77 FR 38 pgs. 11522-11523 - Dominion Transmission, Inc.; Notice of Application

Type: NOTICEVolume: 77Number: 38Pages: 11522 - 11523
Docket number: [Docket No. CP12-59-000]
FR document: [FR Doc. 2012-4414 Filed 2-24-12; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version:  PDF Version

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP12-59-000]

Dominion Transmission, Inc.; Notice of Application

On February 10, 2012, Dominion Transmission, Inc. (DTI) filed with the Federal Energy Regulatory Commission (Commission) an application under section 7(c) of the Natural Gas Act and the Rules and Regulations of the Commission's Regulations for authority to establish a protective boundary for the Sabinsville Storage Pool located in Tioga County, Pennsylvania. The expansion would further the integrity and protection of the gas storage field, as more fully detailed in the Application. DTI requests that the Commission issue all required authorizations by August 1, 2012.

Questions concerning this application may be directed to Amanda K. Prestage, Regulatory and Certificates Analyst III, Dominion Transmission, Inc., 701 East Cary Street, Richmond, Virginia 23219, by calling 804-771-4416 or by emailing Amanda.K.Prestage@dom.com.

Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission's public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's FEIS or EA.

There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.

However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.

The Commission encourages electronic submission of protests and interventions in lieu of paper using the "eFiling" link at http://www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at http://www.ferc.gov using the "eLibrary" link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an "eSubscription" link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Comment Date: 5 p.m. Eastern Time on March 8, 2012.

Dated: February 16, 2012.

Kimberly D. Bose,

Secretary.

[FR Doc. 2012-4414 Filed 2-24-12; 8:45 am]

BILLING CODE 6717-01-P