73 FR 20 pg. 5552 - Scott Hansen; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene

Type: NOTICEVolume: 73Number: 20Page: 5552
Docket number: [Docket No. DI08-2-000]
FR document: [FR Doc. E8-1627 Filed 1-29-08; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version:  PDF Version

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI08-2-000]

Scott Hansen; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene

January 24, 2008.

Take notice that the following application has been filed with the Commission and is available for public inspection:

a. Application Type: Declaration of Intention.

b. Docket No: DI08-2-000.

c. Date Filed: January 11, 2008.

d. Applicant: Scott Hansen.

e. Name of Project: Hansen Residential Microhydro.

f. Location: The proposed Hansen Residential Microhydro will be located on an unnamed stream in the Haines Borough near Haines, Alaska, at T. 30 S., R. 59 E., sec. 28, Copper River Meridian.

g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).

h. Applicant Contact: Scott Hansen, P.O. Box 1138, Haines, AK 99827; telephone: (907) 766-2323; fax: (907) 766-2365; e-mail: www.shansen@chilkoot-nsn.gov

i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502-8768, or E-mail address: henry.ecton@ferc.gov

j. Deadline for filing comments, protests, and/or motions: February 25, 2008.

All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc.gov under the "e-Filing" link.

Please include the docket number (DI08-2-000) on any comments, protests, and/or motions filed.

k. Description of Project: The proposed run-of-river Hansen Residential Microhydro will include: (1) A 3-foot-high, 10-foot-wide diversion from an unnamed stream into a 4.2 cubic yard concrete intake structure with a 120-cubic-foot capacity; (2) a 6-inch-diameter, 200-foot-long polyethylene penstock; (3) a powerhouse containing a generator with a total capacity of 26 kW; and (4) appurtenant facilities. The proposed project will not be connected to an interstate grid and will not occupy any tribal or federal lands.

When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre-1935 design or operation.

l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the web at http://www.ferc.gov using the "eLibrary" link, select "Docket#" and follow the instructions. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or TTY, contact (202) 502-8659.

m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

n. Comments, Protests, or Motions to Intervene -Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

o. Filing and Service of Responsive Documents -Any filings must bear in all capital letters the title "COMMENTS", "PROTESTS", AND/OR "MOTIONS TO INTERVENE", as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

p. Agency Comments -Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

Kimberly D. Bose,

Secretary.

[FR Doc. E8-1627 Filed 1-29-08; 8:45 am]

BILLING CODE 6717-01-P