80 FR 77 pgs. 22516-22517 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Ferroalloys Production Area Sources (Renewal)
Type: NOTICEVolume: 80Number: 77Pages: 22516 - 22517
Pages: 22516, 22517Docket number: [EPA-HQ-OECA-2014-0099; FRL-9925-66-OEI]
FR document: [FR Doc. 2015-09361 Filed 4-21-15; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
[top]
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OECA-2014-0099; FRL-9925-66-OEI]
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Ferroalloys Production Area Sources (Renewal)
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Notice.
SUMMARY:
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), "NESHAP for Ferroalloys Production Area Sources (40 CFR part 63, subpart YYYYYY) (Renewal)" (EPA ICR No. 2303.04, OMB Control No. 2060-0625) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq. ). This is a proposed extension of the ICR, which is currently approved through April 30, 2015. Public comments were previously requested via the Federal Register (79 FR 30117) on May 27, 2014 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
DATES:
Additional comments may be submitted on or before May 22, 2015.
ADDRESSES:
[top] Submit your comments, referencing Docket ID Number EPA-HQ-OECA-2014-0099, to (1) EPA online using www.regulations.gov (our
EPA's policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460; telephone number: (202) 564-2970; fax number: (202) 564-0050; email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain in detail the information that the EPA will be collecting, are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov or in person at the EPA Docket Center, EPA West, Room 3334, 1301 Constitution Ave. NW., Washington, DC. The telephone number for the Docket Center is 202-566-1744. For additional information about EPA's public docket, visit http://www.epa.gov/dockets.
Abstract: The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subpart YYYYYY. Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative.
Form Numbers: None.
Respondents/affected entities: Owners and operators of area source ferroalloys production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63, subpart YYYYYY).
Estimated number of respondents: 10 (total).
Frequency of response: Initially and annually.
Total estimated burden: 350 hours (per year). Burden is defined at 5 CFR 1320.3(b).
Total estimated cost: $35,000 (per year), includes $0 annualized capital or operation & maintenance costs.
Changes in the Estimates: There is a slight increase of five hours in the total estimated respondent burden compared with the ICR current approved by OMB. This is due to the rounding of estimates.
Courtney Kerwin,
Acting Director, Collection Strategies Division.
[FR Doc. 2015-09361 Filed 4-21-15; 8:45 am]
BILLING CODE 6560-50-P