76 FR 18 pgs. 4892-4893 - Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro, LLC; Notice Announcing Preliminary Permit Drawing
Type: NOTICEVolume: 76Number: 18Pages: 4892 - 4893
Docket number: [Project Nos. 13740-000, 13749-000, 13775-000, 13781-000]
FR document: [FR Doc. 2011-1720 Filed 1-26-11; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 13740-000, 13749-000, 13775-000, 13781-000]
Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro, LLC; Notice Announcing Preliminary Permit Drawing
January 20, 2011.
On May 18, 2010, at 8:30 a.m., the Commission received four preliminary permit applications for proposed projects to be located at the C. W. Bill Young Lock and Dam located on the Allegheny River in Allegheny County, Pennsylvania.1The applications were filed by Lock+ Hydro Friends Fund XXXIX, for Project No. 13740-000, FFP Missouri 3, LLC, for Project No. 13749-000, Allegheny 3 Hydro, LLC, for Project No. 13775-000, and Three Rivers Hydro, LLC, for Project No. 13781-000.
Footnotes:
1 The Commission is open each day from 8:30 a.m. to 5 p.m., except Saturdays, Sundays, and holidays. 18 CFR 375.101(c) (2010). The applications were filed between 5 p.m. on Monday May 17, 2010, and 8:30 a.m. on Tuesday May 18, 2010. Under the Commission's Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2010).
Where all permit applicants are municipalities or all permit applicants are non-municipalities, and no applicant's plans are better adapted than the others' to develop, conserve, and utilize in the public interest the water resources of a region, the Commission issues a permit to the applicant who filed first in time.2In this case, because four applications from entities not claiming municipal preference are deemed filed at the same time, the Commission will conduct a random tie breaker to determine priority. In the event that the Commission concludes that no applicant's plans are better adapted than the others, priority will be determined accordingly.
Footnotes:
2 18 CFR 4.37 (2010). See, e.g., BPUS Generation Development, LLC, 126 FERC ¶ 61,132 (2009).
On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the four applicants identified in this notice. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St., NE., Washington, DC 20426. The results of the drawing will be recorded by the Secretary or her designee. A subsequent notice will be issued by the Secretary announcing the results of the drawing.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1720 Filed 1-26-11; 8:45 am]
BILLING CODE 6717-01-P