65 FR 144 pg. 46074 - Federal Acquisition Regulation; Technical Amendments
Type: RULEVolume: 65Number: 144Page: 46074
Docket number: [FAC 97-19; Item X]
FR document: [FR Doc. 00-18677 Filed 7-25-00; 8:45 am]
Agency: National Aeronautics and Space Administration
Official PDF Version: PDF Version
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Parts 4 and 22
[FAC 97-19; Item X]
Federal Acquisition Regulation; Technical Amendments
AGENCIES:
Department of Defense (DoD), General ServicesAdministration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Technical amendments.
SUMMARY:
This document makes amendments to the FederalAcquisition Regulation in order to update references and make editorial changes.
EFFECTIVE DATE:
July 26, 2000.
FOR FURTHER INFORMATION CONTACT:
The FAR Secretariat, Room 4035, GS Building, Washington, DC 20405, (202) 501-4755.
List of Subjects in 48 CFR Parts 4 and 22
Government procurement.
Dated: July 19, 2000.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.
Therefore, DoD, GSA, and NASA amend 48 CFR parts 4 and 22:
1. The authority citation for 48 CFR parts 4 and 22 continues to read as follows:
Authority:
40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 U.S.C. 2473(c).
PART 4-ADMINISTRATIVE MATTERS
4.803 [Amended]
2. Amend section 4.803 in paragraph (a)(35) by removing the second sentence.
PART 22-APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS
3. Amend the parenthetical in section 22.400 by removing "Construction" and adding "Construction, alteration, or repair" in its place.
[FR Doc. 00-18677 Filed 7-25-00; 8:45 am]
BILLING CODE 6820-EP-P