72 FR 230 pg. 67723 - Environmental Impacts Statements; Notice of Availability
Type: NOTICEVolume: 72Number: 230Page: 67723
Docket number: [ER-FRL-6693-5]
FR document: [FR Doc. E7-23241 Filed 11-29-07; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6693-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed 11/19/2007 through 11/23/2007.
Pursuant to 40 CFR 1506.9.
EIS No. 20070500, Final EIS, COE, CA, Berth 136-147 [TraPac] Container Terminal Project, Upgrade Existing Wharf Facilities, Install a Buffer Area between the Terminal and Community, U.S. Army COE section 10 and 404 Permit,West Basin Portion of the Port of Los Angeles, CA. Wait PeriodEnds: 01/02/2008. Contact: Dr. Spencer D. MacNeil 805-585-2152.
EIS No. 20070501, Final EIS, BLM, NV, Ely District Resource Management Plan, Implementation, WhitePine, Lincoln Counties and a Portion of Nye County, NV. WaitPeriod Ends: 01/02/2008. Contact: Jeff Weeks 775-289-1825.
EIS No. 20070502, Final EIS, FHW, NE, U.S. Highway 34, Plattsmouth Bridge Study, over the Missouri River between U.S. 75 and I-29, Funding, Coast Guard Permit, U.S. ArmyCOE 10 and 404 Permits, Cass County, NE and Mills County, IA. Wait Period Ends: 01/02/2008. Contact: Edward W. Kosola 402-437-5975.
EIS No. 20070503, Draft EIS, AFS, AK, Navy Timber Sale Project, To Address the Potential Effects of Timber Harvesting on Etolin Island, Wrangell Ranger District,Tongass National Forest, AK. Comment Period Ends: 01/14/2008. Contact: Frank Roberts 907-874-7556.
EIS No. 20070504, Draft EIS, FRC, 00, Rockies Express Pipeline Project, (REX-East), Construction andOperation of Natural Gas Pipeline Facilities, WY, NE, MO, IL, IN and OH, Comment Period Ends: 01/14/2008. Contact: Andy Black 1-866-208-3372.
EIS No. 20070505, Final EIS, WPA, CA, Trinity Public Utilities District Direct Interconnection Project, Construct and Operate a 16-mile Long 60-Kilovolt PowerTransmission Facilities, (DOE/EIS-0389, Trinity County, CA, WaitPeriod Ends: 01/02/2008. Contact: Mark Wieringa 720-962-7448.
Amended Notices
EIS No. 20070420, Draft EIS, SFW, CA, Agua Caliente Tribal Habitat Conservation Plan (THCP), Application for an Incidental Take Permit for 24 CoveredSpecies, Coachella Valley, Riverside County, CA, Comment PeriodEnds: 01/10/2008. Contact: Jim Bartel 760-431-9440. Revision to FR Notice Published 10/12/2007: Correction to Comment Period from 11/26/2007 to 01/10/2008.
EIS No. 20070478, Final EIS, AFS, AK, Helicopter Access to Conduct Forest Inventory and Analysis (FIA) in Wilderness, in Tongass and Chugach National Forest, AK. Wait Period Ends: 12/24/2007. Contact: Ken Post 907-586-8796. Review to FR Notice Published 11/09/2007: Correction to Title.
Dated: November 27, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division,Office of Federal Activities.
[FR Doc. E7-23241 Filed 11-29-07; 8:45 am]
BILLING CODE 6560-50-P