73 FR 214 pgs. 65593-65594 - Public Utility District No. 1 of Okanogan County; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Type: NOTICEVolume: 73Number: 214Pages: 65593 - 65594
Docket number: [Project No. 12569-001]
FR document: [FR Doc. E8-26255 Filed 11-3-08; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12569-001]
Public Utility District No. 1 of Okanogan County; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
October 29, 2008.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: Major License.
b. Project No.: 12569-001.
c. Date filed: August 22, 2008.
d. Applicant: Public Utility District No. 1 of Okanogan County.
e. Name of Project: Enloe Hydroelectric Project.
f. Location: On the Similkameen River, near the Town of Oroville, Okanogan County, Washington. The project would occupy about 35.47 acres of federal land under the jurisdiction of the U.S. Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: John R. Grubich, General Manager, Public Utility District No. 1 of Okanogan County, P.O. Box 912, Okanogan, WA 98840, (509) 422-8485.
i. FERC Contact: Dianne Rodman, 888 First Street, NE., Room 6B-02, Washington, DC 20426, (202) 502-6077, dianne.rodman@ferc.gov.
Kim A. Nguyen, 888 First Street, NE., Room 61-01, Washington, DC 20426, (202) 502-6105, kim.nguyen@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site ( http://www.ferc.gov ) under the "e-Filing" link.
k. This application has been accepted for filing, but is not ready for environmental analysis at this time.
l. The Enloe Project would consist of: (1) An existing 315-foot-long and 54-foot-high concrete gravity arch dam with an integrated 276-foot-long central overflow spillway with 5-foot-high flashboards; (2) an existing 76.6-acre reservoir (narrow channel of the Similkameen River) with a storage capacity of 775 acre-feet at 1049.3 feet mean sea level; (3) an 190-foot-long intake canal on the east abutment of the dam diverting flows into the penstock intake structure; (4) a 35-foot-long by 30-foot-wide penstock intake structure; (5) two above-ground 8.5-foot-diameter steel penstocks carrying flows from the intake to the powerhouse; (6) a powerhouse containing two vertical Kaplan turbine/generator units with a total installed capacity of 9.0 megawatts; (7) a 180-foot-long tailrace channel that would convey flows from the powerhouse to the Similkameen River, downstream of the Similkameen Falls; (8) a new substation adjacent to the powerhouse; (9) a new 100-foot-long, 13.2-kilovolt primary transmission line from the substation connecting to an existing distribution line; (10) new and upgraded access roads, and (11) appurtenant facilities. The project is estimated to generate an average of 54 gigawatthours annually.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice.
Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions.
All filings must (1) bear in all capital letters the title "PROTEST" or "MOTION TO INTERVENE," "NOTICE OF INTENT TO FILE COMPETING APPLICATION," or "COMPETING APPLICATION;" (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-26255 Filed 11-3-08; 8:45 am]