77 FR 126 pgs. 38801-38802 - Environmental Impacts Statements; Notice of Availability

Type: NOTICEVolume: 77Number: 126Pages: 38801 - 38802
Docket number: [ER-FRL-9003-7]
FR document: [FR Doc. 2012-16031 Filed 6-28-12; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9003-7]

Environmental Impacts Statements; Notice of Availability

Responsible Agency: Office of FederalActivities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact Statements

Filed 06/18/2012 Through 06/22/2012

Pursuant to 40 CFR 1506.9.

Notice

Section 309(a) of the Clean Air Act requires that EPAmake public its comments on EISs issued by other Federalagencies. EPA's comment letters on EISs are available at: http://www.epa.gov/compliance/nepa/eisdata.html .

SUPPLEMENTARY INFORMATION:

EPA is seeking agencies to participate in its e-NEPA electronicEIS submission pilot. Participating agencies can fulfill all requirementsfor EIS filing, eliminating the need to submit paper copies to EPAHeadquarters, by filing documents online and providing feedback onthe process. To participate in the pilot, register at: https://cdx.epa.gov .

EIS No. 20120197, Draft EIS, USFS, ID, Golden Hand No. 1 and No. 2 Lode Mining ClaimsProject, Krassel Ranger District, PayetteNational Forest, Valley and Idaho Counties, ID,Comment Period Ends: 08/13/2012, Contact:Jeff Hunteman 208-634-0434.

EIS No. 20120198, Draft EIS, FHWA, TX, Grand Parkway (State Highway 99) Segment B,Construction, from SH-288 to IH-45, USACESection 404 Permit, Brazoria and GalvestonCounties, TX, Comment Period Ends: 09/26/2012,Contact: Gregory Punske 512-536-5960.

EIS No. 20120199, Final EIS, RUS, MS, ADOPTION-Kemper County Integrated GasificationCombined Cycle Project, To Provide FinancialAssistance, Kemper County, MS, Review PeriodEnds: 07/30/2012, Contact: Emily Orler202-720-1414.

EIS No. 20120200, Final EIS, USFS, MT, Stillwater Mining Reused Water Management Plansand Boe Ranch LAD, USACE Section 404 Permit,Beartooth Ranger District, Stillwater County, MT,Review Period Ends: 07/30/2012, Contact:Pat Pierson 406-255-1441.

EIS No. 20120201, Draft Supplement, USACE, IN, Indianapolis North Flood Damage Reduction,Modifications to Project Features and Realignmentof the South Warfleigh Section, Marion County,IN, Comment Period Ends: 08/13/2012, Contact:Michael Turner 502-315-6900.

EIS No. 20120202, Final EIS, FAA, NM, Taos Regional Airport Layout Plan, Improvements,Construction and Operation of VariousImprovements, Town of Taos, Taos County, NM,Review Period Ends: 07/30/2012, Contact:Dean McMath 817-222-5617.

EIS No. 20120203, Final EIS, BLM, WY, Visual Resource Management (VRM) Plan, Amendment,Class Designation, Carbon County, WY, ReviewPeriod Ends: 07/30/2012, Contact: Pamela Murdock307-775-6259.

EIS No. 20120204, Final EIS, BLM, WY, Chokecherry and Sierra Madre Wind Energy Project,Development of a Wind Farm, Carbon County, WY,Review Period Ends: 07/30/2012, Contact:Pamela Murdock 307-775-6259.

EIS No. 20120205, Draft EIS, BLM, CA, Alta East Wind Project, Development of a318-megawatt Wind Energy Facility, Kern County,CA, Comment Period Ends: 09/26/2012, Contact:Jeffery Childers 951-697-5308.

EIS No. 20120206, Final EIS, NPS, AK, Denali Park Road Final Vehicle Management Plan,Implementation, Denali National Park andPreserve, AK, Review Period Ends: 07/30/2012,Contact: Miriam Valentine 907-733-9102.

EIS No. 20120207, Final EIS, USACE, LA, Mississippi River Gulf Outlet EcosystemRestoration, To Develop a Comprehensive EcosystemRestoration Plan to Restore the Lake BorgneEcosystems, LA and MS, Review Period Ends:07/30/2012, Contact: Tammy Gilmore 504-862-1002.

EIS No. 20120208, Final EIS, USFS, MT, Troy Mine Revised Reclamation Plan, Approval of aReclamation Plan and Permits, Kootenai NationalForest, Lincoln County, MT, Review Period Ends:07/30/2012, Contact: Bobbie Lacklen 406-283-7681.

EIS No. 20120209, Draft EIS, USN, FL, Naval Air Station Key West Airfield Operations,To Support and Conduct Aircraft TrainingOperations, Florida Keys, Monroe County, FL,Comment Period Ends: 08/13/2012, Contact:John Conway 904-542-6870.

EIS No. 20120210, Final EIS, BIA, WI, Menominee Casino-Hotel 223-Acre Fee-to-TrustTransfer and Casino Project, Implementation, NPDESPermit, Kenosha County, WI, Review Period Ends:07/30/2012, Contact: Scott Doig 612-725-4514This document is available on the Internet at: www.kenoshaeis.com .

EIS No. 20120211, Draft EIS, USFWS, OH, Proposed Habitat Conservation Plan and IncidentalTake Permit for the Indiana Bat (Myotis sodalis)for the Buckeye Wind Power Project, Application,Champaign County, OH, Comment Period Ends:09/27/2012, Contact: Megan Seymour 614-416-8993,ext. 16.

Amended Notices

EIS No. 20120150, Draft EIS, FHWA, CA, Interchange 5/State Route 56 Interchange Project,Connection between southbound I-5 to eastboundSR-56 and northbound SR 56 to northbound I-5, SanDiego County, CA, Comment Period Ends:07/17/2012, Contact: Manuel E. Sanchez619-699-7336.Revision to FR Notice Published 05/18/2012,Extending Comment Period from07/02/2012 to 07/17/2012.

EIS No. 20120152, Draft EIS, FHWA, CA, San Diego Freeway (I-405) Improvement Project,between State Route 73 and Interstate 605, USACESection 404 Permit, Orange and Los AngelesCounties, CA, Comment Period Ends: 07/17/2012,Contact: Tay Dam 213-605-2013.Revision to FR Notice Published 5/15/2012;Comment Period Extended from 07/02/2012 to 07/17/2012.

EIS No. 20120192, Final EIS, NMFS, CA, Authorization for Incidental Take andImplementation of Fruit Growers SupplyMultispecies Habitat Conservation Plan, SiskiyouCounty, CA, Review Period Ends: 08/06/2012,Contact: Lisa Roberts, 707-825-5178 NMFS,Yreka Office 530-842-5763 ext. 109 USFWS.Revision to FR Notice Published 6/22/2012; ChangeReview Period from 7/23/2012 to 8/6/2012.

Dated: June 26, 2012.

Cliff Rader,

Director, NEPA Compliance Division, Office of Federal Activities.

[FR Doc. 2012-16031 Filed 6-28-12; 8:45 am]

BILLING CODE 6560-50-P