89 FR 199 pg. 83008 - Midcontinent Independent System Operator, Inc., PJM Interconnection, L.L.C., Southwest Power Pool, Inc., ISO New England, Inc.; Notice of Extension of Time
Type: NOTICEVolume: 89Number: 199Page: 83008
Page: 83008Docket number: [Docket Nos. EL24-80-000; EL24-81-000; EL24-82-000; EL24-83-000]
FR document: [FR Doc. 2024-23745 Filed 10-11-24; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL24-80-000; EL24-81-000; EL24-82-000; EL24-83-000]
Midcontinent Independent System Operator, Inc., PJM Interconnection, L.L.C., Southwest Power Pool, Inc., ISO New England, Inc.; Notice of Extension of Time
On September 30, 2024, Advanced Energy Economy, the American Clean Power Association, and the Solar Energy Industries Association (collectively, the Clean Energy Associations) filed a motion for a 14-day extension of time-from October 11, 2024 to October 25, 2024-for interested entities to submit responses in the above-referenced proceedings. 1 No answers were filed.
Footnotes:
1 ? Midcontinent Indep. Sys. Operator, Inc., 187 FERC ¶?61,170, at P 72 & ordering para. (E) (2024).
Upon consideration, notice is hereby given that an extension of time for interested entities to file responses in the above-referenced proceedings is granted to and including October 25, 2024.
Dated: October 8, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-23745 Filed 10-11-24; 8:45 am]
BILLING CODE 6717-01-P