78 FR 181 pgs. 57375-57377 - Sunshine Act Meeting Notice

Type: NOTICEVolume: 78Number: 181Pages: 57375 - 57377
FR document: [FR Doc. 2013-22777 Filed 9-16-13; 11:15 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version:  PDF Version
Pages: 57375, 57376, 57377

[top] page 57375

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

Sunshine Act Meeting Notice

The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 552b:

AGENCY HOLDING MEETING:

Federal Energy Regulatory Commission.

DATE AND TIME:

September 19, 2013 10:00 a.m.

PLACE:

Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS:

Open.

MATTERS TO BE CONSIDERED:

Agenda.

* Note-Items listed on the agenda may be deleted without further notice.

CONTACT PERSON FOR MORE INFORMATION:

Kimberly D. Bose, Secretary, Telephone (202) 502-8400.

For a recorded message listing items struck from or added to the meeting, call (202) 502-8627.


[top] This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room. page 57376

Item No. Docket No. Company
Administrative
A-1 AD02-1-000 Agency Business Matters.
A-2 AD02-7-000 Customer Matters, Reliability, Security and Market Operations.
A-3 AD12-12-000 Coordination Between Natural Gas and Electricity Markets.
Electric
E-1 ER12-1179-003 Southwest Power Pool, Inc.
ER12-1179-004
ER12-1179-005
ER13-1173-000
E-2 OMITTED
E-3 OMITTED
E-4 RM12-16-000 Generator Requirements at the Transmission Interface.
E-5 RM13-16-000 Generator Verification Reliability Standards.
E-6 RM10-11-002 Integration of Variable Energy Resources.
E-7 ER11-2814-000 PJM Interconnection, L.L.C.
ER11-2814-001
ER11-2815-001
ER11-2815-002
ER11-2815-004
E-8 ER11-2814-000 PJM Interconnection, L.L.C.
ER11-2814-001
ER11-2815-000
ER11-2815-001
ER11-2815-002
ER11-2815-004
ER11-3279-000 Midwest Independent Transmission System Operator, Inc.
ER11-3279-001
E-9 ER12-91-000 PJM Interconnection, L.L.C.
ER12-91-002 Duke Energy Ohio, Inc., and
ER12-91-005 Duke Energy Kentucky, Inc.
ER12-92-000
ER12-92-002
ER12-92-005
E-10 OMITTED
E-11 ER13-2031-000 Southwest Power Pool, Inc.
ER13-2033-000
E-12 ER12-2292-001 Southwest Power Pool, Inc.
ER12-2292-002
ER12-2292-003
ER13-1123-000
Gas
G-1 RP12-813-002 Gulf South Pipeline Company, LP.
RP12-813-001
G-2 RP13-423-002 Rockies Express Pipeline LLC.
RP12-765-002
Hydro
H-1 P-2149-160 Public Utility District No. 1 of Douglas County, Washington.
H-2 P-2114-261 Public Utility District No. 2 of Grant County, Washington.
H-3 P-2197-103 Alcoa Power Generating Inc.
H-4 P-2790-059 Boott Hydropower, Inc., and Eldred L. Field Hydroelectric Facility Trust.
H-5 P-2216-081 New York Power Authority.
H-6 P-2232-598 Duke Energy Carolinas, LLC.
Certificates
C-1 CP06-407-008 Missouri Interstate Gas, LLC.
Missouri Gas Company, LLC.
Missouri Pipeline Company, LLC.
C-2 CP13-3-000 Tennessee Gas Pipeline Company, L.L.C.


[top] page 57377 Issued September 12, 2013.

Kimberly D. Bose,

Secretary.

A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.

Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.

[FR Doc. 2013-22777 Filed 9-16-13; 11:15 am]

BILLING CODE 6717-01-P