77 FR 241 pg. 74479 - Environmental Impacts Statements;Notice of Availability
Type: NOTICEVolume: 77Number: 241Page: 74479
Docket number: [ER-FRL-9006-5]
FR document: [FR Doc. 2012-30237 Filed 12-13-12; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9006-5]
Environmental Impacts Statements;Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 12/03/2012 Through 12/07/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPAmake public its comments on EISs issued by other Federalagencies. EPA's comment letters on EISs are available at: http://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION:
As of October 1, 2012, EPA will not accept paper copies orCDs of EISs for filing purposes; all submissions on or afterOctober 1, 2012 must be made through e-NEPA.While this system eliminates the need to submit paper or CD copiesto EPA to meet filing requirements, electronic submission does notchange requirements for distribution of EISs for public review andcomment. To begin using e-NEPA, you must first register with EPA'selectronic reporting site- https://cdx.epa.gov/epa_home.asp.
EIS No. 20120379, Final EIS, BLM, CA, West Chocolate Mountains Renewable EnergyEvaluation Area, Proposed California DesertConservation Area Plan Amendment, ImperialCounty, CA, Review Period Ends: 01/14/2013,Contact: Sandra McGinnis 916-978-4427.
EIS No. 20120380, Draft EIS, BLM, AK, Ring of Fire Resource Management Plan Amendment,Haines Block Planning Area, Southeast Alaska,Comment Period Ends: 03/14/2013, Contact:Molly Cobbs 907-267-1221.
EIS No. 20120381, Draft Supplement, NRC, TX, GENERIC-License Renewal of Nuclear PlantsSupplement 48 Regarding South Texas Project,Units 1 and 2 (NUREG 1437) Matagorda County, TX,Comment Period Ends: 02/22/2013, Contact: Tam Tran301-415-3617.
EIS No. 20120382, Draft Supplement, FTA, MN, Central Corridor Light Rail Transit Project,Construction-Related Potential Impacts onBusiness Revenue, St. Paul and Twin CitiesMetropolitan Area, MN, Comment Period Ends:01/30/2013, Contact: Maya Sarna 202-366-5811
EIS No. 20120383, Draft EIS, USACE, CA, Gregory Canyon Landfill, Application for PermitAuthorizing Discharge of Fill in U.S. Waters, SanDiego County, CA, Comment Period Ends:02/12/2013, Contact: William H. Miller602-230-6954.
EIS No. 20120384, Final EIS, BLM, NV, Searchlight Wind Energy Project, NVN-084626 andNVN-086777, Application for Right-of-Way Grant onPublic Land to Develop, Construct, Operate,Maintain and Decommission of a 200 megawatt WindEnergy Facility, USACE Section 404 Permit, ClarkCounty, NV, Review Period Ends: 01/14/2013,Contact: Gregory Helseth 702-515-5173
EIS No. 20120385, Final EIS, DOE, WA, Hanford Site Tank Closure and Waste ManagementProject, Richland, Benton County, WA, ReviewPeriod Ends: 01/14/2013, Contact: Mary Beth Burandt888-829-6347.
EIS No. 20120386, Final EIS, FTA, MD, Red Line Project, Implementation of a newEast-West Light Rail Transit Alignment, BaltimoreCounty, MD, Review Period Ends: 01/28/2013,Contact: Daniel Koenig 202-219-3528.
Amended Notices
EIS No. 20120334, Draft EIS, USFS, OR, Oregon Dunes NRA Management Area 10(C) DesignatedRoutes Project, Central Coast Ranger District,Oregon Dunes National Recreation Area, SiuslawNational Forest, Coos, Douglas, and LaneCounties OR, Comment Period Ends: 01/24/2013,Contact: Angie Morris 541-271-6040.Revision to FR Notice Published 10/26/2012;Extending Comment from 12/10/2012 to 01/24/2013.
Dated: December 11, 2012.
Cliff Rader,
Director, NEPA Compliance Division,Office of Federal Activities.
[FR Doc. 2012-30237 Filed 12-13-12; 8:45 am]
BILLING CODE 6560-50-P