78 FR 196 pgs. 61984-61985 - Copper Valley Electric Association, Inc.; Notice of Application To Amend License and Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Type: NOTICEVolume: 78Number: 196Pages: 61984 - 61985
Pages: 61984, 61985Docket number: [Project No. 13124-005]
FR document: [FR Doc. 2013-24410 Filed 10-8-13; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13124-005]
Copper Valley Electric Association, Inc.; Notice of Application To Amend License and Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Type of Application: Amendment to License.
b. Project No: 13124-005.
c. Date Filed: September 27, 2013.
d. Applicant: Copper Valley Electric Association, Inc.
e. Name of Project: Allison Creek Hydroelectric Project.
f. Location: On Allison Creek in Valdez, Alaska. This project does not occupy any Federal Lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway, Glennallen, AK 99588, (907) 822-3211
i. FERC Contact: Steven Sachs at (202) 502-8666; or Steven.Sachs@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests, is 15 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file any motion to intervene, protest, comments, and/or recommendations using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov , (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P-13124-005.
k. Description of Request: As licensed, the unconstructed project includes an approximately 7,000-foot-long mostly above ground and partially buried penstock and an approximately 4,000-foot-long temporary construction access road. In its application, the licensee proposes to instead bury the penstock for its entire length, construct a 2,700-foot-long temporary construction access road, and drill and blast a 700-foot-long, 16-foot-diameter access tunnel through which a segment of the penstock would be routed.
l. Locations of the Application: This filing may be viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number P-13124 in the docket number field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1-866-208-3676 or email FERCOnlineSupport@ferc.gov , for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above and at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371.
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
[top] o. Filing and Service of Responsive Documents: Any filing must (1) Bear in all capital letters the title "COMMENTS", "PROTEST", or "MOTION TO INTERVENE" as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or
Dated: October 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-24410 Filed 10-8-13; 8:45 am]
BILLING CODE 6717-01-P