68 FR 133 pgs. 41338-41339 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 68Number: 133Pages: 41338 - 41339
Docket number: [ER-FRL-6641-8]
FR document: [FR Doc. 03-17621 Filed 7-10-03; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6641-8]
Environmental Impact Statements; Notice of Availability
ResponsibleAgency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/. Weekly receipt of Environmental Impact StatementsFiled June 30, 2003 Through July 3, 2003Pursuant to 40 CFR 1506.9.
EIS No. 030304, Draft EIS, AFS, AL, Forest Health and Restoration Project, Proposal to Determine the Desired Future Conditions of all ExistingLoblolly Pine Stands, National Forests in Alabama,Bankhead National Forest, Winston, Lawrence and Franklin Counties, AL, Comment Period Ends: August 25, 2003, Contact: John W. Creed (205) 489-5111.
EIS No. 030305, Draft EIS, AFS, ID, Twin CreekTimber Sale Project, Proposal to Cut and RemoveLodgepole Pine Sawtimber, Road Construction/Reconstruction,Montpelier Ranger District, Caribou National Forest,US Corps of Engineers Permit, Bear Lake County, ID,Comment Period Ends: August 25, 2003,Contact: Eric Mattson (208) 847-0375.
EIS No. 030306, Draft EIS, USA, Programmatic EIS-Army Transformation of the 172nd Infantry Brigade (Separate) to a Stryker Brigade CombatTeam (SBCT), Forts Wainwright and Richardson,AK, Comment Period Ends: September 9, 2003,Contact: Kevin Gardner (907) 384-3003.
EIS No. 030307, Final Supplement, FHW, VA, U.S.Route 29 Bypass Improvement, between Route 250Bypass in Charlottesville and the South RivannaRiver in Albemarle, Updated Information, ToConsider the Effects of the Selected Alternative on the South Fork Rivanna River Reservoir and its Watershed, U.S. COE Section 404 Permit,Albemarle County, VA, Wait Period Ends: August 11,2003, Contact: Edward S. Sundra (804) 775-3338.
EIS No. 030308, Final EIS, FHW, PA, NJ, Pennsylvania Turnpike/Interstate 95 InterchangeProject, Pennsylvania Turnpike (I-276) and I-95 in Buck County, PA Connection with ProposedInterstate Improvements Extending east intoBurlington County, NJ, Wait Period Ends: August 15, 2003,Contact: James A. Cheatham (717) 221-3461.
EIS No. 030309, Draft Supplement, FAA, CA, LosAngeles International Airport Proposed MasterPlan Improvements, New Alternative, EnhancedSafety and Security Plan, Los Angeles County, CA,Comment Period Ends: August 25, 2003,Contact: David Kessler (310) 725-3615.
EIS No. 030310, Draft EIS, FHW, TX, TX-45 HighwaySoutheast Study, from Interstate Highway (IH) 35 south at Farm-to-Market (FM)1327 to TX-130/US 183,Proposal to Enhance the Local, Regional, andNational Transportation Systems, Right-of-WayPermit, Travis County, TX, Comment Period Ends: August 25, 2003,Contact: Patrick Bauer (512) 536-5950.
EIS No. 030311, Final Supplement, AFS, MT, Threemile Stewardship Project, AdditionalInformation concerning the Potential Effects on the Goshawk Habitat, Ashland Ranger District,Custer National Forest, Powder and RosebudCounties, MT, Wait Period Ends: August 11, 2003,Contact: Elizabeth McFarland (406) 784-2344.
EIS No. 030312, Draft EIS, IBW, TX, Lower RioGrande Flood Control Project, Addresses the Impacts of Alternative Vegetation MaintenancePractices, Located in the United States portions of the Rio Grande, Cameron, Hidalgo and WillacyCounties, TX, Comment Period Ends: August 29, 2003,Contact: Douglas Echlin (915) 832-4741.
EIS No. 030313, Draft EIS, NPS, NY, NJ, EllisIsland and Statue of Liberty National MonumentDevelopment Concept Plan, Long-TermRehabilitation and Reuse for Historic Buildings,Implementation, New York Harbor, NY and NJ,Comment Period Ends: September 12, 2003,Contact: Gwen Wilder (202) 208-3891.This document is available on the Internet at: http://www.nps.gov/elis.
EIS No. 030314, Draft EIS, NPS, WI, ApostleIslands National Lakeshore Wilderness Study,Wilderness Designation or Nondesignation, Ashland and Bayfield Counties, WI, Comment Period Ends: October 9,2003, Contact: Robert Krumenaker (715) 779-3397.This document is available on the Internet at: http://www.nps.gov/apis/wstudy.htm.
EIS No. 030315, Final EIS, COE, CO, Rueter-HessReservoir Project, Construction and Operation,Proposed Water Supply Reservoir and Off-StreamDam, U.S. COE Section 404 Permit, EndangeredSpecies Act (Section &) and Right-of-Way UsePermit, Located on Newlin Gulch along CherryCreek, Town of Parker, Douglas County, CO,Wait Period Ends: August 11, 2003,Contact: Rodney J. Schwartz (402) 221-4143.
EIS No. 030316, Final EIS, DOD, CA, AS, AK, HI, WA, Ground-Based Midcourse Defense (GMD) ExtendedTest Range (ETR) Project, Proposal to Construct and Operate, Due: August 11, 2003, Contact:Julia Hudson-Elliott (256) 955-4822.This document is available on the Internet at: http://www.acq.osd.mil/bmdo/bmdolink/html/bmdolink.html.
Amended Notices
EIS No. 030301, Final EIS, UAF, CA, Los AngelesAir Force Base Land Conveyance, Construction andDevelopment Project, Transfer Portions of PrivateDevelopment in Exchange for Construction of NewSeismically Stable Facilities, Cities of ElSequndo and Hawthorne, Los Angeles County, CA,Wait Period Ends: August 04, 2003,Contact: Jason Taylor (310) 363-0142.Revision of FR Notice Published on 7/3/2003:CEQ Comment Period Ending 8/18/2003 has been Corrected to CEQ Wait Period Ending 8/4/2003.
Dated: July 8, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-17621 Filed 7-10-03; 8:45 am]
BILLING CODE 6560-50-P