DEPARTMENT OF ENERGY
Southwestern Power Administration
Integrated System Rate Schedules
AGENCY:
Southwestern Power Administration, DOE.
ACTION:
Notice of public review and comment on proposed extension.
SUMMARY:
The Administrator, Southwestern Power Administration (Southwestern), completed an annual review of the continuing adequacy of the existing hydroelectric power rates for the Integrated System which are in effect through September 30, 2017. This review, included within the 2017 Integrated System Power Repayment Study (PRS), indicated the need for a revenue adjustment of 0.7 percent to continue to satisfy cost recovery criteria. Because the 0.7 percent revenue adjustment is within Southwestern's established ± 2 percent rate adjustment threshold, the Administrator has deferred the revenue adjustment and is proposing, to the Deputy Secretary for interim approval, a two-year extension of the Integrated System Rate Schedules for the period October 1, 2017 to September 30, 2019. Southwestern's current Integrated System Rate Schedules P-13, NFTS-13A, and EE-13 are set to expire September 30, 2017.
DATES:
Written comments are due on or before July 13, 2017.
ADDRESSES:
Comments should be submitted to Marshall Boyken, Senior Vice President and Chief Operating Officer, Office of Corporate Operations, Southwestern Power Administration, U.S. Department of Energy, One West Third Street, Tulsa, Oklahoma 74103, (918) 595-6646, marshall.boyken@swpa.gov.
FOR FURTHER INFORMATION CONTACT:
Marshall Boyken, Senior Vice President and Chief Operating Officer, Office of Corporate Operations, Southwestern Power Administration, U.S. Department of Energy, One West Third Street, Tulsa, Oklahoma 74103, (918) 595-6646, marshall.boyken@swpa.gov.
SUPPLEMENTARY INFORMATION:
Originally established by Secretarial Order No. 1865 of the Secretary of the Interior dated August 31, 1943, Southwestern is a Federal Power Marketing Administration within the U.S. Department of Energy (DOE), transferred to DOE by the Department of Energy Organization Act, Public Law 95-91, dated August 4, 1977. Guidelines for rate extensions are under Title 10, subpart A of the Code of Federal Regulations (10 CFR 903.23). Procedures for the confirmation and approval of rates for the Federal Power Marketing Administrations are found at Title 18, chapter I, subchapter L of the Code of Federal Regulations (18 CFR part 300).
Southwestern markets power from 24 multi-purpose reservoir projects with hydroelectric power facilities constructed and operated by the U.S. Army Corps of Engineers (Corps). These projects are located in the states of Arkansas, Missouri, Oklahoma, and Texas. Southwestern's marketing area includes these states plus Kansas and Louisiana. The costs associated with the hydropower facilities of 22 of the 24 projects are repaid via revenues received under the Integrated System rates, as are the costs associated with Southwestern's transmission facilities that consist of 1,380 miles of high-voltage transmission lines, 27 substations, and 46 microwave and VHF radio sites. Costs associated with the Sam Rayburn and Robert D. Willis Dams, two Corps projects that are isolated hydraulically, electrically, and financially from the Integrated System, are repaid by separate rate schedules and are not addressed in this notice.
Decision Rationale
Southwestern's current Integrated System Rate Schedules (P-13, NFTS-13A, and EE-13) are based on the 2013 PRS. Each subsequent annual PRS, through 2017, has indicated the need for a revenue adjustment that fell within a plus or minus two percent range. It is Southwestern's practice to defer revenue adjustments for the Integrated System if such adjustments are within plus or minus two percent of the revenue estimated from the current Integrated System Rate Schedules. The deferral of a revenue adjustment (rate change) provides for rate stability and savings on the administrative cost of implementation, and recognizes that the revenue sufficiency will be re-examined in the following year's PRS. Therefore, in line with the annual PRS results, Southwestern has deferred revenue adjustments in 2014, 2015, 2016 and 2017. The most recent deferral was in response to the 2017 Integrated System PRS, which concluded that the annual revenues needed to be increased by 0.7 percent. It was determined to be prudent to defer the increase in accordance with the established ± 2 percent threshold, allowing the current Integrated System Rate Schedules, which are set to expire September 30, 2017, to remain in effect.
Therefore, Southwestern is proposing an extension of the current Integrated System Rate Schedules, for the period October 1, 2017 to September 30, 2019. In accordance with 10 CFR 903.22(h) and 903.23(a)(3), the Deputy Secretary of Energy may extend existing rates on an interim basis beyond the period specified by the Federal Energy Regulatory Commission (FERC).
[top] The current Integrated System Rate Schedules were placed in effect on an interim basis by the Deputy Secretary of Energy effective September 1, 2013, and were confirmed and approved by the
The Administrator will review and consider all written comments and the information gathered when submitting the finalized Integrated System Rate Schedules Extension to the Deputy Secretary of Energy for confirmation and approval on an interim basis.
Dated: May 31, 2017.
Scott Carpenter,
Administrator.
[FR Doc. 2017-12171 Filed 6-12-17; 8:45 am]