75 FR 204 pgs. 65320-65321 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 75Number: 204Pages: 65320 - 65321
Docket number: [ER-FRL-8993-3]
FR document: [FR Doc. 2010-26739 Filed 10-21-10; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8993-3]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 10/11/2010 Through 10/15/2010
Pursuant to 40 CFR 1506.9.
Notice
In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register . Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register .
EIS No. 20100410, Final EIS, USFS, OR, Cobbler II Timber Sale and Fuels Reduction Project, ProposingVegetation and Fuels Management to Improve Health and VigorUpland Forest Stands and Reduce Hazardous and Ladder Fuels,Walla Walla Ranger District, Umatilla National Forest, Wallowaand Union Counties, OR, Wait Period Ends: 11/22/2010, Contact:Betsy Kaiser 509-522-6290.This document is available on the Internet at:http:// www.fs.fed.us/r6/uma/projects/readroom/.
EIS No. 20100411, Draft Supplement, USFS, ID, Nez Perce National Forest (NPNF), New Information and ProposedRoute Designations, Designated Routes and Areas for MotorVehicle Use (DRAMVU), Implementation, Idaho County, ID, CommentPeriod Ends: 12/06/2010, Contact: Jennie Fischer 208-983-4048.
EIS No. 20100412, Final Supplement, USFS, CA, Beaverslide Timber Sale and Fuel Treatment Project, AdditionalAnalysis and New Information, Six Rivers National Forest, MadRiver Range District, Trinity County, CA, Wait Period Ends:11/22/2010, Contact: Thomas Hudson 707-574-6233.
EIS No. 20100413, Final EIS, BIA, NY, Cayuga Indian Nation of New York Conveyance of Land into TrustProject, Approval of a 125 + Acre Fee-To-Trust Property Transferof Seven Separate Parcel located in the Village of Union Springsand Town of Springport and Montezuma in Cayuga County and theTown of Seneca Falls in Seneca County, NY, Wait Period Ends:11/22/2010, Contact: Kurt Chandler 615-564-6832.
EIS No. 20100414, Final EIS, USFS, SD, Mystic Range Project Area, Propose to Reauthorize Grazing ofDomestic Livestock on Eight Allotments, Black Hills NationalForest, Pennington and Custer Counties, SD, Wait Period Ends:11/22/2010, Contact: Katie Van Alstyne 605-343-1567.
EIS No. 20100415, Final EIS, DOE, CA, ADOPTION-Ivanpah Solar Electric Generating System (07-AFC-5)Project, Proposal to Construct a 400-m Megawatt ConcentratedSolar Power Tower, Thermal-Electric Power Plant, San BernardinoCounty, CA, Wait Period Ends: 11/22/2010, Contact: MatthewMcMillen 202-586-7248.U.S. DOE has adopted the DOI/BIA's FEIS #20100292 filed 07/29/2010. DOE was a Cooperating Agency for the above FEIS. Recirculation of the document is not necessary under Section 1506.3(b) of the CEQ Regulations.
EIS No. 20100416, Draft EIS, WAPA, CA,Rice Solar Energy Project, Proposed 150 megawatt Solar EnergyGenerating Facility, a 161-kV/230-kV Electrical TransmissionTie-Line and a 161-kV/230-kV Electrical InterconnectionSwitchyard, Riverside County, CA, Comment Period Ends:01/19/2011, Contact: Liana Reilly 720-962-7253.
EIS No. 20100417, Final EIS, USN, 00, United States Marine Corps Joint Strike Fighter F-35B West CoastBasing, To Efficiently and Effectively Maintain CombatCapability and Mission Readiness, CA and AZ, Wait Period Ends:11/22/2010, Contact: Adrianne Saboya 619-532-4742.
EIS No. 20100418, Final EIS, USN, 00, East Coast Basing of the F-35B Project, Construction, Demolitionand/or Modification Airfield Facilities and Infrastructure, SCand NC, Wait Period Ends: 11/22/2010, Contact: Linda Blount757-341-0491.
EIS No. 20100419, Final EIS, USACE, CA, American River Watershed Common Features Project/NatomasPost-Authorization Change Report/Natomas Levee ImprovementProgram, Phase 4b Landside Improvements Project, Sacramento andSutter Counties, CA, Wait Period Ends: 11/22/2010,Contact: Elizabeth Holland 916-557-6763.
EIS No. 20100420, Final EIS, USFS, OR, Mill Creek Allotment Management Plans Project, Reauthorizationof Grazing Permit on Five Grazing Allotments, Lookout MountainRanger District, Ochoco National Forest, Crook County, OR, WaitPeriod Ends: 11/22/2010, Contact: Marcy Anderson 541-416-6463.
EIS No. 20100421, Final EIS, USACE, CA, Sunridge Properties Project, Implementing Alternatives for SixResidential Development Projects City of Rancho Cordova,Sacramento Counties, CA, Wait PeriodEnds: 11/22/2010, Contact:Michael Jewell 916-557-6605.
EIS No. 20100422, Third Final Supplement, FTA, 00, South Corridor Portland-Milwaukie Light Rail Project, Proposalto Develop Light Rail Transit in Final Segment, ConnectingDowntown Portland, OR, the City of Milwaukie and north Clackamasand Mulnomah Counties, OR and Clark County, WA, Wait PeriodEnds: 11/22/2010, Contact: James Saxton 206-220-4311.
Amended Notices
EIS No. 20100326, Draft EIS, NPS, SD, South Unit-Badlands National Park, General Management Plan,Implementation, SD, Comment Period Ends: 11/01/2010, Contact:Eric J. Brunnemann 605-433-5361.Revision of FR Notice Published 08/20/2010: Extending CommentPeriod from10/18/2010 to 11/01/2010.
Dated: October 19, 2010.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division,Office of Federal Activities.
[FR Doc. 2010-26739 Filed 10-21-10; 8:45 am]
BILLING CODE 6560-50-P