82 FR 57 pg. 15137 - Change Schedule Deviation Dates on Atchafalaya River, Morgan City, LA
Type: RULEVolume: 82Number: 57Page: 15137
Page: 15137Docket number: [Docket No. USCG-2017-0071]
FR document: [FR Doc. 2017-05977 Filed 3-24-17; 8:45 am]
Agency: Homeland Security Department
Sub Agency: Coast Guard
Official PDF Version: PDF Version
[top]
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2017-0071]
Change Schedule Deviation Dates on Atchafalaya River, Morgan City, LA
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of temporary deviation from drawbridge regulation; correction.
SUMMARY:
The Coast Guard is correcting a regulation that appeared in the Federal Register of February 17, 2017. The document issued a temporary deviation from the operating schedule that governs the Morgan City Railroad Bridge across the Atchafalaya River (also known as Berwick Bay), mile 17.5 [Gulf Intracoastal Waterway (Morgan City-Port Allen Alternate Route), mile 0.3] in Morgan City, St. Mary Parish, Louisiana. The document had the incorrect dates in the SUMMARY, DATES , and SUPPLEMENTARY INFORMATION sections.
DATES:
This corrected deviation is effective from 6 a.m. Thursday, April 20, 2017, through 9 p.m. on Friday, April 28, 2017.
FOR FURTHER INFORMATION CONTACT:
If you have questions on this notice contact Donna Gagliano, Bridge Administration Branch, Coast Guard, telephone (504) 671-2128, email Donna.Gagliano@uscg.mil.
Correction
1. In the Federal Register of February 17, 2017 (82 FR 10960), in FR Doc. 2017-03186, on page 10960, in the second column, third and fourth paragraphs, correct the "Summary" and "Dates" sections by correcting the effective deviation dates to 6 a.m. Thursday, April 20, 2017, through 9 p.m. on Friday, April 28, 2017.
2. On the same page, in the third column, in the third paragraph, correct the Supplementary Information section to read:
"For the purposes of this deviation, the bridge will be allowed to remain in the closed-to-navigation position from 6 a.m. to 1 p.m. each day. From 1 p.m. until 2:30 p.m. the bridge will be opened for the passage of vessels. The bridge will again be closed-to-navigation from 2:30 p.m. to 9 p.m. This schedule will occur for two (2) separate two-day periods, on April 20 through 21, and on April 27 through April 28, 2017. At all other times the bridge will operate in accordance with 33 CFR 117.5."
Dated: March 22, 2017.
Katia Kroutil,
Chief, Office of Regulations & Administrative Law, U.S. Coast Guard.
[FR Doc. 2017-05977 Filed 3-24-17; 8:45 am]
BILLING CODE 9110-04-P