87 FR 12 pgs. 2702-2703 - Safety of Water Power Projects and Project Works
Type: RULEVolume: 87Number: 12Pages: 2702 - 2703
Pages: 2702, 2703Docket number: [Docket No. RM20-9-000; Order No. 880]
FR document: [FR Doc. C1-2021-27736 Filed 1-18-22; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 12
[Docket No. RM20-9-000; Order No. 880]
Safety of Water Power Projects and Project Works
Correction
In rule document 2021-27736, appearing on pages 1490-1520, in the issue of Tuesday, January 11, 2022, make the following changes:
§?12.4 [Corrected].
1. On page 1514, in the first column, under amendatory instruction number 3, instruction "3c" currently reads, "Adding paragraphs (b)(2)(iii)(C) and (D);" should read, "Revising paragraphs (c)(1), (c)(2) introductory text, and (c)(3); and"
[top] 2. On page 1514, in the first column, under amendatory instruction number 3, instruction "3d" currently reads, "Revising paragraphs (c)(1), (c)(2)
3. On page 1514, in the first column, under amendatory instruction number 3, instruction "3e" should be deleted.
§?12.10 Reporting safety-related incidents [Corrected].
1. On page 1514, in the third column, amendatory instruction number "4(b)(5)" should read "4(b)(4)"
[FR Doc. C1-2021-27736 Filed 1-18-22; 8:45 am]
BILLING CODE 0099-10-P