79 FR 126 pgs. 37196-37197 - Drawbridge Operation Regulation; Sacramento River, Isleton, CA
Type: RULEVolume: 79Number: 126Pages: 37196 - 37197
Pages: 37196, 37197Docket number: [Docket No. USCG-2014-0475]
FR document: [FR Doc. 2014-15289 Filed 6-27-14; 11:15 am]
Agency: Homeland Security Department
Sub Agency: Coast Guard
Official PDF Version: PDF Version
[top]
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0475]
Drawbridge Operation Regulation; Sacramento River, Isleton, CA
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of deviation from drawbridge regulation.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Isleton Drawbridge across Sacramento River, mile 18.7, at Isleton, CA. The deviation is necessary to allow the bridge owner to make critical repairs to the bridge deck. This deviation allows the bridge to open with 15 minutes advance notice during the deviation period.
DATES:
This deviation is effective from 10 p.m. on June 27, 2014, until 5 a.m. on June 30, 2014.
ADDRESSES:
The docket for this deviation, [USCG-2014-0475], is available at http://www.regulations.gov . Type the docket number in the "SEARCH" box and click "SEARCH." Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
If you have questions on this temporary deviation, call or email David H. Sulouff, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510-437-3516, email David.H.Sulouff@uscg.mil . If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
[top] The California Department of Transportation (Caltrans) has requested a temporary change to the operation of the Isleton Drawbridge, mile 18.7, over Sacramento River, at Isleton, CA. The drawbridge
During the deviation period, either leaf of the double bascule drawspan will require 15 minutes to raise it to the fully open position. The other leaf will be secured open. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised.
Vessels able to pass through the bridge in the closed position may do so at anytime. The bridge will be able to open for emergencies upon 15 minutes advance notice and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Dated: June 17, 2014.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2014-15289 Filed 6-27-14; 11:15 am]
BILLING CODE 9110-04-P