70 FR 17 pg. 3919 - California Independent System Operator Corporation, Pacific Gas and Electric Company, San Diego Gas Electric Company, Southern California Edison Company; Notice of Compliance Filing

Type: NOTICEVolume: 70Number: 17Page: 3919
Docket number: [Docket Nos. ER04-445-005, ER04-435-008, ER04-441-004, ER04-443-004]
FR document: [FR Doc. E5-307 Filed 1-26-05; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version:  PDF Version

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. ER04-445-005, ER04-435-008, ER04-441-004, ER04-443-004]

California Independent System Operator Corporation, Pacific Gas and Electric Company, San Diego Gas Electric Company, Southern California Edison Company; Notice of Compliance Filing

January 14, 2005.

Take notice that on January 5, 2005, California Independent System Operator Corporation (ISO), Pacific Gas and Electric Company (PGE), San Diego Gas and Electric Company (SDGE), and Southern California Edison Company (SCE) (collectively the Filing Parties) pursuant to section 205 of the Federal Power Act jointly submitted for filing a Standard Large Generator Interconnection Agreement in compliance with Order Nos. 2003 and 2003-A, and the Commission's July 30, 2004, "Order Rejecting Order Nos. 2003 and 2003-A Compliance Filings," 108 FERC ¶ 61,104 (2004). The Filing Parties state that the Standard Large Generator Interconnection Agreement is intended to function as a stand alone pro forma agreement and is not intended to be incorporated into the tariffs of any of the Filing Parties.

Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all parties in this proceeding.

The Commission encourages electronic submission of protests and interventions in lieu of paper using the "eFiling" link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.

This filing is accessible on-line at http://www.ferc.gov, using the "eLibrary" link and is available for review in the Commission's Public Reference Room in Washington, DC. There is an "eSubscription" link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Comment Date: 5 p.m. eastern time on January 26, 2005.

Magalie R. Salas,

Secretary.

[FR Doc. E5-307 Filed 1-26-05; 8:45 am]

BILLING CODE 6717-01-P