80 FR 12 pgs. 2777-2778 - Delayed Applications

Type: NOTICEVolume: 80Number: 12Pages: 2777 - 2778
FR document: [FR Doc. 2015-00707 Filed 1-16-15; 8:45 am]
Agency: Transportation Department
Sub Agency: Pipeline and Hazardous Materials Safety Administration
Official PDF Version:  PDF Version
Pages: 2777, 2778

[top] page 2777

DEPARTMENT OF TRANSPORTATION

Pipeline and Hazardous Materials Safety Administration

Delayed Applications

AGENCY:

Office of Hazardous Materials Safety, Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT.

ACTION:

List of application delayed more than 180 days.

SUMMARY:

In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.

FOR FURTHER INFORMATION CONTACT:


[top] Ryan Paquet, Director, Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building, PHH-30, 1200 New Jersey Avenue Southeast, Washington, DC 20590-0001, (202) 366-4535. page 2778

Key to "Reason for Delay"

1. Awaiting additional information from applicant

2. Extensive public comment under review

3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis

4. Staff review delayed by other priority issues or volume of special permit applications

Meaning of Application Number Suffixes

N-New application

M-Modification request

R-Renewal Request

P-Party To Exemption Request

Issued in Washington, DC, on January 8, 2015.

Donald Burger,

Chief, General Approvals and Permits.

Application No. Applicant Reason for delay Estimated date of completion
15642-M Praxair Distribution, Inc., Danbury, CT 4 02-28-2015
15832-M Baker Petrolite Corporation (BPC), Sugar Land, TX 4 2-28-2015
14617-M Western International Gas & Cylinders, Inc., Bellville, TX 4 01-31-2015
13359-M BASF Corporation, Florham Park, NJ 4 01-31-2015
12116-M Proserv UK Ltd., East Tullos, Aberdeen 4 02-28-2015
11903-M Comptank Corporation, Bothwell, ON 4 01-31-2015
8451-M Special Devices, Inc., Mesa, AR 4 01-31-2015
15552-M Poly-Coat Systems, Inc., Liverpool, TX 4 03-15-2015
9847-M FIBA Technologies, Inc., (FIBA) Millbury, MA 4 12-31-2014

Application No. Applicant Reason for delay Estimated date of completion
15767-N Union Pacific Railroad Company, Omaha, NE 1 01-31-2015
16188-N UTLX Manufacturing, LLC, Alexandria, LA 4 01-31-2015
16039-N UTLX Manufacturing LLC, Alexandria, LA 4 02-28-2015
16061-N Battery Solutions, LLC, Howell, MI 4 02-28-2015
16137-N Diversified Laboratory Repair, Gaithersburg, MD 4 02-28-2015
16118-N Toyota Motor Sales, U.S.A., Inc., Torrance, CA 4 01-31-2015
16154-N Patriot Fireworks, LLC, Ann Arbor, MI 4 01-31-2015
16189-N Coffeyville Resources Nitrogen Fertilizers, LLC, Kansas City, KS 4 02-28-2015
16190-N Digital Wave Corporation, Centennial, CO 4 02-28-2015
16191-N Solvay Fluorides LLC, Houston, TX 4 03-31-2015
16198-N Fleischmann's Vinegar Company, Inc., Cerritos, CA 4 02-28-2015
16181-N Arc Process, Inc., Pflugerville, TX 4 01-31-2015
16220-N Americase, Waxahache, TX 4 02-28-2015
16193-N CH&I Technologies, Inc., Santa Paula, CA 4 03-31-2015
16199-N Schlumberger Oilfield UK Plc, Dyce Aberdeen, UK 4 02-28-2015
15991-N Dockweiler, Neustadt-Glewe, Germany 4 01-31-2015
16001-N VELTEK, Malvern, PA 4 12-31-2014

Application No. Applicant Reason for delay Estimated date of completion
11602-R East Tennessee Iron & Metal, Inc., Rogersville, TN 4 01-31-2015
11860-R GATX Corporation, Chicago, IL 4 02-28-2015
15580-R Wisconsin Central Ltd., Homewood, IL 4 02-28-2015

[FR Doc. 2015-00707 Filed 1-16-15; 8:45 am]

BILLING CODE 4910-60-P