70 FR 165 pgs. 50346-50347 - Environmental Impacts Statements; Notice of Availability
Type: NOTICEVolume: 70Number: 165Pages: 50346 - 50347
Docket number: [ER-FRL-6666-7]
FR document: [FR Doc. 05-17036 Filed 8-25-05; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6666-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 08/15/2005 Through 08/19/2005.Pursuant to 40 CFR 1506.9.
EIS No. 20050343, Final EIS, BLM, ND, West Mine Area, Freedom Mine, Federal Coal Lease Application, Mercer County, ND, Wait Period Ends: 9/26/2005, Contact: Allen Ollila 701-227-7713.
EIS No. 20050344, Final EIS, NRC, WI, Generic-License Renewal for Point Beach Nuclear Plant, Units 1 and 2, Supplement 23 to NUREG-1437 (TAC Nos. MC2049 and MC2050),Lake Michigan, Manitowoc County, WI, Wait Period Ends:09/26/2005, Contact: Stacey Imboden 301-415-2462.
EIS No. 20050345, Final Supplement, BLM, NV, Ruby Hill Mine Expansion-East Archimedes Project, Extension of Existing Open Pit and Expansion of Two Existing Waste Rock Disposal Areas, Plan-of-Operations Permit, Eureka County, NV, Wait Period Ends: 09/26/2005, Contact: Caleb Hiner 775-635-4052.
EIS No. 20050346, Draft EIS, DOA, NV, White Pine Grant-Quinn Oil and Gas Leasing Project,Exploration and Development, Humboldt-Toiyabe National Forest,Ely Ranger District, White Pine, Nye and Lincoln Counties, NV,Comment Period Ends: 10/11/2005, Contact: Loretta Cartner 775-289-5120.
EIS No. 20050347, Draft EIS, DOE, ME, Bangor Hydro-Electric Northeast Reliability Interconnect,Construct, Connect, Operate and Maintain an ElectricTransmission Line, Amend Presidential Permit (PP-89),DOE/EIS-0372, Hancock, Penobscot and Washington Counties, ME,Comment Period Ends: 10/11/2005, Contact: Dr. Jerry Pell 202-586-3362.
EIS No. 20050348, Draft EIS, NPS, WA, Ebey's Landing National Historical Reserve General ManagementPlan, Implementation, Town of Coupeville, Island County, WA,Comment Period Ends: 12/01/2005, Contact: Rob Harbour 360-678-6084.
EIS No. 20050349, Draft Supplement, COE, FL, Central and Southern Florida Project, Tamiami TrailModifications, Modified Water Deliveries to Everglades NationalPark, Authorized Flow of Water from WCA-3B and the L-29 CanalNorth of the Tamiami Trail, Dade County, FL, Comment Period Ends:10/11/2005, Contact: Barbara Cintron 904-232-1692.
EIS No. 20050350, Draft EIS, COE, CA, Encinitas/Solana Beach Shoreline Protection Project, To ProtectPublic Safety and Reduce Storm-Related Damages to CoastalStructures, Cities of Encinitas and Solana Beach, San DiegoCounty, CA, Comment Period Ends: 10/11/2005, Contact: ShannonDellaquila 213-452-3846.
Amended Notices
EIS No. 20050202, Draft EIS, CGD, 00 , Programmatic -Vessel and Facility Response Plans for Oil: 2003Removal Equipment Requirements and Alternative TechnologyRevisions, To Increase the Oil Removal Capability, U.S.Exclusive Economic Zone (EEZ), United States, Alaska, Guam, Puerto Rico and other U.S. Territories, Comment Period Ends:9/6/2005, Contact: Brad McKitrick 202-267-0995.
Revision of FR Notice Published on 05/27/2005: Extending CEQComment Period Ending 8/1/2005 has been Extended to 9/6/2005.
EIS No. 20050329, Final EIS, NPS, ID, Craters of the Moon National Monument and Preserve, Update and Consolidate Management Plans, into One Comprehensive Plan, Snake River Plain, Butte, Blaine, Lincoln, and Minidoka Counties, ID, Wait Period Ends: 09/26/2005,Contact: Adrienne Anderson 303-987-6730.
Revision of FR Notice Published on 08/12/2005: CEQ Wait Period Ending 9/12/2005 has been Reestablished to 09/26/2005. Due to Incomplete Distribution of the FEIS at the time of Filing with USEPA under Section 1506.9 of the CEQ Regulations.
Dated: August 23, 2005.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 05-17036 Filed 8-25-05; 8:45 am]
BILLING CODE 6560-50-P