75 FR 226 pg. 71726 - Central Utah Project Completion Act

Type: NOTICEVolume: 75Number: 226Page: 71726
FR document: [FR Doc. 2010-29582 Filed 11-23-10; 8:45 am]
Agency: Interior Department
Official PDF Version:  PDF Version

DEPARTMENT OF THE INTERIOR

Central Utah Project Completion Act

AGENCY:

Department of the Interior, Office of the Assistant Secretary-Water and Science.

ACTION:

Notice of availability of the Finding of No Significant Impact (FONSI) and associated Final Environmental Assessment (EA)-Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System.

SUMMARY:

On November 15, 2010, the Department of the Interior (Interior), signed a FONSI associated with the Final EA-Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System. Interior has determined that the proposed action as detailed in the FONSI will not have a significant impact on the quality of the human environment, and that an environmental impact statement is not required.

ADDRESSES:

Copies of the EA and FONSI are available for inspection at:

• Central Utah Water Conservancy District, 355 West University Parkway, Orem, Utah 84058-7303.

• Department of the Interior, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606.

The documents are also available at http://www.cuwcd.com and http://www.cupcao.gov.

FOR FURTHER INFORMATION:

Contact Mr. Lee Baxter, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606; (801) 379-1174; e-mail at lbaxter@uc.usbr.gov.

Date: November 17, 2010.

Reed R. Murray,

Program Director, Central Utah Project Completion Act, Department of the Interior.

[FR Doc. 2010-29582 Filed 11-23-10; 8:45 am]

BILLING CODE 4310-RK-P