83 FR 50 pgs. 11247-11248 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act
Type: NOTICEVolume: 83Number: 50Pages: 11247 - 11248
Pages: 11247, 11248FR document: [FR Doc. 2018-05140 Filed 3-13-18; 8:45 am]
Agency: Justice Department
Official PDF Version: PDF Version
[top]
DEPARTMENT OF JUSTICE
Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act
On February 27, 2018, the Department of Justice lodged a proposed Consent Decree with the United States District Court for the Southern District of Ohio in the lawsuit entitled United States v. Bridgestone Americas Tire Operations et al., Case No. 3:18-cv-00054 (S.D. Ohio).
[top] The proposed consent decree resolves claims of the United States Environmental Protection Agency ("EPA") against seven defendants-Bridgestone Americas Tire Operations, LLC; Cargill, Inc.; Flowserve Corporation; Kelsey-Hayes Company; NCR Corporation; Northrop Grumman Systems Corporation, and Waste Management of Ohio (collectively "Defendants)-for response costs and injunctive relief with respect to the North Sanitary (aka "Valleycrest") Landfill Superfund Site in Dayton, Ohio ("Site"). A complaint, which was filed simultaneously with the proposed consent decree, alleges that the Defendants are liable under Sections 106, 107(a), and 113(g)(2) of the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA"), 42 U.S.C. 9606, 9607(a), and 9613(g)(2). Under the proposed consent decree, the defendants will perform the remedy selected by EPA to address contamination at the Site by, among other things, designing and constructing a landfill "cap" that will cover approximately 70 acres of the Site. Other significant remedial actions will include the design and construction of a system to address landfill gas, as well as a system to prevent leachate from contaminating groundwater. Additionally, the Defendants will reimburse EPA for its future response costs, but they will not reimburse EPA for its future oversight costs unless and until such costs, together with past response costs and interim costs incurred before entry of the consent decree, exceed $8.37 million. The proposed consent decree will provide
The publication of this notice opens a period for public comment on the proposed consent decree. Comments should be addressed to the Assistant Attorney General, Environment and Natural Resources Division, and should refer United States v. Bridgestone Americas Tire Operations et al., Case No. 3:18-cv-00054 (S.D. Ohio), D.J. Ref. No. 90-11-3-11076. All comments must be submitted no later than thirty (30) days after the publication date of this notice. Comments may be submitted either by email or by mail:
To submit comments: | Send them to: |
---|---|
By email | pubcomment-ees.enrd@usdoj.gov . |
By mail | Assistant Attorney General, U.S. DOJ-ENRD, P.O. Box 7611, Washington, D.C. 20044-7611. |
During the public comment period, the proposed consent decree may be examined and downloaded at this Justice Department website: https://www.usdoj.gov/enrd/consent-decrees.html. We will also provide a paper copy of the proposed consent decree upon written request and payment of reproduction costs. Please mail your request and payment to: Consent Decree Library, U.S. DOJ-ENRD, P.O. Box 7611, Washington, DC 20044-7611.
Please enclose a check or money order for $84.50 (338 pages at 25 cents per page reproduction cost) payable to the United States Treasury. For a paper copy without the Appendices and signature pages, the cost is $20.75.
Randall M. Stone,
Acting Assistant Section Chief, Environmental Enforcement Section, Environment and Natural Resources Division.
[FR Doc. 2018-05140 Filed 3-13-18; 8:45 am]
BILLING CODE 4410-15-P