79 FR 168 pgs. 51483-51484 - Drawbridge Operation Regulations; Townsend Gut, Boothbay Harbor and Southport, ME
Type: RULEVolume: 79Number: 168Pages: 51483 - 51484
Pages: 51483, 51484Docket number: [Docket No. USCG-2014-0762]
FR document: [FR Doc. 2014-20541 Filed 8-28-14; 8:45 am]
Agency: Homeland Security Department
Sub Agency: Coast Guard
Official PDF Version: PDF Version
[top]
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0762]
Drawbridge Operation Regulations; Townsend Gut, Boothbay Harbor and Southport, ME
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of deviation from drawbridge regulation.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the operation of the Southport SR27 Bridge across Townsend Gut, mile 0.7, between Boothbay Harbor and Southport, Maine. The bridge owner, Maine Department of Transportation will be performing structural repairs at the bridge. This deviation allows the bridge to operate on a temporary schedule for eleven weeks to facilitate scheduled bridge maintenance.
DATES:
This deviation is effective from September 8, 2014 through November 22, 2014.
ADDRESSES:
[top] The docket for this deviation, [USCG-2014-0762] is
FOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email Mr. John McDonald, Project Officer, First Coast Guard District, telephone (617) 223-8364, john.w.mcdonald@uscg.mil . If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
The Southport SR27 Bridge, across Townsend Gut, mile 0.7, between Boothbay Harbor and Southport, Maine, has a vertical clearance in the closed position of 10 feet above mean high water and 19 feet above mean low water. The bridge operating regulations are listed at 33 CFR 117.537.
The waterway is transited by recreational and commercial fishing boats.
The bridge owner, Maine Department of Transportation, requested a temporary deviation from the normal operating schedule to facilitate deck repairs at the bridge.
Under this temporary deviation the Southport SR27 Bridge shall operate as follows: From September 8, 2014 through November 22, 2014, the draw shall open on signal at 12 a.m., 3 a.m., 6 a.m., 9 a.m., 12 p.m., 3 p.m., 6 p.m., and 9 p.m. The draw shall remain in the closed position from 6 p.m. through 6 a.m. on twelve dates to be announced in the Local Notice to Mariners (LNTM) and via a broadcast notice to mariners (BNTM), at least two weeks prior to each closure date. There is an alternate route for navigation around Southport. Vessels that can pass under the bridge in the closed position may do so at all times.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Dated: August 15, 2014.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2014-20541 Filed 8-28-14; 8:45 am]
BILLING CODE 9110-04-P