78 FR 247 pg. 77670 - Zero Rate Reactive Power Rate Schedules; Notice Allowing Post-Workshop Comments
Type: NOTICEVolume: 78Number: 247Page: 77670
Page: 77670Docket number: [Docket No. AD14-1-000]
FR document: [FR Doc. 2013-30547 Filed 12-23-13; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD14-1-000]
Zero Rate Reactive Power Rate Schedules; Notice Allowing Post-Workshop Comments
On December 11, 2013, a Commission staff-led workshop explored the mechanics of filing reactive power rate schedules for which there is no compensation.1Interested persons are invited to file written comments focused on the mechanics of filing reactive power rate schedules for which there is no compensation.
Footnotes:
1 The workshop was held in response to the Commission's directive in Chehalis Power Generating, L.P., Docket No. ER05-1056-007. Chehalis Power Generating, L.P., 145 FERC ¶ 61,052 (2013).
Comments should be filed with the Commission in this docket, Docket No. AD14-1-000, on or before 5:00 p.m. Eastern Time on January 24, 2014.
A link to the workshop webcast can be found here: http://stream.capitolconnection.org/capcon/ferc/ferc.htm.
Dated: December 17, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-30547 Filed 12-23-13; 8:45 am]
BILLING CODE 6717-01-P