77 FR 72 pg. 22315 - Environmental Impacts Statements;Notice of Availability

Type: NOTICEVolume: 77Number: 72Page: 22315
Docket number: [ER-FRL-9002-5]
FR document: [FR Doc. 2012-8929 Filed 4-12-12; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9002-5]

Environmental Impacts Statements;Notice of Availability

Responsible Agency: Office of FederalActivities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements

Filed 04/02/2012 Through 04/06/2012

Pursuant to 40 CFR 1506.9

Notice

Section 309(a) of the Clean Air Act requires that EPAmake public its comments on EISs issued by other Federalagencies. EPA's comment letters on EISs are available at: http://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20120098, Draft EIS, USAF, 00 ,F-35A Operational Basing, Beddown and Operationof F-35A Aircraft for the Combat Air Forces atOne or More Locations throughout the ContiguousU.S. from 2015 through 2020, Comment Period Ends: 06/04/2012, Contact: Nicholas Germanos757-764-5994.

EIS No. 20120099, Draft EIS, BLM, CA, Desert Harvest Solar Project, Construction,Operation, Maintenance, and Decommissioning of a150-megawatt Photovoltaic Solar Energy Facilityand Generation-Intertie Transmission Line,Consideration of Issuance of a Right-of-WayGrant, Riverside County, CA, Comment Period Ends: 07/13/2012, Contact: Lynnette Elser 951-697-5233.

EIS No. 20120100, Final EIS, NRC, WA, Generic-License Renewal of Nuclear Plants,Supplement 47 Regarding Columbia GeneratingStation (NUREG-1437), Issuance of a RenewedOperating License for an Additional 20 Years,Benton County, WA, Review Period Ends: 05/14/2012, Contact: Paula Cooper 301-415-2323.

EIS No. 20120101, Draft EIS, USACE, MS, Pascagoula Lower Sound/Bayou Casotte ChannelWidening, Issuance of a Permit to Dredge orExcavate Adjacent to a Federal Navigation Channelin or Affecting Navigable Waters of the U.S.,Jackson County, MS, Comment Period Ends: 05/29/2012, Contact: Philip Hegji 251-690-3222.

EIS No. 20120102, Final Supplement, USFS, MT, Young Dodge Project, Proposed Timber Harvest andAssociate Activities, Updated Information on theFirst 3 Alternatives, Prescribed Burning, Roadand Recreation Management, Kootenai NationalForest, Rexford Ranger District, Lincoln County,MT, Review Period Ends: 05/14/2012, Contact: Moira McKelvey 406-296-2536.

Amended Notices

EIS No. 20120078, Second Draft Supplement, FHWA, TX, Trinity Parkway Project, Construction of aSix-Lane Controlled Access Toll Facility fromIH-35 E/TX-183 to US-175/TX-310, AdditionalInformation on the Compatibility with LeveeRemediation Plans for the Dallas Floodway and NewInformation on Historic Resources, U.S. Army COESection 10 and 404 Permits, Dallas County, TX, Comment Period Ends: 05/18/2012, Contact: Salvador Deocampo 512-536-5950 Revision toFR Notice Published 03/23/2012: ExtendingComment Period from 5/7/2012 to 5/18/2012.

Dated: April 10, 2012.

Cliff Rader,

Director, NEPA Compliance Division,Office of Federal Activities.

[FR Doc. 2012-8929 Filed 4-12-12; 8:45 am]

BILLING CODE 6560-50-P