72 FR 61 pgs. 15135-15136 - Environmental Impacts Statements; Notice of Availability
Type: NOTICEVolume: 72Number: 61Pages: 15135 - 15136
Docket number: [ER-FRL-6685-4]
FR document: [FR Doc. E7-5903 Filed 3-29-07; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6685-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 03/19/2007 through 03/23/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070108, Final EIS, AFS, AK, Scratchings Timber Sale Project, Timber Harvest up to Approximately 42 Million Board Feet, Suemez Island, Craig RangerDistrict, Tongass National Forest, AK, Wait Period Ends:04/30/2007, Contact: Dennis Sylvia 907-826-3271.
EIS No. 20070109, Draft EIS, NGB, MS, Camp Shelby Joint Force Training Center, Implementation of Installation Mission Support Activities, Renewal of Special UsePermit, DeSoto National Forest, in portions of Forrest, George and Perry Counties, MS, Comment Period Ends: 05/14/2007,Contact: Alisa Dickson 703-607-9620.
EIS No. 20070110, Final EIS, FHW, MN, Trunk Highway 23 Improvements Project, From 0.25 Miles West of CSAH 6 in Kandiyohi County to 0.3 Miles Southwest of CSAH 123Stearns County, City of Paynesville, Kandiyohi and StearnsCounties, MN, Wait Period Ends: 04/30/2007, Contact: CherylMartin 651-291-6120.
EIS No. 20070111, Draft EIS, HUD, WA, Westpark Redevelopment Master Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income Pedestrian Oriented UrbanCommunity, Funding and U.S. Army COE Section 10 Permit, City of Bremerton, Kitsap County, WA, Comment Period Ends: 05/14/2007,Contact: Andrea Spencer 360-473-5283.
EIS No. 20070112, Draft Supplement, SFW, CA, Coachella Valley, Revision to the Multiple Species HabitatConservation Plan (MSHCP), Natural Community Conservation Plan,Santa Rosa and San Jacinto Mountains Trails Plan, Issuance of Incidental Take Permit, Riverside County, CA, Comment PeriodEnds: 05/29/2007, Contact: Therese O'Rourke 760-431-9440.
EIS No. 20070113, Draft Supplement, TVA, TN, Watts Bar Nuclear Plant Unit 2, Completion and Operation,Updated Information on Extensive Environmental Record, RheaCounty, TN, Comment Period Ends: 05/14/2007, Contact: Ruth M. Horton 865-632-3719.
EIS No. 20070114, Draft EIS, USA, NM, Cannon Air Force Base (AFB), Proposal to Beddown, or Locate AirForce Special Operations Command (AFSOC), Implementation, BaseRealignment and Closure (BRAC), NM, Comment Period Ends:05/14/2007, Contact: Carl Hoffman 850-884-5984.
EIS No. 20070115, Draft EIS, FAA, FL, Fort Lauderdale-Hollywood International Airport, ProposedDevelopment and Extension of Runway 9R/27L and other AssociatedAirport Projects, Funding, U.S. Army COE Section 404 Permit andNPDES Permit, Fort Lauderdale, Broward County, FL, CommentPeriod Ends: 05/14/2007, Contact: Virginia Lane 407-812-6331
Ext. 129.
EIS No. 20070116, Draft EIS, AFS, 00, Norwood Project, Proposes to Implement Multiple ResourceManagement Actions, Black Hills National Forest , Hell CanyonRanger District, Pennington County, SD and Weston and CrookCounties, WY, Comment Period Ends: 05/14/2007, Contact: MichaelLloyd 605-673-4853.
EIS No. 20070117, Final EIS, AFS, PA, Allegheny National Forest, Proposed Revised Land and ResourceManagement Plan, Preferred Alternative is Cm, Implementation,Elk, Forest, McKean and Warren Counties, PA, Wait Period Ends:04/30/2007,Contact: William Connelly 814-723-5150.
EIS No. 20070118, Final EIS, IBR, CA, Folsom Dam Safety and Flood Damage Reduction Project, AddressingHydrologic, Seismic, Static, and Flood Management Issues,Sacramento, El Dorado and Placer Counties, CA, Wait Period Ends:04/30/2007, Contact: Shawn Oliver 916-989-7256.
EIS No. 20070119, Draft EIS, NOA, AK, Programmatic-Outer Continental Shelf Seismic Surveys in the Beaufort and Chukchi Seas, Proposed Offshore Oil and Gas SeismicSurvey, AK, Comment Period Ends: 05/14/2007, Contact: William T. Hogarth 301-713-1632.
EIS No. 20070120, Draft EIS, FRC, SC, Santee Cooper Hydroelectric Project (FERC. No. 199), Relicensing for Existing 130-megawatt (MW), Santee and Cooper Rivers,Berkeley, Calhoun, Clarendon, Orangeburg and Sumter Counties,SC, Comment Period Ends: 05/29/2007, Contact: Monte J. TerHaar 202-502-6035.
EIS No. 20070121, Draft EIS, FHW, UT, Hyde Park/North Logan Corridor Project, Proposed 200 EastTransportation Corridor between North Logan City and Hyde Park,Funding, Right-of-Way Acquisitions and U.S. Army COE Section 404Permit, Cache County, UT, Comment Period Ends: 05/25/2007,Contact: Edward T. Woolford 801-963-0078 Ext 235.
EIS No. 20070122, Draft EIS, BLM, 00, Overland Pass Natural Gas Liquids Pipeline Project (OPP),Construction and Operation of 760 Mile Natural Gas LiquidsPipeline, Right-of-Way Grant, KS, WY and CO, Comment PeriodEnds: 05/14/2007, Contact: Tom Hurshman 970-240-5345
EIS No. 20070123, Draft EIS, IBR, CA, North Sonoma County Agricultural Reuse Project, Construct andOperate a Recycled Water to Agricultural Lands, SononaCounty, CA, Comment Period Ends: 05/29/2007, Contact: DouglasKleinsmith 916-978-5034.
EIS No. 20070124, Draft EIS, FHW, NY, NY-112 Reconstruction Project, From I-495 to NY-25 ImproveSafety and Mobility, Town of Brookhaven, Suffolk County, NY,Comment Period Ends: 05/19/2007, Contact: Robert Arnold 518-431-4127.
EIS No. 20070125, Final EIS, NPS, AZ, Walnut Canyon National Monument, General Management Plan,Implementation, Flagstaff Area, Coconina County, AZ, Wait PeriodEnds: 04/30/2007, Contact: Sam Henderson 520-526-1157 Ext 227.
Dated: March 27, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division,Office of Federal Activities.
[FR Doc. E7-5903 Filed 3-29-07; 8:45 am]
BILLING CODE 6560-50-P