring that each 5G Fund support recipient has implemented an effective supply chain risk management plan that is appropriately tailored to its individual needs.

135. Updating Cybersecurity and Supply Chain Risk Management Plans. Consistent with the requirements adopted for both the Enhanced A-CAM and BEAD Programs, the Commission also requires that a 5G Fund support recipient submit an updated plan to USAC within 30 days after making any substantive modification to its cybersecurity or supply chain risk management plan. A modification to a cybersecurity or supply chain risk management plan will be considered as substantive if at least one of the following conditions apply:

• There is a change in the plan's scope, including any addition, removal, or significant alteration to the types of risks covered by the plan ( e.g., expanding a plan to cover new areas, such as supply chain risks to Internet of Things devices or cloud security, could be a substantive change);

• There is a change in the plan's risk mitigation strategies ( e.g., implementing a new encryption protocol or deploying a different firewall architecture);

• There is a shift in organizational structure ( e.g., creating a new information technology department or hiring a Chief Information Security Officer);

• There is a shift in the threat landscape prompting the organization to recognize the emergence of new threats or vulnerabilities that weren't previously accounted for in the plan;

• Updates are made to comply with new cybersecurity regulations, standards, or laws;

• Significant changes are made in the supply chain, including offboarding major suppliers or vendors, or shifts in procurement strategies that may impact the security of the supply chain; or

A large-scale technological change is made, including the adoption of new systems or technologies, migrating to a new information technology infrastructure, or significantly changing the information technology architecture.


[top] 136. US Cellular opposes the requirement that a 5G Fund support recipient submit an updated plan to USAC within 30 days after making any substantive modification to its page 101385 cybersecurity or supply chain risk management plan, stating that requiring the submission of an updated plan within 30 days "may pose challenges in responding swiftly to emerging threats or adopting cutting-edge cybersecurity solutions." The Commission disagrees. To the extent that a 5G Fund support recipient makes a substantive change to its cybersecurity or supply chain risk management plan in response to a specific threat or the adoption of a new cybersecurity solution, the provider is not required to submit its updated plan until well after that change is made. The Commission sees no reason why the need to submit an updated plan after the fact would impact an organization's ability to modify its plan as needed at any given time, particularly given its enumeration herein of the types of modifications that will be considered substantive.

137. NTCA expresses concern that 5G Fund support recipients may be required to submit updated cybersecurity and supply chain risk management plans within 30 days after any substantive modifications to the best practices or standards reflected in those plans ( e.g., within 30 days after any changes are made to the CISA CPGs or the CIS Controls). This is a misreading of the requirement. While the Commission fully expects that 5G Fund support recipients will regularly update their cybersecurity and supply chain risk management plans as best practices evolve, the Commission does not impose a specific timeframe by which those plans must be updated after a best practices publication has been modified.

138. NTCA and RWA both suggest that, rather than requiring the submission of updated plans within 30 days after any substantive modification, 5G Fund support recipients should be required to file updated plans on an annual basis with their annual report. The Commission does not believe that the requirement it adopts will impose substantial burdens on 5G Fund support recipients. To the contrary, because this requirement aligns with the requirements adopted for the Enhanced A-CAM and BEAD programs, the Commission believes that 5G Fund support recipients that also participate in those programs will benefit from having a single deadline by which they must submit their reports for each program. Consistent with requirements for other high-cost support recipients, such as Enhanced A-CAM program participants, 5G Fund support recipients must submit an annual report no later than July 1 of each year after the year in which it was authorized to receive support. Moreover, there is nothing in the record that explains how 5G Fund support recipients differ from Enhanced A-CAM and BEAD program participants with respect to this requirement such that they merit different treatment.

139. Annual Certification. Consistent with the requirements adopted for the Enhanced A-CAM program, the Commission also requires that 5G Fund support recipients certify in their annual report following each support year that they have maintained their plans, whether they have submitted modifications in the prior year, and the date any modifications were submitted. If at any point during the support term a 5G Fund support recipient does not have in place operational cybersecurity and supply chain risk management plans meeting the Commission's requirements, the Commission directs WCB to instruct USAC to withhold 25% of the 5G Fund recipient's support until the recipient comes into compliance. As noted above, once the 5G Fund support recipient comes into compliance, support will no longer be withheld and the support recipient will receive all of the support that had been withheld as a result of its non-compliance with the cybersecurity and supply chain risk management requirements.

140. While the Commission declines to adopt NTCA's proposal to treat 5G Fund support recipients' submitted cybersecurity and supply chain risk management plans as presumptively confidential under section 0.457 of the Commission's rules, 47 CFR 0.457, the Commission recognizes that such plans can contain sensitive information regarding providers' operations and networks. As a result, the Commission will provide an abbreviated means by which 5G Fund support recipients may request confidential treatment of their cybersecurity and supply chain risk management plans pursuant to section 0.459 of its rules, 47 CFR 0.459(a)(4).

141. The Commission concludes that these requirements will serve to facilitate the nation's cybersecurity and supply chain risk management goals while minimizing the burden on 5G Fund support recipients in complying with such requirements. The Commission's actions emphasize the critical importance of cybersecurity and supply chain risk management in modern broadband networks, consistent with broader initiatives across the federal government. The enforcement mechanism carefully balances compliance with this important requirement with avoiding a disproportionate disruption to providers' support. Adopting these risk management requirements is necessary to ensure that the 5G Fund program does not deprive rural consumers in high-cost areas of receiving 5G mobile service that is equally as secure as the high-speed broadband service deployed pursuant to other federal funding initiatives, including through Enhanced A-CAM and BEAD programs.

X. Use of Open Radio Access Network Technologies in 5G Fund Supported Networks

142. The Commission concludes that there are significant public interest benefits to incentivize and to promote the voluntary inclusion of Open Radio Access Network technologies (Open RAN) in networks that are deployed with 5G Fund support by allocating additional funds for this specific purpose. The Commission further concludes that providing a 5G Fund support recipient with a process whereby it can seek additional time to meet the 5G Fund deployment milestones may also further incentivize the inclusion of Open RAN in networks supported through the 5G Fund. As expressed in the 5G Fund FNPRM, the Commission recognizes that this proceeding presents an opportunity for the Commission to assist providers that elect to incorporate Open RAN in their network deployment plans. By providing these additional incentives, the Commission seeks to encourage early adoption of Open RAN that will strengthen and secure the advanced, 5G mobile broadband networks that the 5G Fund is subsidizing.

143. As explained more fully in the Commission's recent Open RAN NOI, rather than relying on proprietary specifications, "Open RAN modularizes the hardware and software components of the traditional RAN to promote virtualization, to enable [artificial intelligence/machine learning] solutions to optimize performance, and to enable interoperability across multiple vendors." The Commission has also noted that networks deploying Open RAN "have the potential to address national security and other concerns that the Commission and other federal stakeholders have raised in recent years about network integrity and supply chain reliability." Commenters in the instant proceeding also have noted that the incorporation of Open RAN technologies within networks serves many public interest benefits including improving security, lessening provider costs, strengthening the domestic supply chain, and promoting competition.


[top] 144. Consistent with record support, the Commission concludes that using page 101386 the 5G Fund to incentivize the voluntary inclusion of Open RAN in networks deployed with 5G Fund support serves its national priorities. Thus, to incentivize deployment of Open RAN, as detailed herein, the Commission offers a process whereby a 5G Fund support recipient can seek a limited extension of its 5G Fund interim and final deployment milestones as set forth in section 54.1015(b) in order to afford it additional time to deploy Open RAN. Additionally, as explained fully herein, the Commission will allocate up to an additional $900 million of support in conjunction with implementation of the 5G Fund solely for the purpose of incentivizing providers to deploy Open RAN. This $900 million will allow us to award a 5G Fund support recipient that deploys Open RAN with additional funding in the amount of one-tenth of the support that it is being allocated through the 5G Fund Phase I auction. To receive this additional funding, support recipients must deploy Open RAN technology through their network(s) for which they are authorized to receive 5G Fund support. The Commission finds that offering these incentives is consistent with the requirement in section 254(b)(1) of the Act, 47 U.S.C. 254(b)(1), that the Commission base its universal service policies on the principles of providing "[q]uality services," and the Commission believes that providing this additional funding will hasten the deployment of fast, secure, flexible, resilient, advanced, 5G mobile broadband networks throughout rural America. The Commission directs OEA and WTB to develop a post-auction process to evaluate applications for the award of this funding in accordance with the parameters that the Commission adopts herein. Additionally, the Commission directs OEA and WTB to adopt provisions to allow a 5G Fund support recipient to seek and receive, if approved by OEA and WTB, an extension of time for its interim and final deployment milestones so that it may include Open RAN in its supported network.

145. As a general policy matter, the federal government has begun to undertake funding efforts that accelerate the development, deployment, and adoption of Open RAN in advanced mobile services. Likewise, the government, together with nine other countries, has recently released a joint statement endorsing principles for secure 6G technology "that recognize the importance of international cooperation in promoting open, secure, resilient, inclusive, interoperable networks, such as Open Radio Access Networks, and safe, resilient, inclusive, and sustainable 6G ecosystem." Incentivizing the inclusion of Open RAN technology in networks subsidized with universal service fund support is therefore consistent with global accord that interoperable networks are of significant importance both currently and in the future.

146. The Commission offers these incentives to 5G Fund support recipients because it anticipates that extending 5G deployment in unserved and underserved areas using Open RAN will be especially beneficial in promoting its 5G Fund goal of ensuring that Americans have access to advanced, 5G mobile broadband services where they live, work, and travel, now and in the long run. Accordingly, currently unserved and underserved areas where 5G Fund support will be used for an Open RAN deployment should be better positioned in the future not to be left behind.

147. In the 5G Fund FNPRM, the Commission sought comment on whether the 5G Fund could be an appropriate vehicle to further the goals outlined in Executive Order 14036, which encouraged the Commission to "consider providing support for the continued development and adoption of 5G Open [RAN] . . . protocols and software," and if so, what the best mechanism(s) for doing so might be. The Commission asked whether deploying Open RAN networks requires more time such that it would be appropriate to provide an extension of the interim and/or final service milestone deadlines to 5G Fund support recipients that use Open RAN in their network deployments. The Commission also asked how a support recipient could demonstrate that it is using Open RAN and how the Commission could monitor compliance.

148. A number of commenters commend the Commission's consideration of using the 5G Fund to incentivize Open RAN and claim that doing so has the potential to increase competition among vendors, decrease reliance on foreign vendors, increase network security, increase innovation, and lower long-term costs. Many commenters agree with the Commission's observation in its Enhanced Competition Incentive Program Further Notice of Proposed Rulemaking that "Open RAN has the potential to allow carriers to promote the security of their networks while driving innovation, in particular in next-generation technologies like 5G, lowering costs, increasing vendor diversity, and enabling more flexible network architecture." Some commenters assert that smaller vendors and rural carriers will need support in order to deploy Open RAN. Mavenir, an equipment manufacturer, suggests that 5G Fund incentives to deploy Open RAN may lessen the barriers to market entry that Open RAN vendors currently face and may encourage closed RAN incumbents to "open" their equipment without additional costs to providers.

149. The Open RAN Policy Coalition suggests that in exchange for "demonstrable commitments" to use 5G Fund support to deploy Open RAN 5G, the Commission offer post-auction incentives for winning bidders, such as additional funding for various phases of the buildout, flexibility in timing for meeting build-out requirements, and also technical assistance, to encourage the deployment of Open RAN in areas receiving 5G Fund support. CTIA agrees with the Open RAN Policy Coalition that voluntary, post-auction incentives such as additional funding may help spur Open RAN deployment.

150. By contrast, other commenters raise practical concerns about using the 5G Fund to support the deployment of Open RAN, contending that Open RAN has not been proven capable of providing 5G service at scale and that more suitable efforts are occurring elsewhere in the government and industry to support its development. And some commenters raise concerns that certain specifications and protocols of Open RAN are still too early in development for a deployment scenario of Open RAN with advanced capabilities ( e.g., Massive multiple-input multiple-output (Massive MIMO)), and that Open RAN may need additional time for interoperability testing and network integration to be completed. The Commission does not persuaded, however, that these concerns should preclude us from using universal service support and the 5G Fund proceeding to encourage the use of Open RAN. To the contrary, the Commission believes that the public interest benefits of incentivizing the use of Open RAN in 5G networks outweigh the concerns and, importantly, will hasten its use more widely in areas of the country where it might not otherwise be deployed.


[top] 151. Recognizing the practical challenges associated with deploying Open RAN raised by commenters, the Commission has given careful consideration to the suggestion of the Open RAN Policy Coalition that it provide post-auction incentives to winning bidders to promote opportunities for Open RAN deployment. The Commission finds that offering additional financial support page 101387 from the 5G Fund to those support recipients that voluntarily incorporate Open RAN into their networks deployed using 5G Fund support in tandem with offering a process to obtain a potential extension of up to one year of the build-out milestone deadlines will best further the Commission's interests in incentivizing the development and deployment of Open RAN and accommodate the various needs of industry in doing so.

152. Additional Funding for Deployment of Open RAN. The Commission will make available this additional high-cost funding exclusively to those 5G Fund support recipients that deploy networks using Open RAN through their network(s) for which they are awarded 5G Fund support. The Commission will award an additional amount of one-tenth of the total support a 5G Fund support recipient is authorized to receive. The inclusion of Open RAN in a network deployed using 5G Fund support will be entirely voluntary, as this additional support is being offered in recognition of the challenges that these service providers may face. Consistent with its goal, as stewards of the Universal Service Fund, of distributing funds in a responsible, and administratively efficient, manner, the Commission requires that this additional funding be used to deploy Open RAN and that 5G Fund support recipients that accept this additional funding certify to that effect.

153. To avoid a significant increase to the contribution factor from any single Open RAN incentive payment, the Commission has determined to disburse support at specified intervals. Likewise, the Commission seeks to ensure that it is able to protect universal service funds in the event that support recipients do not timely deploy Open RAN. Based on its review of the information supporting a request for the additional funding, the Commission will award each authorized support recipient funding related to its Open RAN deployment in three tranches, with the timing of the disbursements to be based on whether a support recipient seeks only the additional funding or both the additional funding and an extension of time to meet the deployment milestones. For 5G Fund support recipients seeking only the additional funding, the Commission will award the support based on the following schedule: (1) one-third of the support upon meeting the Year Three Interim Service Milestone Deadline; (2) one-third upon meeting the Year Four Interim Service Milestone Deadline; and (3) one-third upon meeting the Year Six Final Service Milestone Deadline, at completion of buildout. For support recipients seeking both additional funding and an extension of time of one year, the Commission will award the additional support funding based on the following schedule: (1) one-third upon meeting the Year Four Interim Service Milestone Deadline; (2) one-third upon meeting the Year Five Interim Service Milestone Deadline; and (3) one-third upon completion of buildout at Year Seven. Accordingly, the Commission directs OEA and WTB to establish a process by which this funding may be elected and awarded post-auction.

154. Extension of Deployment Milestones. As noted herein, to ensure that 5G Fund support recipients meet their obligation to provide advanced, 5G mobile broadband service in areas where they receive support, the Commission adopted interim and final service deployment milestones in the 5G Fund Report and Order to monitor progress in timely meeting the 5G Fund public interest obligations and performance requirements. Rather than adopt an Open RAN exception to section 54.1015(b) of the Commission's rules, which requires a support recipient to meet all of its interim and final 5G Fund deployment milestones and deadlines, the Commission will instead grant a one-year extension of the deployment milestones for a 5G Fund support recipient that demonstrates that it will incorporate Open RAN into its network. The Commission finds that providing flexibility to a 5G Fund support recipient by allowing more time to meet its public interest obligations and performance requirements is warranted here to incentivize the development and deployment of Open RAN networks.

155. Those commenters supporting use of the 5G Fund as a vehicle to promote the development of Open RAN also generally support the idea described in the 5G Fund FNPRM of extending the milestone deadlines for a support recipient to meet its public interest obligations and performance requirements for those providers who deploy networks using Open RAN. The Commission believes that this approach addresses the concerns raised by some commenters that aspects of Open RAN make it so that deployment requires additional time. In particular, the Commission agrees with DISH's argument in response to the Commission's 5G FNPRM that ". . . extending buildout requirements for Open RAN deployments [will help] to prevent would-be Open RAN providers from choosing an outdated, closed technology merely to deploy faster." This approach also addresses concerns that incorporating Open RAN in a network deployment could take longer to implement, and that each provider may have different constraints on its ability to deploy Open RAN. The Commission is creating separate processes for seeking additional Open RAN funding and for seeking an extension to accommodate the needs and goals of individual support recipients. Accordingly, the Commission directs OEA and WTB to establish a process for a 5G Fund support recipient that needs additional time to obtain an extension of up to one year of the interim and final milestones as set forth in section 54.1015(b) if it can demonstrate that it will incorporate Open RAN into its network(s).

156. With one exception, all commenters oppose making the deployment of Open RAN mandatory. Given commenters' concerns that the specifications, testing, and standards for using Open RAN advanced technologies are still under development, and given that some of the major carriers are still assessing Open RAN's benefits, the Commission does not believe Open RAN should be mandatory for 5G Fund support recipients. The Commission also recognizes, as AT&T notes, that some providers that have deployed or are currently deploying a greenfield Open RAN network have to consider different capital investment issues than incumbents that are currently integrating 5G networks with 4G LTE networks.


[top] 157. Some commenters propose that auction participants that commit to deploying Open RAN should be given an advantage in bidding. DISH advocates for a 40% bidding credit to auction participants that commit to certain Open RAN deployments, and an additional 10% bidding credit to providers that commit to deploying Open RAN on a faster timeline than the Commission otherwise requires. While the Commission finds that offering a combination of financial and extended milestone buildout deadline incentives will promote its interest in furthering the adoption of Open RAN solutions in networks for advanced, 5G mobile broadband services, given its goal of fiscal responsibility, the Commission finds it inappropriate to adopt a financial incentive as large as the 50% bidding credit that was proposed by DISH. Rather, the Commission concludes that offering a 5G Fund support recipient additional funding in the amount of one-tenth of the total support it is authorized to receive through the 5G Fund Phase I auction, spread over three payments, will sufficiently encourage the deployment page 101388 of Open RAN. This is especially true in light of some commenters assertions that Open RAN may be more cost-effective because it is easier to administer and will discourage bidders from claiming a credit without sufficient due diligence about their ability to deploy Open RAN. In particular, the Commission agrees with DISH `s advocacy that "[d]espite the viability of Open RAN, there are still challenges in the ecosystem-often imposed by RAN incumbents-that can be alleviated by federal funding." The Commission therefore finds that providing up to $900 million in funding to incentivize the deployment of Open RAN technology in networks supported through the 5G Fund, which amounts to an addition of 10% in funding beyond the up to $9 billion that will be allocated through the 5G Fund Phase I auction, strikes the proper balance to financially incentivize 5G Fund support recipients to consider deploying this innovative technology.

158. The Commission directs OEA and WTB to establish, after notice and comment, the minimum specifications for Open RAN that a 5G Fund support recipient must implement in the 5G networks it deploys with 5G Fund support to qualify for additional funds and extended milestone deadlines; the mechanism by which such a recipient must demonstrate compliance (both initial and continued) with such specifications; and other requirements, if any, sufficient to justify additional post-auction funding and/or an extension of up to one year to meet the public interest obligations and/or performance requirements consistent with its goals described herein. Providing further details regarding the showing a 5G Fund support recipient must make in order to be granted additional funding and/or an extension will help ensure that the incentives discussed here are used appropriately to support the Commission's policy objectives. The Commission further directs OEA and WTB to review each request for additional funding and extension to determine, as appropriate, whether such a request should be granted. OEA and WTB shall grant requests for funding only if the recipient's use of Open RAN technology in networks deployed with 5G support meets the Open RAN specifications that will be adopted by OEA and WTB and the recipient certifies its conformance with those specifications. Likewise, OEA and WTB shall grant an extension of up to one year only if they determine that the 5G Fund support recipient's proposal to deploy Open RAN is reasonably capable of meeting the prescribed minimum specifications. Reasonably capable means meeting the Commission staff's reasonable expectation that the applicant would be able to meet the relevant Open RAN specifications in the areas where the applicant won support. To be clear, these determinations will be made on a case-by-case basis, measured against standards developed by OEA and WTB, taking each recipient's circumstances into account. The Commission further directs OEA and WTB to adopt, after notice and comment, measures to ensure that it can appropriately address an Open RAN support recipient's non-compliance with its commitment to timely deploy a network consistent with the established Open RAN specifications. In particular, OEA and WTB shall address whether recipients should be required to increase the amount of the letter of credit required by section 54.1016 of the Commission's rules, 47 CFR 54.1016, by the amount of the Open RAN support, be subject to a modified timeline before it can begin to decrease the amount of its letter of credit, and be subject to recovery of all distributed support for non-compliance with 5G Fund Open RAN obligations.

159. The Commission's approach factors in the time that it anticipates is needed for the finalization of Open RAN specifications and also allows more time for industry to better address the challenges associated with interoperability and the RAN integration testing. The decision to deploy Open RAN in a network deployed with 5G Fund Phase I support is and will remain entirely optional. Potential bidders need not decide whether to deploy Open RAN or whether to seek the additional funding for Open RAN and/or an extension until after they know where they have been awarded 5G Fund support as well as the showing that will be required to receive the additional funding and/or extension of time.

XI. Promoting Digital Equity and Inclusion

160. The Commission sought comment on how the proposals and issues discussed in the 5G Fund FNPRM may promote or inhibit advances in diversity, equity, inclusion, and accessibility, as well the scope of the Commission's relevant legal authority to address any such issues. Although the Commission received a few generalized comments regarding how the Commission's decisions could impact such issues, no commenter offered any proposals for specific program requirements that the Commission should adopt for the 5G Fund or any comments regarding its legal authority to address diversity, equity, inclusion, and accessibility in this proceeding. The Commission therefore lacks a record to adopt any specific requirements for the 5G Fund.

161. For similar reasons, the Commission also denies the Petition for Reconsideration filed by the 5G Fund Supporters to the extent it seeks reconsideration of the Commission's decision declining to extend the cable procurement rule requirements to 5G Fund support recipients, which the 5G Fund Supporters contend will ensure that qualified minority and women entrepreneurs receive information about upcoming infrastructure buildout contracts. As the Commission has previously noted, "the cable procurement requirement and [the Commission rule implementing it] flow directly from the statutory mandate pertaining explicitly to the cable industry contained in the 1992 Cable Act." Moreover, although the Commission has sought comment on whether this type of procurement requirement could be applied to the broadcast or other FCC-regulated industries, it has not to date extended the cable procurement rule to any other FCC-regulated industries. Notably, no commenter offered support for adopting this type of procurement requirement for the 5G Fund in response to the Commission's public notice seeking comment on the 5G Fund Supporters' Petition for Reconsideration. Nor did any commenter, including the 5G Fund Supporters, provide any additional information to support adopting this type of procurement requirement for the 5G Fund in response to the 5G Fund FNPRM. Accordingly, the Commission declines to extend the cable procurement rule requirements to 5G Fund support recipients.


[top] 162. As the Commission implements and administers the 5G Fund, however, it remains mindful of the importance of considering how the Commission can promote diversity, equity, inclusion, and accessibility and the impact its rules have on these issues. The Commission emphasizes that one of the general principles of the Universal Service Fund is to create equal access for every American to high-speed broadband in underserved and unserved areas. To that end, the Commission has long used its Universal Service high-cost funding programs to further consumer access to broadband and bridge the digital divide. Most recently, in its Future of USF Report, the Commission adopted universal service goals for broadband-universal deployment, affordability, adoption, page 101389 availability, and equitable access to broadband throughout the United States. Accordingly, the Commission is committed to ensuring that the policies and rules the Commission has adopted for the 5G Fund remain in accord with the Commission's general efforts to advance digital equity for all.

XII. CTIA Petition for Partial Reconsideration of the 5G Fund Report and Order

163. The Commission agrees with CTIA that resolving its pending Petition for Partial Reconsideration of the Commission's 5G Fund Report and Order serves the public interest, and is consistent with the Commission's intention to finalize the framework of the 5G Fund. To that end, the Commission grants in part and denies in part CTIA's petition to update the enforcement provisions associated with the award of mobile legacy high-cost support.

164. In the 5G Fund Report and Order, the Commission adopted non-compliance measures for mobile legacy high-cost support recipients that fail to comply with any of the public interest obligations and/or performance requirements. See 47 CFR 54.322(k). These public interest obligations include, among other things, a requirement that a mobile legacy high-cost support recipient use an increasing percentage of its support for the deployment, maintenance, and operation of mobile networks that provide 5G service. See 47 CFR 54.322(c). In particular, the Commission concluded in the 5G Fund Report and Order that a non-compliant mobile legacy high-cost support recipient (1) "will receive no further support disbursements"; (2) "may be subject to recovery of up to the amount of support received since the effective date of the Report and Order, FCC 20-150, that was not used for the deployment, maintenance, and operation of mobile networks that provide 5G service"; and (3) "may be subject to further action, including the Commission's existing enforcement procedures and penalties, potential revocation of ETC designation, and suspension or debarment pursuant to [section] 54.8." To address concerns about the possibility of disproportionate recovery, the Commission limited the amount of mobile legacy high-cost support that would be subject to recovery by indicating that it would not seek to recover any support that a recipient actually spent on the deployment, operation, and/or maintenance of voice and broadband networks that support 5G service, that it would retain the discretion to determine whether to seek up to full recovery of all support that was not spent on the deployment, operation, and/or maintenance of 5G services, and that it would seek to recover only support received since the effective date of the public interest obligations and performance requirements. The Commission also noted that it may apply this recovery measure in cases of voluntary relinquishment of legacy support.

165. CTIA takes issue with these non-compliance measures, contending that the Commission adopted an unreasonable and unprecedented penalty for those mobile legacy support recipients that do not meet the public interest obligations and performance requirements adopted in the 5G Fund Report and Order. Specifically, CTIA seeks to limit the recovery of support for non-compliance or voluntary relinquishment of support to the difference between the amount spent on 5G and the amount that the Commission's rules require mobile legacy high-cost support recipients to spend on 5G. CTIA argues that it is inequitable for the Commission to recover all previous legacy support that a mobile legacy support recipient did not spend directly on 5G services during the transition to the 5G Fund, even though the Commission allowed mobile legacy support recipients to spend less than 100% of their support on 5G services in the first two years of the transition. Moreover, CTIA asserts that the new rules unreasonably treat the voluntary relinquishment of future support as a "default" and subject to recovery all previous support that was not spent on 5G, even if the prior non-5G spending complied with the requirements adopted by the Commission. CTIA contends that the Commission should revise its rules to make clear that a mobile legacy support recipient that fails to meet the new 5G-related obligations will be subject to recovery only for the portion of past support that the Commission required the ETC to spend on 5G. In addition, CTIA advocates that in no event should the rules allow recovery of previously spent support where the mobile legacy support recipient's only "default" is electing voluntarily to relinquish prospective support.

166. The Commission responds to CTIA's concerns, in part, by amending section 54.322(k)(2) of its rules, 47 CFR 54.322(k)(2), governing the recovery of mobile legacy high-cost support from non-compliant recipients. In particular, the Commission clarifies that a non-compliant mobile legacy high-cost support recipient will-not may-be subject to the recovery of the difference between the amount the recipient spent on 5G service and the amount that section 54.322(c) of its rules, 47 CFR 54.322(c), required the recipient to spend on 5G service. This clarification grants CTIA's request that the Commission "makes clear that mobile wireless ETCs who fail to meet the new 5G-related obligations will be subject to recovery . . . for the portion of past support that the Commission required the ETC to spend on 5G." The Commission's rules conditioned the continued distribution of mobile legacy high-cost support on the satisfaction of public interest obligations, including the use of an increasing percentage of its support for the deployment, maintenance, and operation of mobile networks that provide 5G service, and required the recovery of funds where the percentage scheme envisioned by the rule is not satisfied. CTIA's argument that the rule operates as an arbitrary penalty is unavailing in the context of the 5G Fund, which created a complex regulatory framework with specific conditions governing receipt of USF support. The Commission's action herein is wholly consistent with its obligation to recover federal funds where the associated regulatory requirements are not satisfied. Furthermore, this clarification is generally consistent with other universal service high-cost rules, which require a recipient to repay support for locations where it failed to meet its build-out milestones.


[top] 167. The Commission's authority to recover such support remains essential and relevant as the Commission moves forward with the implementation of the 5G Fund. In adopting the rule that allows the Commission to cease making legacy support payments and pursue the recovery of support that has been awarded but not used for 5G service, the Commission reasoned that "the continuation of legacy support is an interim mechanism in place as [the Commission] implement[s] the 5G Fund, and therefore, unlike the Commission's other modernized support mechanisms, the non-compliance measures here do not benefit from allowing legacy support recipients to come back into compliance prior to the end of the support term." In sum, by providing authority to recover up to all legacy support a carrier received that was not spent toward the deployment, operation, and/or maintenance of 5G service, the Commission reasoned that it "better incentivize[d] 5G deployment." The Commission agrees with this reasoning. page 101390 The Commission also expands on the Commission's conclusion in the 5G Fund Report and Order that having strong public interest obligations and performance requirements for mobile legacy high-cost support recipients and the ability to enforce its rules in the event of a default, such as by recovering legacy support that was not spent on 5G services, is part of its obligation "[a]s stewards of the Universal Service Fund," and that such provisions will help us "ensure that all Americans living in areas served by these carriers receive the most advanced wireless services."

168. The Commission does, however, find merit in CTIA's argument that section 54.322(k)(2) should be revised because it includes the voluntary relinquishment of future support as a "default," even if a carrier's prior spending complied with the requirements adopted by the Commission. The Commission agrees with CTIA that revising this limited aspect of the rule avoids creating an incentive for a carrier to continue to accept mobile legacy high-cost support if it otherwise wishes to voluntarily relinquish that support. Accordingly, the Commission grants this aspect of CTIA's Petition for Reconsideration and amends section 54.322(k)(3) of its rules, 47 CFR 54.322(k)(3), to clarify that, to the extent a carrier receiving mobile legacy high-cost support has been in full compliance with the Commission's rules and subsequently elects to voluntarily relinquish future support, the Commission will not deem the voluntary relinquishment of such future mobile legacy high-cost support alone to be a default for which the Commission will seek the recovery of prior support. However, for the reason discussed herein, the Commission denies CTIA's Petition to the extent that it seeks to amend section 54.322(k)(2) to preclude the recovery of legacy support that a mobile legacy high-cost support recipient received-other than the amount specified in section 54.322(c)-that was not spent toward the deployment, operation, and/or maintenance of mobile networks that support 5G service.

XIII. Non-Substantive Rule Clarifications

169. The Commission also takes this opportunity to make non-substantive editorial changes to the rules adopted by the Commission in the 5G Fund Report and Order governing the annual reporting requirement for mobile legacy high-cost support recipients. While the majority of the elements of this annual reporting requirement are contained in section 54.322(i) of the Commission's rules, 47 CFR 54.322(i), which relates specifically to mobile legacy high-cost support recipients, other elements of this requirement are separately contained in section 54.313 of the Commission's rules, 47 CFR 54.313, which relates to annual reporting requirements for high-cost recipients generally. The Commission therefore consolidates the requirements contained in section 54.313(n), as adopted in the 5G Fund Report and Order, into section 54.322(i), to enhance clarity and make it easier for mobile legacy high-cost support recipients to locate all of the elements of their annual reporting requirement. The Commission notes that paragraph reference for this rule as adopted in the 5G Fund Report and Order was incorrectly listed as section 54.313(n), rather than section 54.313(p), in the both the final rules appendix in the 5G Fund Report and Order and in the Federal Register summary of that decision published at 85 FR 75,770 on November 25, 2020. Section 54.313(n), as adopted in the 5G Fund Report and Order, has a delayed effective date and has not yet been made effective. See 47 CFR 54.313, Effective Date Notes, Note 4. No substantive change is intended or should result from this consolidation. Because these editorial changes are non-substantive, they have no impact on regulated parties or the public, and the Commission finds for good cause that notice and comment are unnecessary pursuant to 5 U.S.C. 553(b)(B).

XIV. Procedural Matters

170. Paperwork Reduction Act. The 5G Fund Second Report and Order and Order on Reconsideration contains new or modified information collection requirements subject to the Paperwork Reduction Act of 1995 (PRA), Public Law 104-13. It will be submitted to the Office of Management and Budget (OMB) for review under section 3507(d) of the PRA. OMB, the general public, and other Federal agencies will be invited to comment on the new or modified information collection requirements adopted in this proceeding. In addition, the Commission notes that pursuant to the Small Business Paperwork Relief Act of 2002, it previously sought specific comment on how the Commission might further reduce the information collection burden for small business concerns with fewer than 25 employees. The Commission describes impacts that might affect small businesses, which includes most businesses with fewer than 25 employees, in the Supplemental Final Regulatory Flexibility Analysis (Supplemental FRFA) herein.

171. Congressional Review Act. The Commission has determined, and the Administrator of the Office of Information and Regulatory Affairs, Office of Management and Budget, concurs that this rule is "non-major" under the Congressional Review Act, 5 U.S.C. 804(2). The Commission will send a copy of the 5G Fund Second Report and Order and Order on Reconsideration to Congress and the Government Accountability Office pursuant to 5 U.S.C. 801(a)(1)(A).

172. Regulatory Flexibility Act. As required by the Regulatory Flexibility Act of 1980, as amended (RFA), a Supplemental Initial Regulatory Flexibility Analysis (Supplemental IRFA) was incorporated in the 5G Fund FNPRM. The Commission prepared Regulatory Flexibility Analyses in connection with its 2020 5G Fund NPRM, 85 FR 31616 (May 26, 2020), and its 2020 5G Fund Report and Order. The Commission sought written public comment on the proposals and issues raised in the 5G Fund NPRM, and the 5G FNPRM, including comment on the IRFA, and Supplemental IRFA. No comments were filed addressing the IRFAs. This Supplemental FRFA supplements the Final Regulatory Flexibility Analysis (FRFA) in the 5G Fund Report and Order to reflect actions taken in the 5G Fund FNPRM, and conforms to the RFA.


[top] 173. The Commission takes important and necessary steps in the 5G Fund Second Report and Order and Order on Reconsideration to implement the framework for the 5G Fund to support the build out of advanced, 5G mobile wireless broadband networks for those who live, work, and travel in rural areas. After over a decade of hard work to reach this pivotal moment, the 5G Fund reflects the Commission's persistent efforts to reform and redirect universal service funds for mobile broadband to areas of the country that need them the most. As the Commission finalizes the details for the 5G Fund, it is confident that its conclusions in the 5G Fund Second Report and Order and Order on Reconsideration are solidly grounded in the improved mobile coverage data obtained in the Broadband Data Collection (BDC), which is reflected on its new National Broadband Map and provides the Commission with the most comprehensive picture to date about where mobile broadband service is and is not across the entire country. Unquestionably, the Commission's decision to wait to proceed with a 5G Fund Phase I auction until the Commission had these data to rely on has dramatically improved its understanding of where high-speed page 101391 mobile broadband service is being provided and has significantly enhanced its ability to hold a successful 5G Fund auction. The Commission is now far better informed regarding which communities lack mobile broadband service.

174. As the Commission noted when it adopted the 5G Fund FNPRM, the National Broadband Map reflected the stark reality that over 14 million homes and businesses nationwide continued to lack access to 5G mobile wireless broadband service. The Commission therefore undertook a tailored effort to refresh the record and reignite the 5G Fund's plan to expand the deployment of 5G service to those rural communities that remain trapped on the wrong side of the digital divide. After careful consideration of the record gathered in this proceeding, the Commission concludes that the determinations it reaches in the 5G Fund Second Report and Order and Order on Reconsideration will best incentivize the deployment of networks providing advanced, 5G mobile wireless broadband in areas of the country where, absent subsidies, such service will continue to be lacking.

175. Specifically, in the 5G Fund Second Report and Order and Order on Reconsideration the Commission: (1) modifies the definition of the areas that will be eligible for 5G Fund support and include areas in Puerto Rico and the U.S. Virgin Islands that meet this eligible area definition in the 5G Fund Phase I auction; (2) increases the budget for Phase I of the 5G Fund and the Tribal reserve budget; (3) modifies the metric for accepting and identifying winning bids and adopt a service-based weighting factor for bidding in the 5G Fund Phase I auction; (4) explains how the Commission will aggregate areas eligible for 5G Fund support to minimum geographic areas for bidding; (5) explains its approach to aligning the methodologies for demonstrating compliance with the 5G Fund public interest obligations and performance requirements with those used in the BDC; (6) revises the schedule for transitioning from mobile legacy high-cost support for 5G Fund support consistent with recent legislative amendments; (7) requires each 5G Fund Phase I auction applicant to certify, under penalty of perjury, that it has read the public notice adopting procedures for the auction, and that it has familiarized itself with those procedures and any requirements related to the support made available for bidding in the auction; (8) requires 5G Fund support recipients to implement cybersecurity and supply chain risk management plans as a condition of receiving support; and (9) encourages 5G Fund support recipients to incorporate Open Radio Access Network (Open RAN) technologies in networks funded through the 5G Fund through the use of incentive funding and an opportunity to seek additional time to meet their 5G Fund public interest obligations and performance requirements by the established service deployment milestones. The Commission also resolves the issues raised in the pending petitions for reconsideration of the Commission's 2020 5G Fund Report and Order. With the decisions the Commissions reaches in the 5G Fund Second Report and Order and Order on Reconsideration, it advances its extensive efforts to modernize high-cost support for mobile broadband services and proceeds with confidence that it is stretching its limited universal service fund dollars to support advanced, 5G mobile wireless broadband service to as many areas where Americans live, work and travel as possible.

176. There were no comments filed that specifically addressed the rules and policies presented in the Supplemental IRFA.

177. Pursuant to the Small Business Jobs Act of 2010, which amended the RFA, the Commission is required to respond to any comments filed by the Chief Counsel for Advocacy of the Small Business Administration (SBA), and to provide a detailed statement of any change made to the proposed rule(s) as a result of those comments. The Chief Counsel did not file any comments in response to the proposed rules in this proceeding.

178. The RFA directs agencies to provide a description of, and where feasible, an estimate of the number of small entities that may be affected by the rules adopted herein. The RFA generally defines the term "small entity" as having the same meaning as the terms "small business," "small organization," and "small governmental jurisdiction." In addition, the term "small business" has the same meaning as the term "small-business concern" under the Small Business Act. A "small-business concern" is one which: (1) is independently owned and operated; (2) is not dominant in its field of operation; and (3) satisfies any additional criteria established by the SBA. As noted herein, Regulatory Flexibility Analyses were incorporated into the 5G Fund NPRM, the 5G Fund Report and Order, and the 5G Fund FNPRM. In those analyses, the Commission described in detail the small entities that might be significantly affected. In this Supplemental FRFA, the Commission incorporates by reference the descriptions and estimates of the number of small entities from the previous Regulatory Flexibility Analyses in the 5G Fund NPRM, the 5G Fund Report and Order, and the 5G Fund FNPRM.

179. The 5G Fund Second Report and Order and Order on Reconsideration modifies some of the compliance requirements adopted in the 5G Report and Order based on the proposals and/or the other issues on which the Commission sought comment in the 5G Fund FNPRM. Such modifications could impact the reporting, recordkeeping, and other compliance requirements for small and other providers that receive 5G Fund support.

180. In the 5G Fund Second Report and Order and Order on Reconsideration, the Commission modifies the methodologies by which 5G Fund support recipients must demonstrate compliance with their 5G Fund performance requirements to largely align with those adopted for the BDC verification process. At present, the record contains insufficient information to either quantify compliance costs for small entities as a result of the modified methodologies for 5G Fund support recipients, or determine whether there will be a need for small entities to hire attorneys, engineers, consultants, or other professionals. However, the Commission notes that its approach in largely aligning the methodologies for 5G Fund support recipients to demonstrate and report compliance with the 5G Fund performance requirements is likely to ease the burden on small and other 5G Fund support recipients, and afford such support recipients the same flexibilities afforded under the BDC rules to choose which type of verification data to submit.


[top] 181. The 5G Fund Second Report and Order and Order on Reconsideration also adopts a requirement that each 5G Fund support recipient implement cybersecurity and supply chain risk management plans as a condition of receiving 5G Fund support. Cybersecurity risk management plans must reflect at least the National Institute of Standards and Technology's Framework for Improving Critical Infrastructure Cybersecurity v.1.1 (2018) (NIST Framework), or any successor version of the NIST Framework, and must reflect established cybersecurity best practices that address each of the Core Functions described in the NIST Framework, such as the standards and controls set forth in the Cybersecurity & Infrastructure Security Agency (CISA) Cybersecurity Cross-sector Performance page 101392 Goals and Objectives (CISA CPGs) or the Center for internet Security Critical Security Controls (CIS Controls). Support recipients' supply chain risk management plans must incorporate the key practices discussed in NISTIR 8276, Key Practices in Cyber Supply Chain Risk Management: Observations from Industry, and related supply chain risk management guidance from NIST 800-161. The Commission also requires that a 5G Fund support recipient submit an updated plan to USAC within 30 days after making any substantive modification to its cybersecurity or supply chain risk management plan. 5G Fund support recipients must also certify in their annual report following each subsequent support year that they have maintained their plans, whether they have submitted modifications in the prior year, and the date any modifications were submitted. If at any point during the support term a 5G Fund support recipient does not have in place operational cybersecurity and supply chain risk management plans meeting the Commission's requirements, 25% of the 5G Fund recipient's support will be withheld until the recipient comes into compliance. There were no comments that specifically addressed this modification as presented in the Supplemental IRFA. In addition, the record does not include a detailed cost-benefit analysis that would enable us to quantify compliance costs for small entities, including whether there will be a need for small entities to hire attorneys, engineers, consultants, or other professionals. The Commission notes, however, that the cybersecurity and supply chain risk management requirements adopted for 5G Fund support recipients in the 5G Fund Second Report and Order and Order on Reconsideration are designed to mitigate concerns that development and implementation of cybersecurity plans are expensive and time consuming. The requirements therefore afford small and other carriers the flexibility to develop plans that fit within their budgetary constraints, so long as they meet the baseline requirements. The Commission's approach will also likely reduce compliance costs by allowing 5G Fund support recipients that have already implemented the NIST Framework to comply with this requirement without redoing their plans so long as they implement an established set of cybersecurity best practices. To further mitigate costs for small carriers, the Commission also encourages 5G Fund support recipients to take advantage of existing federal government resources designed to share supply chain security risk information with trusted communications providers and suppliers and facilitate the creation of cybersecurity and supply-chain risk management plans.

182. In addition, the Commission adopts a requirement that any applicant seeking to participate in the 5G Fund Phase I auction to certify in its short-form application, under penalty of perjury, that the applicant has read the public notice adopting procedures for the auction and that it has familiarized itself both with the auction procedures and with the requirements, terms, and conditions associated with the receipt of 5G Fund support. As with other certifications required in the short-form application, an applicant's failure to make this required certification in its short-form application by the applicable filing deadline will render its application unacceptable for filing, and its application will be dismissed with prejudice. Typically, the auction procedures inform prospective applicants that they should familiarize themselves with the Commission's general competitive bidding rules, Commission decisions regarding competitive bidding procedures, application requirements, obligations of universal service support recipients, and the Commission's service rules support granted in the auction, and that they must be thoroughly familiar with the procedures, terms, and conditions contained in the public notice adopting procedures for the auction. The Commission therefore does not expect that the adopted certification requirement will increase the need for small entities to hire attorneys, engineers, consultants, or other professionals because it does not increase the level of education or due diligence beyond what was required of applicants prior to the adoption of the certification requirement, and thus it should not increase an applicant's burden in complying with the additional certification requirement.

183. The RFA requires an agency to provide "a description of the steps the agency has taken to minimize the significant economic impact on small entities . . . including a statement of the factual, policy, and legal reasons for selecting the alternative adopted in the final rule and why each one of the other significant alternatives to the rule considered by the agency which affect the impact on small entities was rejected." In the 5G Fund Second Report and Order and Order on Reconsideration, the Commission adopted rules seeking to balance its proposals in the 5G Fund FNPRM with proposed alternatives commenters submitted and weighing their benefits against the potential costs to small and other entities. Some key areas of focus addressed in the adopted rules are:

184. Definition of Eligible Areas. The 5G Fund Second Report and Order and Order on Reconsideration modifies the definition of the areas that will be eligible for 5G Fund Phase I support to be those areas where BDC mobile coverage data show a lack of unsubsidized 5G mobile broadband service at speeds of at least 7/1 Mbps in an outdoor stationary environment by at least one service provider, even if those areas are served by 4G LTE service. The Commission will also apply a service-based weighting factor in 5G Fund Phase I auction bidding to incentivize the deployment of 5G service in areas that lack unsubsidized 4G LTE service. The Commission considered retaining the eligible areas definition adopted in the 5G Fund Report and Order, however, it believes that this modification to the definition of areas eligible for 5G Fund support ensures that a wide variety of small entities and other interested bidders will have greater flexibility to design a network that matches their business model and that allows service providers to achieve their performance benchmarks and public interest obligations efficiently.

185. Technology for Determining Eligible Areas. The Commission considered, as an alternative to defining areas eligible for 5G Fund Phase I support as those where BDC mobile coverage data show a lack of unsubsidized 5G service by at least one service provider, retaining the definition of eligible areas as those areas that lack both unsubsidized 4G LTE and unsubsidized 5G broadband service, as adopted in the 5G Fund Report and Order. As the Commission noted in the 5G Fund FNPRM, however, throughout this proceeding, several parties have taken issue with the eligible areas definition, and have advocated that the Commission define as eligible for 5G Fund support any areas that lack unsubsidized 5G mobile broadband service. The Commission expects that small entities and other interested parties will benefit from its modification of the definition of eligible areas because it is likely to increase the total number of areas that are available in a 5G Fund auction and eligible for 5G Fund support, thus creating additional opportunities for them to expand their businesses.


[top] 186. Speed Thresholds for Determining Eligible Areas. Another alternative the Commission considered was a defining the areas eligible for 5G page 101393 Fund support as those areas that lack unsubsidized 5G service at a speed threshold of 35/3 Mbps. The Commission concludes that using a speed threshold of 7/1 Mbps for 5G for purposes of determining eligible areas will promote the expansion of 5G coverage to as many areas as possible, while also avoiding the potential for overbuilding in areas where a provider already offers some level of unsubsidized 5G service and could upgrade such service to higher speeds in the future. The Commission further determines that using a speed threshold of 35/3 Mbps to determine eligible areas will result in more areas being eligible for support, taxing the 5G Fund Phase I budget unnecessarily, especially in light of the increased number of eligible areas that the Commission anticipates as a result of its other modifications to the definition. Increasing the number of eligible areas to such a great extent will likely reduce the support that may be available to winning bidders. The Commission believes that defining areas eligible for 5G Fund support as those that lack unsubsidized 5G service at speeds of at least 7/1 Mbps strikes an appropriate balance of increasing the number of areas eligible for support without overly taxing the budget.

187. Environment for Determining Eligible Areas. The Commission also considered defining the areas eligible for 5G Fund Phase I support as those areas that lack unsubsidized 5G mobile broadband service at speeds of at least 7/1 Mbps in an in-vehicle environment. The Commission concludes that using coverage maps based on an outdoor stationary environment for purposes of determining areas eligible for the 5G Fund Phase I auction is preferable to using in-vehicle BDC coverage maps because the key parameters for outdoor stationary coverage have been standardized.

188. 5G Fund Budget. In the 5G Fund Second Report and Order and Order on Reconsideration, the Commission modified the budget for Phase I of the 5G Fund auction by increasing it to include up to the $1 billion that previously had been allocated to Phase II by the Commission in the 5G Fund Report and Order and Order on Reconsideration. A number of commenters, some of which include small entities, advocated for an increase in the original budget of $8 billion for Phase I. The Commission concludes that adopting an increased budget for Phase I will benefit all 5G Fund recipients, including those that are small entities. The Commission declines to adopt an alternative approach that would use a cost model to determine the 5G Fund budget, as such an approach would conflict with its interest in awarding support in eligible areas in amounts that are competitive, but still acceptable to providers.

189. Bidding and Support Price Metric. In addition, the 5G Fund Second Report and Order and Order on Reconsideration adopts a bidding and support price metric of dollars per square kilometer that includes a service-based weighting factor that weights bids and support prices based on upon service availability within the area. This service-based weighting factor will distinguish between areas that lack unsubsidized 5G broadband service but have access to unsubsidized 4G LTE service, and areas that lack both 5G and 4G LTE service. The Commission adopts this approach as an alternative to the adjustment factor that was adopted in the 5G Fund Report and Order for bidding.

190. Certification of Notice of 5G Fund Phase I Auction Requirements and Procedures. With respect to the requirement that any applicant seeking to participate in the 5G Fund Phase I auction must certify in its short-form application, under penalty of perjury, that the applicant has read the public notice adopting procedures for the auction and that it has familiarized itself both with the auction procedures and with the requirements, terms, and conditions associated with the receipt of 5G Fund support, the Commission has a longstanding policy that expressly places a burden upon each auction applicant to be thoroughly familiar with the procedures, terms, and conditions contained in the relevant auctions procedures public notice and any future public notices that may be released in the auction proceeding. However, the Commission has taken steps to minimize any economic impact of the certification requirement on small entities through the many free resources it provides to potential auction participants. The public notice adopting the procedures for each auction will be posted to the auction's website prior to the opening of the application window, and other relevant orders are available through EDOCS, the Commission's online document database ( www.fcc.gov/edocs ). The Commission believes that reading these materials will be sufficient for applicants to certify that they have familiarized themselves with the relevant auction procedures and other requirements. The Commission also makes available additional educational materials to help potential auction participants understand the auction process, including short-form filing instructions and a tutorial. Further, the Commission makes this information publicly available, easily accessible, and without charge to benefit all potential auction applicants, including small entities, thereby lowering their administrative costs to comply with the Commission's competitive bidding rules.

191. Small entities participating in auctions may also seek clarification of, or guidance regarding, auction procedures, the competitive bidding rules, and any requirements related to the authorizations or support to be made available through the auction from Commission staff prior to each auction's application window. Additionally, an FCC Auctions Hotline provides small entities one-on-one access to Commission staff for information about the auction process and procedures. The FCC Auctions Technical Support Hotline is another resource that provides technical assistance to applicants, including small entities, on issues such as access to or navigation within the electronic short-form application and use of the bidding system.


[top] 192. Cybersecurity and Supply Chain Risk Management. The Commission also considered, as an alternative approach to the requirement that 5G Fund support recipients submit updated plans within 30 days of making any substantive modifications to those plans, a requirement that plans be updated on an annual basis. The Commission does not believe that the requirement it adopts will impose substantial burdens on 5G Fund support recipients. To the contrary, because this requirement aligns with the requirements adopted other support programs, the Commission believes that small entity 5G Fund support recipients that also participate in those programs will benefit from having a single deadline by which they must submit their reports for each program. In general, the cybersecurity and supply chain risk management requirements the Commission adopted for 5G Fund support recipients are designed to mitigate concerns that development and implementation of cybersecurity plans are expensive and time consuming. The NIST Framework is not a one-size-fits-all approach to cybersecurity and represents a flexible approach that promotes customization and prioritization, allowing organizations to tailor their approach according to specific needs. The Commission therefore affords small and other carriers the flexibility to develop plans that fit within their budgetary constraints, so long as they meet the baseline requirements. page 101394

193. Use of Open Radio Access Network Technologies in 5G Fund Supported Networks. To promote and incentivize the voluntary inclusion of Open Radio Access Network (Open RAN) technology networks deployed using 5G Fund support, the Commission offers a process whereby a 5G Fund support recipient can seek a limited extension of its 5G Fund interim and final deployment milestones as set forth in section 54.1015(b) of the Commission's rules in order to afford it additional time to deploy Open RAN. Additionally, the Commission allocates up to an additional $900 million of support in conjunction with implementation of the 5G Fund solely for the purpose of incentivizing providers to deploy Open RAN. Specifically, the Commission will allow a winning bidder that is authorized to receive 5G Fund support to apply for additional funding of one-tenth of the total support that the 5G Fund support recipient is authorized to receive to be spent on the deployment of Open RAN, to be awarded in a post-auction process. To receive this additional funding, support recipients must deploy Open RAN technology through their network(s) for which they are authorized to receive 5G Fund support. The Commission directs OEA and WTB to establish a process by which this additional funding may be elected and awarded post-auction in accordance with the parameters set forth in the 5G Fund Second Report and Order and Order on Reconsideration. Additionally, the Commission directs OEA and WTB to establish a process for a 5G Fund support recipient that needs additional time to obtain an extension of up to one year of the interim and final deployment milestones as set forth in section 54.1015(b) of the Commission's rules if it can demonstrate that it will incorporate Open RAN into its network(s). Alternatives approaches that the Commission considered in determining how best to encourage the use of Open RAN technologies included granting bidding credits to 5G Fund Phase I applicants that agree to use Open RAN technologies in their deployments as well as mandating the use of such technologies in deployments built with 5G Fund support. The Commission concluded that the adopted approach will allow time for the Open RAN specifications to become more settled for the case of a deployment scenario with Open RAN advanced capabilities and also for industry to better address the challenges associated with interoperability and the RAN integration testing. This approach could benefit small providers, many of which have limited resources, by allowing them the flexibility to choose an option that may provide an extension of compliance deadlines.

194. The Commission will send a copy of the 5G Fund Second Report and Order and Order on Reconsideration, including this Supplemental FRFA, in a report to Congress. In addition, the Commission will send a copy of the 5G Fund Second Report and Order and Order on Reconsideration, including this Supplemental FRFA, to the Chief Counsel for Advocacy of the Small Business Administration.

XVI. Ordering Clauses

195. Accordingly, it is ordered that, pursuant to the authority contained in sections 4(i), 5, 214, 254, 303(r), 403, and 405 of the Communications Act of 1934, as amended, 47 U.S.C. 154(i), 155, 214, 254, 303(r), 403, 405, the 5G Fund Second Report and Order and Order on Reconsideration is adopted.

196. It is further ordered that the rules and requirements adopted in the 5G Fund Second Report and Order and Order on Reconsideration will become effective thirty (30) days after publication in the Federal Register . Sections 54.322(b), 54.322(g), 54.322(h), 54.322(i), 54.322(j), 54.1014(a), 54.1014(b)(2), 54.1018(a), 54.1018(b), 54.1018(c), 54.1018(d), 54.1018(f), 54.1019(a)(1), 54.1019(a)(2), 54.1019(a)(3), 54.1019(b), 54.1022(b), and 54.1022(f), may contain new or modified information collection requirements that require review by the Office of Management and Budget (OMB) under the Paperwork Reduction Act. The Commission directs OEA, WCB, and WTB to announce the compliance date for these sections in a document published in the Federal Register and directs them OEA to cause sections 54.322(l), 54.1014(c), 54.1018(h), 54.1019(e), and 54.1022(g) to be revised accordingly.

197. It is further ordered that the Joint Petition for Reconsideration filed by The Rural Wireless Association and NTCA-The Rural Broadband Association in GN Docket No. 20-32 on December 28, 2020, is granted in part and denied in part, as indicated herein.

198. It is further ordered that the Petition for Reconsideration filed by The Coalition of Rural Wireless Carriers in GN Docket No. 20-32 on December 28, 2020, is dismissed in part, granted in part, and denied in part, as indicated herein.

199. It is further ordered that the Petition for Partial Reconsideration filed CTIA in GN Docket No. 20-32 on December 28, 2020, is granted in part and denied in part, as indicated herein.

200. It is further ordered that the Petition for Reconsideration filed by Smith Bagley, Inc. in GN Docket No. 20-32 on December 28, 2020, is denied, as indicated herein.

201. It is further ordered that the Petition for Reconsideration filed by 5G Fund Supporters in GN Docket No. 20-32 on November 30, 2020, is dismissed in part and denied in part, as indicated herein.

202. It is further ordered that the Office of the Managing Director, Performance Program Management, shall send a copy of the 5G Fund Second Report and Order and Order on Reconsideration in a report to be sent to Congress and the Government Accountability Office pursuant to the Congressional Review Act, 5 U.S.C. 801(a)(1)(A).

203. It is further ordered that the Commission's Office of the Secretary, shall send a copy of the 5G Fund Second Report and Order and Order on Reconsideration, including the Supplemental Final Regulatory Flexibility Analysis, to the Chief Counsel for Advocacy of the Small Business Administration.

List of Subjects in 47 CFR Part 54

Communications common carriers, Internet, Reporting and recordkeeping requirements, Telecommunications.

Federal Communications Commission.

Marlene Dortch,

Secretary, Office of the Secretary.

Final Rules

For the reasons discussed in the preamble, the Federal Communications Commission amends 47 CFR part 54 to read as follows:

PART 54-UNIVERSAL SERVICE

1. The authority citation for part 54 continues to read as follows:

Authority:

47 U.S.C. 151, 154(i), 155, 201, 205, 214, 219, 220, 229, 254, 303(r), 403, 1004, 1302, 1601-1609, and 1752, unless otherwise noted.

2. Amend §?54.307 by revising paragraphs (e)(5) introductory text, (e)(5)(ii) through (iv), (e)(6), and (e)(7) to read as follows:

§?54.307 Support to a competitive eligible telecommunications carrier.

(e) * * *


[top] (5) Eligibility for interim support before 5G Fund Phase I auction. Beginning the first day of the month following December 28, 2020, a competitive eligible page 101395 telecommunications carrier that receives support pursuant to paragraph (a) or (e)(2) of this section shall no longer receive such support and shall instead receive support as described in paragraph (e)(5).

(ii) Until the first day of the month following the release of the first public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the authorization of support for any area eligible for support in the 5G Fund Phase I auction as described in paragraph (e)(6) of this section:

(A) A mobile competitive eligible telecommunications carrier that receives support pursuant to paragraph (a) of this section shall receive "monthly baseline support" in an amount equal to one-twelfth ( 11 ) of its total support received for the preceding 12-month period.

(B) A mobile competitive eligible telecommunications carrier that receives support pursuant to paragraph (e)(2) of this section shall receive support at the same level described in paragraph (e)(2)(iii) of this section.

(iii) For mobile competitive eligible telecommunications carriers that receive support pursuant to paragraph (e)(5)(ii) of this section, beginning the first day of the month following the release of a public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the final areas eligible for support in the 5G Fund Phase I auction, the geographic boundary for each carrier's subsidized service area shall be subdivided into the smallest constituent piece for which support must be disaggregated and transitioned separately by overlaying on each carrier's subsidized service area boundary data the eligible and ineligible area boundaries, the minimum geographic area for bidding ( i.e., census tract boundaries), and the subsidized service area boundary data for other support recipients that receive support pursuant to paragraph (e)(5)(ii) of this section or that receive transitional support pursuant to §?54.1516(c). The percent area for each constituent piece shall then be calculated in order to disaggregate and apportion the legacy high-cost support amount for each area, which shall be calculated by multiplying the monthly support level described in paragraph (e)(5)(ii) of this section by the areal percentage of the constituent piece of the competitive eligible telecommunications carrier's service area, weighted by applying the 5G Fund adjustment factor methodology and values adopted by the Office of Economics and Analytics and Wireline Competition Bureau in Public Notice, DA 20-1361. At the conclusion of this disaggregation process, the sum of the disaggregated support amounts for all constituent parts shall precisely equal the legacy support amount for the carrier's service area consistent with the amount described in paragraph (e)(5)(ii) of this section.

(iv) For mobile competitive eligible telecommunications carriers that receive transitional support pursuant to §?54.1516(c), beginning the first day of the month following the release of a public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the final areas eligible for support in the 5G Fund Phase I auction, the geographic boundary for each carrier's subsidized service area shall be subdivided into the smallest constituent piece for which support must be disaggregated and transitioned separately by overlaying on each carrier's subsidized service area boundary data the eligible and ineligible area boundaries, the minimum geographic area for bidding ( i.e., census tract boundaries), and the subsidized service area boundary data for other support recipients that receive support pursuant to paragraph (e)(5)(ii) of this section or that receive transitional support pursuant to §?54.1516(c). The percent area for each constituent piece shall then be calculated in order to disaggregate and apportion the transitional support amount for each area, which shall be calculated by multiplying the monthly support level described in §?54.1516(c) by the areal percentage of the constituent piece of the competitive eligible telecommunications carrier's service area, weighted by applying the 5G Fund adjustment factor methodology and values adopted by the Office of Economics and Analytics and Wireline Competition Bureau in Public Notice, DA 20-1361. At the conclusion of this disaggregation process, the sum of the disaggregated support amounts for all constituent parts shall precisely equal the transitional support amount for the carrier's service area consistent with the amount described in §?54.1516(c).

(6) Eligibility for support after 5G Fund Phase I auction. (i) For all areas that are ineligible for 5G Fund support, a two-year phase down of legacy high-cost support will commence on the first day of the month following the release of the first public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the authorization of support for any area eligible for support in the 5G Fund Phase I auction. At such time, a mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(5)(iii) or (iv) of this section shall instead receive monthly support amounts for such ineligible areas as follows:

(A) For 12 months starting the first day of the month following the release of the public notice described in paragraph (e)(6)(i) of this section, each mobile competitive eligible telecommunications carrier shall receive a monthly support amount that is two-thirds ( 23 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of its service area that is ineligible for 5G Fund Phase I support.

(B) For 12 months starting the first day of the month following the period described in paragraph (e)(6)(i)(A) of this section, each mobile competitive eligible telecommunications carrier shall receive a monthly support amount that is one-third ( 13 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of its service area that is ineligible for 5G Fund Phase I support.

(C) Following the period described in paragraph (e)(6)(i)(B) of this section, no mobile competitive eligible telecommunications carrier shall receive monthly support for an area that is ineligible for 5G Fund Phase I support pursuant to this section.

(ii) For all areas that are eligible for support in the 5G Fund Phase I auction, the transition from legacy high-cost support will commence as follows:

(A) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(5)(iii) or (iv) of this section for an area and is the winning bidder for that area in the 5G Fund Phase I auction shall continue to receive support at the same level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, until the first day of the month following the release of a public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing whether or not the carrier is authorized to receive 5G Fund Phase I support.


[top] ( 1 ) If the mobile competitive eligible telecommunications carrier is authorized to receive 5G Fund Phase I support in that area, beginning the first day of the month following the release of a public notice by the Office of Economics and Analytics and Wireline Competition Bureau authorizing the carrier to receive such support in that area, the carrier shall no longer receive support pursuant to paragraph (e)(5)(iii) page 101396 or (iv) of this section, as applicable, and shall instead receive monthly support in the amount determined by its 5G Fund Phase I winning bid pursuant to §?54.1017.

( 2 ) If the mobile competitive eligible telecommunications carrier is not authorized to receive 5G Fund Phase I support in that area, the carrier shall no longer receive support at the level of monthly support described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for such area, and shall instead receive monthly support as follows:

( i ) For 12 months starting the first day of the month following release of a public notice announcing that the carrier is not authorized to receive 5G Phase I auction support, the carrier shall receive a monthly support amount that is two-thirds ( 23 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of the area.

( ii ) For 12 months starting the month following the period described in paragraph (e)(6)(ii)(A)( 2 )( i ) of this section, the carrier shall receive a monthly support amount that is one-third ( 13 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of the area.

( iii ) Following the period described in paragraph (e)(6)(ii)(A)( 2 )( ii ) of this section, the carrier shall not receive monthly support for the area pursuant to this section.

(B) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(5)(iii) or (iv) of this section for an area and is not the winning bidder for such area in the 5G Fund Phase I auction shall continue to receive support at the same level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, until the first day of the month following the release of a public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the authorization of 5G Fund Phase I support for that area. Thereafter, the carrier shall instead receive monthly support for that area as follows:

( 1 ) For 12 months starting the first day of the month following the release of the public notice described in paragraph (e)(6)(ii)(B) of this section, the carrier shall receive a monthly support amount that is two-thirds ( 23 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of the area.

( 2 ) For 12 months starting the month following the period described in paragraph (e)(6)(ii)(B)( 1 ) of this section, the carrier shall receive a monthly support amount that is one-third ( 13 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of the area.

( 3 ) Following the period described in paragraph (e)(6)(ii)(B)( 2 ) of this section, the carrier shall not receive monthly support for the area pursuant to this section.

(C) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(5)(iii) or (iv) of this section for an area eligible for support in the 5G Fund Phase I auction, but for which support is not won, and for which the carrier is not receiving the minimum level of support for the area shall, beginning the first day of the month following the release of the first public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the authorization of support for any eligible area won in the 5G Fund Phase I auction, receive monthly support for that area as follows:

( 1 ) For 12 months starting the first day of the month following the release of the public notice described in paragraph (e)(6)(ii)(C) of this section, the carrier shall receive a monthly support amount that is two-thirds ( 23 ) of the level described in paragraph (e)(5)(iii) or (iv) of this section, as applicable, for each constituent part of the area.

( 2 ) For 12 months starting the month following the period described in paragraph (e)(6)(ii)(C)( 1 ) of this section, the carrier shall receive a monthly support amount that is one-third ( 13 ) of the level described in paragraph (e)(5)(iii) or (e)(5)(iv) of this section, as applicable, for each constituent part of the area.

( 3 ) Following the period described in paragraph (e)(6)(ii)(C)( 2 ) of this section, the carrier shall not receive monthly support for the area pursuant to this section.

(D) A mobile eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(5)(iii) of this section for an area eligible for support in the 5G Fund Phase I auction, but for which support is not won, and for which the carrier is receiving the minimum level of support for such area, shall continue to receive a monthly support amount for such area at the level described in paragraph (e)(5)(iii) of this section for each constituent part of the area for no more than 60 months from the first day of the month following the release of the first public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing the authorization of support for any eligible area won in the 5G Fund Phase I auction. The "minimum level of sustainable support" is the lowest monthly support received by a mobile competitive eligible telecommunications carrier for the area that has deployed the highest level of technology ( e.g., 5G) within the state encompassing the area.

(7) Eligibility for support after 5G Fund Phase II auction. For all areas that are eligible for support in the 5G Fund Phase II auction, the transition from support described in paragraph (e)(6)(ii)(B), (C), or (D) of this section, as applicable, will commence as follows:

(i) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(6)(ii)(B), (C), or (D) of this section, as applicable, and is a winning bidder in the 5G Fund Phase II auction for the area for which it receives such support, shall receive support for such area at the same level described in paragraph (e)(6)(ii)(B), (C), or (D) of this section until the first day of the month following the release of a public notice by the Office of Economics and Analytics and Wireline Competition Bureau announcing whether or not the carrier is authorized to receive 5G Fund Phase II support.

(A) If the mobile competitive eligible telecommunications carrier is authorized to receive 5G Fund Phase II support in the area, the carrier shall no longer receive support pursuant to paragraph (e)(6)(ii)(B), (C), or (D) of this section for such area, and shall instead receive monthly support in the amount determined by its 5G Fund Phase II winning bid pursuant to §?54.1017.

(B) If the mobile competitive eligible telecommunications carrier is not authorized to receive 5G Fund Phase II support in that area, the carrier shall no longer receive support at the level of monthly support pursuant to paragraph (e)(6)(ii)(B), (C), or (D) of this section for such area, as applicable, and shall instead receive monthly support as follows for such area:

( 1 ) For 12 months starting the first day of the month following release of a public notice announcing that the carrier is not authorized to receive 5G Phase II auction support, the carrier shall receive an amount of monthly support that is two-thirds ( 23 ) of the level described in paragraph (e)(6)(ii)(B), (C), or (D) of this section for the area, as applicable.


[top] ( 2 ) For 12 months starting the month following the period described in paragraph (e)(7)(i)(B)( 1 ) of this section, the carrier shall receive an amount of monthly support that is one-third ( 13 ) of the level described in paragraph page 101397 (e)(6)(ii)(B), (C), or (D) of this section for the area, as applicable.

( 3 ) Following the period described in paragraph (e)(7)(i)(B)( 2 ) of this section, the carrier shall not receive monthly support for the area pursuant to this section.

(ii) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(6)(ii)(B) or (C) of this section for an area for which support is won in the 5G Fund Phase II auction and for which the carrier is not the winning bidder shall continue to receive support for that area as described in paragraph (e)(6)(ii)(B) or (C) of this section.

(iii) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(6)(ii)(B), (C), or (D) of this section for an area, as applicable, for which support is not won in the 5G Fund Phase II auction, shall continue to receive support for that area as described in paragraph (e)(6)(ii)(B), (C), or (D) of this section.

(iv) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to paragraph (e)(6)(ii)(D) of this section for an area for which support is won in the 5G Fund Phase II auction and for which the carrier is not the winning bidder shall receive the following monthly support amounts for such areas:

(A) For 12 months starting the first day of the month following release of a public notice announcing the close of the 5G Fund Phase II auction, the mobile competitive eligible telecommunications carrier shall receive monthly support that is two-thirds ( 23 ) of the level described in paragraph (e)(6)(ii)(D) of this section for the area.

(B) For 12 months starting the month following the period described in paragraph (e)(7)(iv)(A) of this section, the mobile competitive eligible telecommunications carrier shall receive monthly support that is one-third ( 13 ) of the level described in paragraph (e)(6)(ii)(D) of this section for the area.

(C) Following the period described in paragraph (e)(7)(iv)(B) of this section, the mobile competitive eligible telecommunications carrier shall not receive monthly support for the area pursuant to this section.

3. Amend §?54.322 by:

a. Removing "§?54.307(e)(5)(ii), (e)(5)(iii), (e)(6)(iii), or (e)(7)(iii)" and adding in its place "§?54.307(e)(5)(ii) through (iv), (e)(6)(ii)(D), or (e)(7)(iii)" wherever it appears in paragraphs (a) through (c), (d) introductory text, and (j)(1);

b. Revising paragraph (h)(1);

c. Revising paragraph (i)(1)(i);

d. Redesignating paragraph (i)(1)(vi) as paragraph (i)(1)(viii);

e. Redesignating paragraphs (i)(1)(iv) and (v) as paragraphs (i)(1)(v) and (vi), respectively;

f. Adding new paragraph (i)(1)(iv);

g. Revising newly redesignated paragraphs (i)(1)(v) and (vi);

h. Adding paragraph (i)(1)(vii);

i. Revising paragraphs (k)(2) and (3); and

j. Adding paragraph (l).

The revisions and additions read as follows:

§?54.322 Public interest obligations and performance requirements, reporting requirements, and non-compliance mechanisms for mobile legacy high-cost support recipients.

(a) General. A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) shall deploy voice and broadband data services that meet at least the 5G-NR (New Radio) technology standards developed by the 3rd Generation Partnership Project with Release 15, or any successor release that may be adopted by the Office of Economics and Analytics and the Wireline Competition Bureau after notice and comment.

(b) Service milestones and deadlines. A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) shall deploy 5G service that meets the performance requirements specified in paragraph (d) of this section to a percentage of the service areas for which the carrier receives monthly support and on a schedule as specified and adopted by the Office of Economics and Analytics and Wireline Competition Bureau after notice and comment.

(c) Support usage. A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) shall use an increasing percentage of such support for the deployment, maintenance, and operation of mobile networks that provide 5G service as specified in paragraph (a) of this section and that meet the performance requirements specified in paragraph (d) of this section as follows:

(1) Year one support usage. The carrier shall use at least one-third ( 13 ) of the total monthly support received pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) in calendar year 2021 as specified in paragraph (c) of this section by December 31, 2021.

(2) Year two support usage. The carrier shall use at least two-thirds ( 23 ) of the total monthly support received pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) in calendar year 2022 as specified in paragraph (c) of this section by December 31, 2022.

(3) Year three and subsequent year support usage. The carrier shall use all monthly support received pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) as specified in paragraph (c) of this section in 2023 and thereafter.

(4) Year one support usage flexibility. If the carrier is unable to meet the support usage requirement in paragraph (c)(1) of this section, the carrier shall have the flexibility to instead proportionally increase the support usage requirement in paragraph (c)(2) of this section such that its combined usage of monthly support received pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) in calendar years 2021 and 2022 is equal to the total amount of such support that the carrier receives annually, provided that the carrier certifies to the Wireline Competition Bureau this amount and that it will make up for any shortfall in a filing due by March 31, 2021 or 30 days after Paperwork Reduction Act approval, whichever is later.

(d) Performance requirements. A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), (e)(6)(iii), or (e)(7)(iii) shall meet the following minimum baseline performance requirements for data speeds, data latency, and data allowances in areas that it has deployed 5G service as specified in paragraph (a) of this section and for which it receives support for at least one plan that it offers:


[top] (h) Initial report of current service offerings. (1) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to §?54.307(e)(5), (e)(6), or (e)(7) shall submit an initial report describing its current service offerings in its subsidized service areas and how the monthly support it is receiving is being used in such areas no later than three months after December 28, 2020, and Paperwork Reduction Act approval. page 101398 This report shall include the following information:

(i) * * *

(1) * * *

(i) Except for areas for which the carriers receives monthly support pursuant to §?54.307(e)(6)(ii) or (e)(7)(iv), updated information regarding the carrier's current service offerings in its subsidized service areas for the previous calendar year, including the highest level of technology deployed, a target date for when 5G broadband service meeting the performance requirements specified in paragraph (d) of this section will be deployed within the subsidized service area, and an estimate of the percentage of area covered by 5G deployment meeting the performance requirements specified in paragraph (d) of this section within the subsidized service area;

(iv) Provide the information and certifications required by §?54.313(a);

(v) Certification that the carrier has filed relevant deployment data (either via FCC Form 477 or the Broadband Data Collection, as appropriate) that reflect its current deployment covering its subsidized service areas;

(vi) Certification that the carrier is in compliance with the public interest obligations as set forth in this section and all of the terms and conditions associated with the continued receipt of monthly support;

(vii) Certification as to whether the carrier used any monthly support it receives pursuant to §?54.307(e)(5), (6), or (7) pursuant to §?54.207(f), and if so, whether the carrier used such support in compliance with §?54.7; and

(j) Service milestone reports. (1) A mobile competitive eligible telecommunications carrier that receives monthly support pursuant to §?54.307(e)(5)(ii), (e)(5)(iii), (e)(5)(iv), (e)(6)(ii)(D), or (e)(7)(iii) shall submit a report after each of the service milestones described in paragraph (b) of this section by the deadlines established by the Office of Economics and Analytics and Wireline Competition Bureau demonstrating that it has deployed 5G service that meets the performance requirements specified in paragraph (d) of this section, which shall include information as required by the Office of Economics and Analytics and Wireline Competition Bureau in a public notice.

(k) * * *

(2) Upon notification by a carrier of its non-compliance pursuant to paragraph (k) of this section, or a determination by the Administrator or Wireline Competition Bureau of a carrier's non-compliance with any of the public interest obligations set forth in paragraphs (e) through (j) of this section or the performance requirements set forth in paragraph (d) of this section, the carrier will be deemed to be in default, and for monthly support received pursuant to §?54.307(e)(5), (e)(6), or (e)(7), will no longer be eligible to receive such support, will receive no further support disbursements, will be subject to a recovery of the amount of support received since December 28, 2020 that was not used for the deployment, maintenance, and operation of mobile networks that provide 5G service as specified in paragraph (c) of this section, and may be subject to recovery of up to the amount of support received since the December 28, 2020, other than the amount specified in paragraph (c) of this section, that was not used for the deployment, maintenance, and operation of mobile networks that provide 5G service as specified in paragraph (a) of this section and that meet the performance requirements specified in paragraph (d) of this section. The carrier may also be subject to further action, including the Commission's existing enforcement procedures and penalties, potential revocation of ETC designation, and suspension or debarment pursuant to §?54.8.

(3) A mobile competitive eligible telecommunications carrier that voluntarily relinquishes receipt of monthly support pursuant to §?54.307(e)(5), (e)(6), or (e)(7) will no longer be required to comply with the public interest obligations specified in this section.

(l) Compliance with paragraphs (b), (g), (h), (i), and (j) of this section will not be required until after the completion of such review by the Office of Management and Budget as the Office of Economics and Analytics and Wireline Competition Bureau deem necessary. The Commission will publish a document in the Federal Register announcing that compliance date and revising or removing this paragraph (l).

4. Amend §?54.1011 by revising paragraphs (c), (d), and (e) to read as follows:

§?54.1011 5G Fund.

(c) Areas eligible for 5G Fund Phase I support will be those areas identified by the Office of Economics and Analytics and Wireline Competition Bureau in a public notice that:

(1) Show a lack of unsubsidized 5G mobile wireless broadband coverage at a download speed of 7 Mbps and an upload speed of 1 Mbps in an outdoor stationary environment by at least one provider based on the mobile broadband coverage maps created by the Commission pursuant to §?1.7008 of this chapter;

(2) Do not contain urban areas, as defined by the U.S. Census Bureau; and

(3) Contain at least one location or at least some portion of a road.

(d) The Commission will incorporate a service-based weighting factor into the 5G Fund auction design that will assign a weight to each geographic area eligible in the 5G Fund Phase I auction using the weighting values adopted by the Office of Economics and Analytics and Wireline Competition Bureau and announced in a public notice.

(e) The Commission will incorporate an adjustment factor into the methodology for disaggregation of high-cost legacy support pursuant to §?54.307(e)(5)(iii) and (iv) that will assign a weight to each geographic area using the adjustment factor values adopted by the Office of Economics and Analytics and Wireline Competition Bureau and announced in the Adjustment Factor Values Public Notice, DA 20-1361.

5. Amend §?54.1012 by adding paragraph (c) to read as follows:

§?54.1012 Geographic areas eligible for support.

(c) The geographic areas identified as eligible for support in the 5G Fund Phase I auction will be converted, to, and made available in, the form of hexagons at the resolution 9 level (hex-9s) using the H3 standardized geospatial indexing system defined in §?1.7001(a)(20) of this chapter. All eligible hex-9s will then be grouped into census tracts for purposes of bidding in the auction.

(1) The hex-9s that are eligible for 5G Fund support in the 5G Fund Phase I auction will be generated using the following process:

(i) Overlay resolution 11 hexagons (hex-11s) on the "raw" mobile coverage polygons submitted in the Broadband Data Collection for 5G outdoor stationary coverage at speeds of at least 7/1 Mbps on unsubsidized areas, and on urban areas. If the centroid ( i.e., the geographic center point) of the hex-11, overlaps any of those boundaries, then the entire hex-11 is considered covered by that boundary and "served."


[top] (ii) Divide the number of served grandchild hex-11s belonging to the grandparent hex-9 by the total number page 101399 of grandchild hex-11s belonging to the grandparent hex-9 to determine the percentage of the hex-9 that is considered served. The centroid of a hex-11 must fall within the boundary of United States or its territories to be included in this calculation. For hex-9s with both land and water grandchild hex-11s, only the land hex-11s are considered in this calculation.

(iii) If a "substantial majority" of the grandchild hex-11s belonging to a grandparent hex-9 are served, then the entire hex-9 will be considered served. For purposes of this determination, a "substantial majority" is 70% or more.

(2) After completing the process described in paragraphs (c)(1)(i) through (iii) of this section, any hex-9 that is not considered served and that also contains at least one location or some portion of a road will be eligible for support in the 5G Fund Phase I auction.

6. Amend §?54.1014 by redesignating paragraph (a)(6) as paragraph (a)(7), adding new paragraph (a)(6), and adding new paragraph (c) to read as follows:

§?54.1014 Application process.

(a) * * *

(6) Certify, under penalty of perjury, that it has read the public notice adopting procedures for the 5G Fund Phase I auction, and that it has familiarized itself with those procedures and any requirements, terms, and conditions associated with receipt of 5G Fund support; and

(c) Compliance with paragraphs (a) and (b)(2) of this section will not be required until after the completion of such review by the Office of Management and Budget as the Office of Economics and Analytics and Wireline Competition Bureau deem necessary. The Commission will publish a document in the Federal Register announcing that compliance date and revising or removing this paragraph (c).

7. Amend §?54.1015 by revising paragraph (c)(1) to read as follows:

§?54.1015 Public interest obligations and performance requirements for 5G Fund support recipients.

(c) * * *

(1) 35 Mbps download and 3 Mbps upload in an in-vehicle environment, with at least 90 percent of measurements recording these data transmission speeds; and

8. Amend §?54.1018 by:

a. Revising paragraph (a);

b. Redesignating paragraphs (b), (c), (d), (e), and (f) as paragraphs (c), (d), (e), (f), and (g), respectively;

c. Adding new paragraph (b); and

d. Adding new paragraph (h).

The revisions and additions read as follows:

§?54.1018 Annual reports.

(a) A 5G Fund support recipient authorized to receive 5G Fund support shall submit an annual report to the Administrator no later than July 1 of each year after the year in which it was authorized to receive support. Each support recipient shall certify in its annual report that it:

(1) Is in compliance with the public interest obligations, performance requirements, and all of the terms and conditions associated with the receipt of 5G Fund support in order to continue receiving 5G Fund support disbursements; and

(2) Has maintained its cybersecurity and supply chain risk management plans pursuant to §?54.1022.

(b) Each 5G Fund support recipient authorized to receive 5G Fund support shall report in its annual report whether it filed any substantive modifications pursuant to §?54.1022(f) in the prior year, and shall report the date it filed any such substantive modifications.

(h) Compliance with paragraphs (a) through (d) and (f) of this section will not be required until after the completion of such review by the Office of Management and Budget as the Office of Economics and Analytics and Wireline Competition Bureau deem necessary. The Commission will publish a document in the Federal Register announcing that compliance date and revising or removing this paragraph (h).

9. Amend §?54.1019 by:

a. Revising paragraphs (a)(1) and (2);

b. Removing paragraph (a)(3);

c. Redesignating paragraph (a)(4) as paragraph (a)(3);

d. Revising newly redesignated paragraph (a)(3);

e. Revising paragraphs (b), (c), and (d); and

f. Adding paragraph (e).

The revisions and additions read as follows:

§?54.1019 Interim service and final service milestone reports.

(a) * * *

(1) Certifications to representative data submitted in the Broadband Data Collection demonstrating mobile transmissions to and from the network that establish compliance with the 5G Fund coverage, speed, and latency requirements;

(2) On-the-ground test data or infrastructure data to substantiate 5G broadband coverage data;

(i) On-the-ground test data must:

(A) Be collected within each selected hexagon in a sample of hexagons at the resolution 9 level selected by Commission staff;

(B) Be conducted pursuant to the testing parameters and metrics for valid on-the-ground tests described in §?1.7006(c)(1)(i) and (ii) of this chapter;

(C) Show that at least 90% of the support recipient's speed test measurements demonstrate that it has deployed service meeting the 5G Fund performance requirements specified in §?54.1015(c) in the area(s) for which the support recipient is authorized to receive 5G Fund support;

(D) Include at least two tests within each of the selected hexagons where the time of the tests are at least four hours apart, irrespective of date, unless the support recipient has, and submits with its speed tests, actual cell loading data for the cell(s) covering the sampled hexagon showing that the median loading, measured in 15-minute intervals, did not exceed the modeled loading factor for the one-week period prior to the submission, in which case the support recipient must submit two speed tests for each hexagon and the two tests need not be recorded four hours apart;

(E) Be conducted in an in-vehicle mobile environment with the antenna located inside the vehicle.

(ii) Infrastructure data must include the information described in §?1.7006(c)(2)(i) of this chapter for all cell sites and antennas within the area(s) for which the support recipient is authorized to receive 5G Fund support;

(3) Additional information as required by Commission staff.

(b) All data submitted and certified to in compliance with a recipient's public interest obligations in the milestone report must be certified by an engineer with the same qualifications as required for submitting the Broadband Data Collection biannual filings described in §?1.7004 of this chapter.

(c) Each service milestone report must be submitted via the Commission's Broadband Data Collection portal.

(d) All data submitted in and certified to in any service milestone report shall be subject to verification by the Administrator and Commission staff for compliance with the 5G Fund performance requirements specified in §?54.1015(c).


[top] (e) Compliance with paragraphs (a)(1) through (3) and (b) of this section will not be required until after the completion of such review by the Office of Management and Budget as the Office of Economics and Analytics and page 101400 Wireline Competition Bureau deem necessary. The Commission will publish a document in the Federal Register announcing that compliance date and revising or removing this paragraph (e).

10. Add §?54.1022 to read as follows:

§?54.1022 Cybersecurity and supply chain risk requirements.

(a) A 5G Fund support recipient must implement operational cybersecurity and supply chain risk management plans meeting the requirements of this section as a condition of receiving 5G Fund support.

(b) A 5G Fund support recipient must certify that it has implemented plans required under paragraph (a) of this section and submit the plans to the Administrator by the date announced by the Office of Economics and Analytics and the Wireline Competition Bureau in a public notice or within 30 days after approval under the Paperwork Reduction Act, whichever is later .

(c) A 5G Fund support recipient that fails to comply with any 5G Fund cybersecurity or supply chain risk management requirement is subject to the following non-compliance measures:

(1) The Wireline Competition Bureau shall direct the Administrator to withhold 25 percent of the 5G Fund support recipient's monthly support for failure to comply with paragraph (b) of this section until the support recipient makes the required certification and submits the required plans.

(2) At any time during the support term, if a 5G Fund support recipient does not have in place operational cybersecurity and supply chain risk management plans meeting the requirements of this section, the Wireline Competition Bureau shall direct the Administrator to withhold 25 percent of the support recipient's monthly support.

(3) Once the 5G Fund support recipient comes into compliance, the Administrator shall stop withholding support, and the support recipient will receive all of the support that had been withheld pursuant to this section.

(d) A 5G Fund support recipient's cybersecurity risk management plan must reflect at least the National Institute of Standards and Technology (NIST) Framework for Improving Critical Infrastructure Cybersecurity v.1.1 (2018) (NIST Framework) or any successor version of the NIST Framework, and must reflect established cybersecurity best practices that address each of the Core Functions described in the NIST Framework, such as the standards and controls set forth in the Cybersecurity & Infrastructure Security Agency (CISA) Cybersecurity Cross-sector Performance Goals and Objectives or the Center for internet Security Critical Security Controls.

(e) A 5G Fund support recipient's supply chain risk management plan must incorporate the key practices discussed in NISTIR 8276, Key Practices in Cyber Supply Chain Risk Management: Observations from Industry, and related supply chain risk management guidance from NIST 800-161.

(f) If a 5G Fund support recipient makes a substantive modification to a plan under this section, the carrier must file an updated plan with the Administrator within 30 days of making the modification. A modification to a plan under this section is substantive if at least one of the following conditions apply:

(1) There is a change in the plan's scope, including any addition, removal, or significant alternation to the types of risks covered by the plan ( e.g., expanding a plan to cover new areas, such as supply chain risks to Internet of Things devices or cloud security, could be a substantive change);

(2) There is a change in the plan's risk mitigation strategies ( e.g., implementing a new encryption protocol or deploying a different firewall architecture);

(3) There is a shift in organizational structure ( e.g., creating a new information technology department or hiring a Chief Information Security Officer);

(4) There is a shift in the threat landscape prompting the organization to recognize that emergence of new threats or vulnerabilities that were not previously accounted for in the plan;

(5) Updates are made to comply with new cybersecurity regulations, standards, or laws;

(6) Significant changes are made in the supply chain, including offboarding major suppliers or vendors, or shifts in procurement strategies that may impact the security of the supply chain; or

(7) A large-scale technological change is made, including the adoption of new systems or technologies, migrating to a new information technology infrastructure, or significantly changing the information technology architecture.

(g) Compliance with paragraphs (b) and (f) of this section will not be required until after the completion of such review by the Office of Management and Budget as the Office of Economics and Analytics and Wireline Competition Bureau deem necessary. The Commission will publish a document in the Federal Register announcing that compliance date and revising or removing this paragraph (g).

[FR Doc. 2024-23404 Filed 12-12-24; 8:45 am]

BILLING CODE 6712-01-P