84 FR 125 pg. 31134 - Seven County Infrastructure Coalition—Rail Construction & Operation—in Utah, Carbon, Duchesne, and Uintah Counties, Utah; Correction
Type: NOTICEVolume: 84Number: 125Page: 31134
Page: 31134Docket number: [Docket No. FD 36284]
FR document: [FR Doc. 2019-13890 Filed 6-27-19; 8:45 am]
Agency: Surface Transportation Board
Official PDF Version: PDF Version
[top]
SURFACE TRANSPORTATION BOARD
[Docket No. FD 36284]
Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah; Correction
AGENCY:
Surface Transportation Board.
ACTION:
Notice; correction.
SUMMARY:
The Surface Transportation Board, Office of Environmental Analysis, published a document in the Federal Register of June 19, 2019, concerning preparation of an environmental impact statement, scheduled scoping meetings, and a request for comments on the draft scope of study. The street address for the first scoping meeting listed was incorrect.
FOR FURTHER INFORMATION CONTACT:
Joshua Wayland, Office of Environmental Analysis, Surface Transportation Board, 395 E Street SW, Washington, DC 20423, call the toll-free number at 1-855-826-7596, or visit the Board-sponsored project website at www.uintabasinrailwayeis.com.
SUPPLEMENTARY INFORMATION:
Correction
In the Federal Register of June 19, 2019, in FR Doc. 2019-12836, on page 28612, in the third column, correct the first bullet point under the Public Scoping Meetings caption to read:
• Monday July 15, 2019, 3-5 p.m. at the Ute Tribal Auditorium, 6964 East 1000 South, Fort Duchesne, Utah.
By the Board, Victoria Rutson, Director, Office of Environmental Analysis.
Jeffrey Herzig,
Clearance Clerk.
[FR Doc. 2019-13890 Filed 6-27-19; 8:45 am]
BILLING CODE 4915-01-P