67 FR 95 pg. 34916 - Intent To Prepare a Draft Environmental Impact Statement for the Shrewsbury River Basin, Monmouth County, NJ, Flood Control and Ecosystem Restoration Study: Feasibility Phase;Correction

Type: NOTICEVolume: 67Number: 95Page: 34916
FR document: [FR Doc. 02-12186 Filed 5-15-02; 8:45 am]
Agency: Defense Department
Sub Agency: Department of the Army; Corps of Engineers
Official PDF Version:  PDF Version

DEPARTMENT OF DEFENSE

Department of the Army; Corps of Engineers

Intent To Prepare a Draft Environmental Impact Statement for the Shrewsbury River Basin, Monmouth County, NJ, Flood Control and Ecosystem Restoration Study: Feasibility Phase;Correction

AGENCY:

Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION:

Notice; date correction.

SUMMARY:

The public scoping meetings scheduled for June 13, 2002 from 2 pm to 5 pm and from 7 pm to 9 pm published in the Federal Register on Friday, May 3, 2002 (67 FR 22414) have been rescheduled. The public scoping meetings will now be held on June 14, 2002 from 2 pm to 5 pm and from 7 pm to 9 pm. The meetings will be held in Monmouth County at the Sea Bright Borough Hall gymnasium.

FOR FURTHER INFORMATION CONTACT:

Ms. Melissa Alvarez, Project Biologist, Planning Division, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, Room 2142, New York, New York, 10278-0090, at (212) 264-2008 or at melissa.d.alvarez@usace.army.mil.

SUPPLEMENTARY INFORMATION:

The information for the point of contact for the original notice has also changed, the physical street address has been modified and the email address has been added ( see above).

Luz D. Oritz,

Army Federal Register Liaison Officer.

[FR Doc. 02-12186 Filed 5-15-02; 8:45 am]

BILLING CODE 3710-06-M