78 FR 74 pgs. 22870-22871 - Free Flow Power Corporation;Notice of Application Accepted for Filingand Soliciting Motions To Intervene and Protests
Type: NOTICEVolume: 78Number: 74Pages: 22870 - 22871
Docket number: [Project No. 13346-003]
FR document: [FR Doc. 2013-09011 Filed 4-16-13; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13346-003]
Free Flow Power Corporation;Notice of Application Accepted for Filingand Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: P-13346-003.
c. Date filed: December 3, 2012.
d. Applicant: Free Flow Power Corporation (Free Flow Power), on behalf of its subsidiary PayneBridge, LLC.
e. Name of Project: Williams Dam Water Power Project.
f. Location: At the existing Williams dam owned by the Indiana Department ofNatural Resources on the East Fork White River in Lawrence County,Indiana. No federal lands are occupied by the project works or located within the project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Ramya Swaminathan, Chief Operating Officer, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or at (978) 283-2822.
Daniel Lissner, General Counsel, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or at (978) 283-2822.
Alan Topalian, Regulatory Attorney, Free Flow Power Corporation, 239 Causeway Street, Suite 300, Boston, MA 02114; or at (978) 283-2822.
i. FERC Contact: Aaron Liberty at (202) 502-6862 or by email at Aaron.Liberty@ferc.gov .
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready for environmental analysis at this time.
l. The proposed Williams Dam Water Power Project would be located in Lawrence County, Indiana at the existing Williams dam on the East Fork White River. The 21.3-foot-high, 294-foot-long Williams dam is currently owned by the Indiana Department of Natural Resources and impounds a 553-acre reservoir at a normal pool elevation of 472.2 North American Vertical Datum of 1988 (NAVD 88). In addition to the dam, proposed project facilities would include: (1) An 80-foot-long, 21.5-foot-high, 100-foot-wide intake structure with trashracks having 3-inch clear bar spacing; (2) a 126-foot-long, 81-foot-wide powerhouse integral to the dam; (3) four turbine-generator units with a combined installed capacity of 4.0 megawatts; (4) a 40-foot by 40-foot substation; (5) a 265-foot-long, three-phase, 12.5-kilovolt overhead transmission line connecting the project's substation to local utility distribution lines; and (6) other appurtenant facilities.
The proposed project would operate in a run-of-river mode and the water surface elevation of the impoundment would be maintained at the existing normal pool elevation (crest of the dam spillway) or above. The average annual generation would be about 17,850 megawatt-hours.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice.
Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title "PROTEST" or "MOTION TO INTERVENE," "NOTICE OF INTENT TO FILE COMPETING APPLICATION," or "COMPETING APPLICATION;" (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
Dated: April 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-09011 Filed 4-16-13; 8:45 am]