78 FR 67 pg. 20912 - Southern Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization
Type: NOTICEVolume: 78Number: 67Page: 20912
Docket number: [Docket No. CP13-109-000]
FR document: [FR Doc. 2013-08064 Filed 4-5-13; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-109-000]
Southern Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization
Take notice that on March 25, 2013 Southern Natural Gas Company, L.L.C. (Southern), 569 Brookwood Village, Suite 749, Birmingham, Alabama 35209, filed in the above Docket, a prior notice request pursuant to sections 157.205 and 157.216 of the Commission's regulations under the Natural Gas Act (NGA) and Southern's authorization in Docket No. CP82-406-000, for authorization to make certain modifications at its DeArmanville Compressor Station in order to increase firm transportation capacity on its North Main Pipeline System, and to make similar modifications at its Auburn Compressor Station and Selma Compressor Station in order to increase firm transportation capacity on its South Main Pipeline System, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, contact (202) 502-8659.
Any questions concerning this application may be directed to Pamela R. Donaldson, Sr. Regulatory Analyst II, P.O. Box 2563, Birmingham, Alabama 35202, at (205) 325-3739.
Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission's staff may, pursuant to section 157.205 of the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site ( www.ferc.gov ) under the "e-Filing" link.
Dated: April 2, 2013 .
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-08064 Filed 4-5-13; 8:45 am]
BILLING CODE 6717-01-P